X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31221

Well Details

Well ID: 37-005-31221
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Franklin Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152144
Farm/Lease Name: PAD W09
License Status: Active
Spud Date: 2017-07-01
Permit Date: 2014-12-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.830950
Longitude: -79.672344

For data sources see[1][2][3]

Well History

Date Event
2014-12-11 New Permit Application
2015-12-22 Permit Renewal Application
2017-02-06 Permit Renewal Application
2017-06-14 MOD
2017-07-05 Performed Spud Operation
2017-11-26 Drilling Completion
2018-03-06 Perforation
2018-03-06 Performed Stage 1 of Stimulation
2018-03-06 Performed Stage 2 of Stimulation
2018-03-06 Performed Stage 3 of Stimulation
2018-03-07 Perforation
2018-03-07 Performed Stage 4 of Stimulation
2018-03-07 Performed Stage 5 of Stimulation
2018-03-07 Performed Stage 6 of Stimulation
2018-03-08 Perforation
2018-03-08 Performed Stage 10 of Stimulation
2018-03-08 Performed Stage 7 of Stimulation
2018-03-08 Performed Stage 8 of Stimulation
2018-03-08 Performed Stage 9 of Stimulation
2018-03-09 Perforation
2018-03-09 Performed Stage 10 of Stimulation
2018-03-09 Performed Stage 11 of Stimulation
2018-03-09 Performed Stage 12 of Stimulation
2018-03-09 Performed Stage 13 of Stimulation
2018-03-12 Perforation
2018-03-12 Performed Stage 14 of Stimulation
2018-03-12 Performed Stage 15 of Stimulation
2018-03-12 Performed Stage 16 of Stimulation
2018-03-12 Performed Stage 17 of Stimulation
2018-03-13 Perforation
2018-03-13 Performed Stage 17 of Stimulation
2018-03-13 Performed Stage 18 of Stimulation
2018-03-13 Performed Stage 19 of Stimulation
2018-03-13 Performed Stage 20 of Stimulation
2018-03-13 Performed Stage 21 of Stimulation
2018-03-13 Performed Stage 22 of Stimulation
2018-03-14 Perforation
2018-03-14 Performed Stage 23 of Stimulation
2018-03-14 Performed Stage 24 of Stimulation
2018-03-14 Performed Stage 25 of Stimulation
2018-03-14 Performed Stage 26 of Stimulation
2018-03-14 Performed Stage 27 of Stimulation
2019-06-12 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-06 2018-03-14 6,519 12,888,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TRS 3001 Tight Rock Solutions Scale Control Ethylene Glycol 107-21-1 5 0.000952689 1183.34
Amine Triphosphate Not Assigned 30 0.00571613 7100.05
Sodium Phosphate, Tribasic 7601-54-9 5 0.000952689 1183.34
Other Chemical(s) Listed Above See Trade Name(s) List Thiourea 0000062-56-6 1 0.00000975 12.107
Inorganic Salt Not Assigned 10 0.00682784 8480.91
Water 7732-18-5 92.5 2.01602 2,504,110.0
Alkyl Alcohol Not Assigned 10 0.00682784 8480.91
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000487354 605.346
Sodium Phosphate, Tribasic 7601-54-9 5 0.000952689 1183.34
Formaldehyde 0000050-00-0 1 0.00000975 12.107
Oxyalkylated alcohol Not Assigned 5 0.00341392 4240.45
Methanol 0000067-56-1 5 0.00004874 60.535
Alcohol Alkoxylates Not Assigned 5 0.00285181 3542.26
Ethylene Glycol 107-21-1 5 0.000952689 1183.34
Hydrochloric Acid (7.5%) PVS Acidizing Water 7732-18-5 92.5 2.01602 2,504,110.0
Hydrochloric Acid 7647-01-0 7.5 0.163461 203036
BIOC12031A Nalco Biocide Glutaraldehyde 111-30-8 30 0.00545063 6770.27
Unihib G Geosafe Corrosion Inhibitor Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000487354 605.346
Formaldehyde 0000050-00-0 1 0.00000975 12.107
Butyl digycol 0000112-34-5 75 0.000731031 908.019
Thiourea 0000062-56-6 1 0.00000975 12.107
Methanol 0000067-56-1 5 0.00004874 60.535
TRS 11800 Tight Rock Solutions Friction Reducer Inorganic Salt Not Assigned 10 0.00682784 8480.91
Alkyl Alcohol Not Assigned 10 0.00682784 8480.91
Oxyalkylated alcohol Not Assigned 5 0.00341392 4240.45
Hydrotreated Light Distillate 64742-47-8 30 0.0204835 25442.7
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.5867 107,550,000.0
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Silica Substrate 14808-60-7 100 11.0699 13,750,000.0
AP Breaker Lubrizol Breaker Ammonium persulfate 7727-54-0 100 0.000418643 520
TRS 805X Tight Rock Solutions Friction Reducer Alcohol Alkoxylates Not Assigned 5 0.00285181 3542.26
Aliphatic Hydrocarbon Not Assigned 30 0.0171109 21253.6

