37-005-31283

Well Details

Well ID: 37-005-31283
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153958
Farm/Lease Name: DYNAMITE
License Status:
Spud Date:
Permit Date: 2017-02-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.869239
Longitude: -79.565903

For data sources see[1][2][3]

Well History

Date Event
2017-02-02 New Permit Application
2017-02-13 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-07 2017-09-12 6,436 16,956,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 NEFE-180 Producers Service Corp Corrosion Inhibitor/Iron Control Coconut oil acid diethanolamine 68603-42-9 5 0.00005714 90.877
Acetic Acid 64-19-7 65 0.000742826 1181.4
2-Propyn-1-ol 107-19-7 5 0.00005714 90.877
Methanol 67-56-1 35 0.000399983 636.139
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00005714 90.877
2-Ethylhexanol 104-76-7 10 0.000114281 181.754
Fatty Acids, tall oil 61790-12-3 5 0.00005714 90.877
Water Company 1 Carrier/Base Fluid Water 7732-18-5 100 88.9703 141,500,000.0
STIMLUBE F Producers Service Corp Friction Reducer Petroleum Distallates 64742-47-8 30 0.0228365 36319.5
Alcohols, ethoxylated 68002-97-1 3.1 0.00235977 3753.01
Alcohols, ethoxylated 68551-12-2 3.1 0.00235977 3753.01
Alcohols, ethoxylated 68439-50-9 3.1 0.00235977 3753.01
BIO CLEAR 1430 Producers Service Corp Biocide Dimethylamine 68439-70-3 0.5 0.00006196 98.546
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.000619622 985.457
Glutaraldehyde 111-30-8 20 0.00247849 3941.83
Other Chemical(s) Listed Above See Trade Name(s) List 2-Ethylhexanol 104-76-7 10 0.000114281 181.754
Methanol 67-56-1 35 0.000399983 636.139
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.000619622 985.457
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.000367893 585.103
Hexamethylene Triamine Penta 34690-00-1 3 0.000367893 585.103
Fatty Acids, tall oil 61790-12-3 5 0.00005714 90.877
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00005714 90.877
Alcohols, ethoxylated 68439-50-9 3.1 0.00235977 3753.01
Dimethylamine 68439-70-3 0.5 0.00006196 98.546
2-Propyn-1-ol 107-19-7 5 0.00005714 90.877
Coconut oil acid diethanolamine 68603-42-9 5 0.00005714 90.877
DETA phosphonate 15827-60-8 3 0.000367893 585.103
Alcohols, ethoxylated 68551-12-2 3.1 0.00235977 3753.01
Alcohols, ethoxylated 68002-97-1 3.1 0.00235977 3753.01
15% HCL Producers Service Corp Acidizing Hydrochloric Acid 7647-01-0 15 0.0935297 148751
SI-1171 Producers Service Corp Scale Inhibitor DETA phosphonate 15827-60-8 3 0.000367893 585.103
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.000367893 585.103
Copolymer of Maleic and Acrylic Acid 52255-49-9 10 0.00122631 1950.34
Hexamethylene Triamine Penta 34690-00-1 3 0.000367893 585.103
Sand (Proppant) Producers Service Corp Proppant Silica Substrate 14808-60-7 100 10.3043 16,388,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 183,266.00 20 0.00 0 0.00 0
2018 SNYDER BROS INC 1,609,211.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 1,174,335.00 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 2,057.50 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 931.18 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 2,130.71 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 8,325.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 316.80 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Produced Fluid 3,788.55 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 2.48 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 46.79 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 1,274.18 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Drill Cuttings 931.18 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials 3.95 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 31,134.30 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 1,191.30 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 94.70 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 SNYDER BROS INC Produced Fluid 64.40 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 292.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 11.41 Tons LANDFILL 100585
2018 SNYDER BROS INC Filter Socks 1.37 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 10,995.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 541.60 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 18.90 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 2,579.50 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2563418 Primary Facility 2017-02-21 Drilling/Alteration No Violations Noted Well permit, site sign, drilling log book all present and up to date. 6'x6' cellar in place. Drilled and set 84' of new 24" conductor pipe. Site and equipment looked good.
2563721 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted Site had been constructed in accordance with the E&S plan contained within the ESCGP. All E&S controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection.
2563722 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted Site had been constructed in accordance with the E&S plan contained within the ESCGP. All E&S controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection.
2604738 Primary Facility 2017-06-16 Routine/Complete Inspection No Violations Noted Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2605967 Primary Facility 2017-06-19 Drilling/Alteration No Violations Noted Rig had TD's hole @ 15,284'-ran and cemented 5 1/2" production casing back to surface with good return on cement. All equipment on site looked ok.
2619508 Primary Facility 2017-07-27 Routine/Complete Inspection No Violations Noted Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2624938 Primary Facility 2017-08-07 Drilling/Alteration No Violations Noted Frac crew set up and just starting a 55 stage frac on this well after a successful pressure test. All equipment on site looked ok.
2626432 Primary Facility 2017-08-14 Drilling/Alteration No Violations Noted Crew set 2 retrievable plugs and performed a negative/positive test after installing each plug. A hanger with BPV was also instaled in well to provide a third barrier while RD existing problematic valves and waiting on replacements at the time of this inspection.
2626495 Primary Facility 2017-08-15 Drilling/Alteration No Violations Noted Frac crew was removing the frac stack valves to wait on new valves from another company to arrive at the time of this inspection. Well head looked ok.
2628192 Primary Facility 2017-08-21 Drilling/Alteration No Violations Noted Frac crew just finished instaling new Weatherford frac stack valves-pressure tested and getting ready to resume frac. All equipment on site looked ok.
2630630 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted Frac crew was getting ready to frac stage 24 of the planned 55 stages at the time of this inspection. Equipment looked ok.
2641950 Primary Facility 2017-09-29 Routine/Complete Inspection No Violations Noted Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2648469 Primary Facility 2017-10-17 Routine/Complete Inspection No Violations Noted All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs.
2665262 Primary Facility 2017-11-29 Routine/Complete Inspection No Violations Noted At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells.
2680914 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H is drilled and appears equipped for production. Wells 1H, 2H, and 4H are also drilled and appear equipped for production.
2709849 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2724360 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 3H is drilled and appears equipped for production. Wells 1H, 2H, and 4H are also drilled and appear equipped for production.
2743232 Primary Facility 2018-06-13 Routine/Partial Inspection No Violations Noted At time of inspection, well 3H is drilled and appears equipped for production. Wells 1H, 2H, and 4H are also drilled and appear equipped for production.
2766742 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2818442 Primary Facility 2018-12-17 Site Restoration No Violations Noted Inspection conducted in response to Post Drilling Restoration Report received by Department.

Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved.

2821029 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]

References