X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31272

Well Details

Well ID: 37-005-31272
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154091
Farm/Lease Name: NOLDER
License Status:
Spud Date:
Permit Date: 2016-12-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.852069
Longitude: -79.558242

For data sources see[1][2][3]

Well History

Date Event
2016-12-01 New Permit Application
2017-04-24 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-24 2018-08-04 6,596 21,078,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 10.0357 19,751,000.0
Water Snyder Brothers, Inc Carrier/Base Fluid Water 7732-18-5 100 89.3759 175,898,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005530 108.84
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.00218866 4307.42
xylene 1330-20-7 5 0.00005530 108.84
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000718222 1413.51
ethylbenzene 100-41-4 1 0.00001106 21.768
ammonium chloride 12125-02-9 1.5 0.000164149 323.057
2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.00223842 4405.36
isoproyl alcohol 67-63-0 5 0.00005530 108.84
Fatty imidazoline 61790-69-0 5 0.00005530 108.84
prop-2-yn-1-ol 107-19-7 5 0.00005530 108.84
didecyldimethylammonium chloride 7173-51-5 8 0.00107801 2121.59
Water 7732-18-5 85 0.439572 865106
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000109433 215.371
oleic acid diethanolamide 93-83-4 1.5 0.000164149 323.057
Hydrochloric Acid (15%) Keane Acid Inhibitor Water 7732-18-5 85 0.439572 865106
Hydrochloric Acid 7647-01-0 15 0.0775715 152666
KFR-36 Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 60 0.0139438 27442.4
MBC-516 Keane Biocide glutaral 111-30-8 26.7 0.0036114 7107.46
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000718222 1413.51
didecyldimethylammonium chloride 7173-51-5 8 0.00107801 2121.59
KAI-12 Keane Acid Inhibitor ethylbenzene 100-41-4 1 0.00001106 21.768
isoproyl alcohol 67-63-0 5 0.00005530 108.84
Methanol 67-56-1 90 0.000995452 1959.11
Fatty imidazoline 61790-69-0 5 0.00005530 108.84
xylene 1330-20-7 5 0.00005530 108.84
prop-2-yn-1-ol 107-19-7 5 0.00005530 108.84
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005530 108.84
KFR-16FW Keane Friction Reducer ammonium chloride 12125-02-9 1.5 0.000164149 323.057
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000109433 215.371
Water 7732-18-5 60 0.00656598 12922.3
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.00218866 4307.42
oleic acid diethanolamide 93-83-4 1.5 0.000164149 323.057
KSI-22 Keane Scale Inhibitor Methanol 67-56-1 50 0.0111921 22026.8
2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.00223842 4405.36

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 531,367.00 71 0.00 0 0.00 0
2019 SNYDER BROS INC 816,864.00 305 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 2,203.75 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 28.98 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 420.55 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 1,082.56 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 2,266.98 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 848.40 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Synthetic Liner Materials 1.91 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 25,953.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 101.86 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 1,129.00 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Synthetic Liner Materials 2.14 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 18,499.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 4,551.40 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2584990 Primary Facility 2017-04-20 Preoperation Inspection No Violations Noted Site construction had been completed. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2591828 Primary Facility 2017-05-09 Drilling/Alteration No Violations Noted Spudded 4/25/2017. Ran 40' of 30" casing-cemented to surface-covered with steel plate until Rig arrives. Paper work in place and site looks ok.
2608086 Primary Facility 2017-06-26 Drilling/Alteration No Violations Noted Top hole Rig had drilled this well to kick off point-covered the casing/celler with a plate and moved to the next hole. Site looks ok.
2617265 Primary Facility 2017-07-20 Routine/Complete Inspection No Violations Noted Drilling was ongoing for the Nolder 1H at the time of the inspection. Well-site secondary containment located onsite and it appeared to be in sound condition and functioning as intended. Drill cuttings are being collected to be hauled offsite for disposal. All site and access road erosion controls had been installed properly and were functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2624942 Primary Facility 2017-08-07 Drilling/Alteration No Violations Noted Well drilled to kick off point-casing covered with steel plate waiting on finishing rig. All equipment on site looked ok.
2635207 Primary Facility 2017-09-11 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Secondary containment was located onsite. There were no issues observed in relation to the secondary containment. All site and access road controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2661650 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At time of inspection, well 4H drilled, not yet frac'd. 3H, 2H, 1H drilled, not yet frac'd. Rig not on-site. No tanks on-site. Pad containment remains on-site.
2683710 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 4H drilled, not yet frac'd. Wells 1H, 2H, and 3H also drilled, not yet frac'd. No rig on-site.
2705252 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted This well has been drilled and is waiting on frac. The well head casing, cellar, protective grating, containment and piping on site looks ok.
2705258 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted This well has been drilled and is waiting on frac. The well head casing, cellar, protective grating, containment and piping on site looks ok.
2713773 Primary Facility 2018-03-20 Routine/Complete Inspection No Violations Noted At time of inspection, well 4H drilled, not yet frac'd. Wells 1H, 2H, 3H also drilled, not yet frac'd. No rig on-site.
2724818 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 4H drilled, not yet frac'd. Wells 1H, 2H, 3H also drilled, not yet frac'd. No rig on-site.
2746676 Primary Facility 2018-06-28 Routine/Complete Inspection No Violations Noted This 4H well is being zipper fracked along with the other 3 wells on this pad. On this well the frac crew was in the process of performing an injection test on stage six at the time of this inspection. Operator was trying to establish a minimum of 15 BPM flow rate to run the perf guns to perf stage 7. All equipment on site looked ok.
2747690 Primary Facility 2018-07-02 Routine/Complete Inspection No Violations Noted This 4H well is being zipper fracked along with the other 3 wells on this pad. 8 stages out of a planned 56 stage frac had been completed and the crew was perfing stage 9 at the time of this inspection. All equipment on site looked ok.
2748320 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted At time of inspection, frac'g equipment and crew on-site preparing to resume stimulation operations. Keane safety representative Carl on-site.
2760912 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted The frac has been completed on this well and it is awaiting the snubbing unit to drill out the plugs. All equipment on site looks ok.
2798071 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted Flow back operations have been completed on this well and it has the new well head and equipment installed and is awaiting turn on to the new pipeline. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2821146 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]

References