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-03-06 1 Sand 6,483,852 8,878 6,376
2018-03-06 2 Sand 6,483,852 8,814 6,751
2018-03-06 3 Sand 6,483,852 9,294 8,122
2018-03-07 4 Sand 6,483,852 8,573 5,603
2018-03-07 5 Sand 6,483,852 8,829 6,545
2018-03-07 6 Sand 6,483,852 8,572 5,878
2018-03-08 7 Sand 6,483,852 9,015 7,574
2018-03-08 8 Sand 6,483,852 8,529 5,897
2018-03-08 9 Sand 6,483,852 8,846 5,792
2018-03-09 10 Sand 6,483,852 9,034 8,026
2018-03-09 11 Sand 6,483,852 7,946 4,969
2018-03-09 12 Sand 6,483,852 9,300 6,008
2018-03-09 13 Sand 6,483,852 8,124 5,246
2018-03-12 14 Sand 6,483,852 7,967 5,855
2018-03-12 15 Sand 6,483,852 7,818 4,783
2018-03-12 16 Sand 6,483,852 8,177 5,696
2018-03-13 17 Sand 6,483,852 8,922 7,619
2018-03-13 18 Sand 6,483,852 8,364 4,798
2018-03-13 19 Sand 6,483,852 8,053 6,796
2018-03-13 20 Sand 6,483,852 7,245 8,508
2018-03-13 21 Sand 6,483,852 7,434 7,944
2018-03-13 22 Sand 6,483,852 7,883 7,149
2018-03-14 23 Sand 6,483,852 7,938 7,094
2018-03-14 24 Sand 6,483,852 7,955 6,051
2018-03-14 25 Sand 6,483,852 8,033 5,986
2018-03-14 26 Sand 6,483,852 8,410 6,714
2018-03-14 27 Sand 6,483,852 8,902 5,545

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 438,873.00 165 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 575,953.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 240.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 665.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 187.15 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 615.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 806.72 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 1,007.65 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 18.33 Bbl INJECTION DISPOSAL WELL 34-155-23795
2018 PENNENERGY RESOURCES LLC Synthetic Liner Materials 4.28 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Filter Socks 0.50 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 6.73 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 5,675.52 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 11.20 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 146.73 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 721.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,246.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 33.21 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 88.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 PENNENERGY RESOURCES LLC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 55.83 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 20.31 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 359.30 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 39.03 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 421.85 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 7,671.82 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 369.27 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 817.04 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 199.82 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 341.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2612501 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted Well sign present-spudded 7/5/2017 with 40' of 16" casing in a 8' round - 8' deep cellar.
2619269 Primary Facility 2017-07-26 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. Well development impoundment construction was in its final stages with final grading and mulching for temporary stabilization being completed. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP.
2630682 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted The Rig was skidding over on to this well pad to commence drilling the top hole at the time of this inspection. Daily drilling info and all equipment looked ok.
2631189 Primary Facility 2017-08-31 Drilling/Alteration No Violations Noted The top hole Rig was just skidding over to this well pad at the time of this inspection. The drilling log book and all equipment on site looked ok.
2637406 Primary Facility 2017-09-15 Routine/Complete Inspection No Violations Noted Drilling was ongoing for 005-31296 at the time of the inspection. Secondary containment, and tertiary containment for number areas on the well pad was implemented as outlined. Well development impoundment construction had been completed and the impoundment was not lined and not in use. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All erosion controls appeared to be maintained and functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2661679 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At time of inspection, 3H actively being drilled. 1H, 2H, 4H, 5H, 6H all spudded, not yet completed.

Operator representatives John Rice and Bobby Harrage on-site.

2662454 Primary Facility 2017-11-20 Drilling/Alteration No Violations Noted The Rig was drilling in the pilot hole at the time of this inspection. The drilling log information and all equipment on site looked ok.
2670288 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted At time of inspection, drilling rig on 2H. 1H, 3H, 4H, 5H, 6H have all been spudded.

Operator representative Bobby Harrage on-site.

2678881 Primary Facility 2017-12-27 Routine/Complete Inspection No Violations Noted At time of inspection, drilling rig on 4H. Wells 1H, 2H, and 3H have been completed. Wells 5H and 6H have been spudded, not yet completed.

Operator representatives Heath Cunningham and Todd White on-site.

2691331 Primary Facility 2018-01-25 Routine/Partial Inspection No Violations Noted At time of inspection, well 3H drilled to total depth. Wells 1H, 2H, 4H, 5H, and 6H also drilled to total depth. These wells have not yet been frac'd.

The rig is in the process of exiting the site. Because of the large volume of vehicle traffic, the Department did not inspect the whole site due to safety concerns.

Operator representative James on-site.

2695909 Primary Facility 2018-02-15 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H drilled to total depth. Wells 1H, 2H, 4H, 5H, and 6H also drilled to total depth. These wells have not yet been frac'd.

No rig on-site during this inspection.

2702141 Primary Facility 2018-03-07 Drilling/Alteration No Violations Noted Operator was fracking stage 5 of the planned 26 stages at the time of this inspection. All paperwork and equipment on site looked ok.
2709356 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H frac'd. Frac'g not yet completed for wells 1H, 2H, 4H, 5H, and 6H. Frac'g operations ongoing for well 4H during this inspection.
2727591 Primary Facility 2018-05-08 Routine/Complete Inspection No Violations Noted At time of inspection, frac'g of wells 1H, 2H, 3H, 4H, 5H, and 6H have been completed. Equipment being removed from site. Operator intends to begin drilling out plugs on Monday 5/14/18.

Operator representative Frank Kocher on-site.

2747766 Primary Facility 2018-07-02 Drilling/Alteration No Violations Noted On this date this well has been drilled, fracked and is awaiting flow back. The operator is moving equipment in to this well pad today to begin flowing back all 6 wells on this pad. The well is shut in, is tagged, the well head casing and all equipment on site looked ok.
2792873 Primary Facility 2018-10-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Small generator on site located on secondary containment. Three brine tanks on site.
2821543 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References