37-005-30774

Well Details

Well ID: 37-005-30774
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Manor Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149232
Farm/Lease Name: RUTH ISEMAN UNIT 5H
License Status:
Spud Date:
Permit Date: 2011-01-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.745881
Longitude: -79.508106

For data sources see[1][2][3]

Well History

Date Event
2011-01-05 New Permit Application
2011-01-09 Performed Spud Operation
2011-02-12 Drilling Completion
2011-03-26 Perforation
2014-04-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-04-13 2011-04-13 6,888 8,527,745

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 3 HCl Acid Calfrac Well Services Perforation Breakdown Hydrochloric acid 7647-01-0 100.00 0.56
DAP-103 Calfrac Well Services Iron Control Citric acid 77-92-9 60.00 0.00200000
DWP-612 Calfrac Well Services Friction Reducer No Hazardous Materials 100.00 0.10
DWP-204 Clay Control Calfrac Well Services pH Adjusting Additive Formic acid 64-18-6 13.00 0.00036000
DWP-901 Calfrac Well Services Oxidizer Breaker Peroxydisulfuric acid, diammonium salt 7727-54-0 100.00 0.00001000
Sand (Proppant) Calfrac Well Services Propping Agent Quartz 14808-60-7 99.90 11.30
DAP-901 Calfrac Well Services Scale Inhibitor Organic phosphonate 30.00 0.00600000
Ammonium chloride 12125-02-9 10.00 0.00200000
Oxyalkylated polyamine 5.00 0.00100000
Methanol 67-56-1 30.00 0.00600000
Amine salt 5.00 0.00100000
Phosphoric acid ammonium salt 5.00 0.00100000
DWP-944 Calfrac Well Services Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Polyethylene glycol 25322-68-3 70.00 0.01
Water Base Fluid Water 100.00 87.96
DWP-111 Calfrac Well Services Viscosity Additive No Hazardous Materials 100.00 0.00185000
DAP-923 Calfrac Well Services Corrosion Inhibitor Fatty acids, tall-oil 61790-12-3 30.00 0.00026000
Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00043000
Propargyl alcohol 107-19-7 10.00 0.00009000
Methanol 67-56-1 60.00 0.00051000
Thiourea polymer 68527-49-1 30.00 0.00026000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00026000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 345,968.00 184 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 607,260.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 400,054.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 313,570.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 291,655.72 365 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 250,605.00 366 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 213,694.00 365 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 187,464.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 167,548.00 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 EXCO RESOURCES PA INC Produced Fluid 2,803.52 Bbl INJECTION DISPOSAL WELL 34-119-27350
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 1,265.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 710.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 EXCO RESOURCES PA INC Drilling Fluid Waste 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 EXCO RESOURCES PA INC Produced Fluid 449.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 350.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 855.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2011 EXCO RESOURCES PA INC Produced Fluid 1,857.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 3,082.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 125.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2011 EXCO RESOURCES PA INC Produced Fluid 582.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 EXCO RESOURCES PA LLC Produced Fluid 1,302.60 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2012 EXCO RESOURCES PA LLC Produced Fluid 207.08 Bbl INJECTION DISPOSAL WELL 34-013-20611
2012 EXCO RESOURCES PA LLC Produced Fluid 111.89 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 862.10 Bbl INJECTION DISPOSAL WELL 34-119-27350
2012 EXCO RESOURCES PA LLC Produced Fluid 1,399.28 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 506.01 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 61.79 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 1,287.57 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2013 EXCO RESOURCES PA LLC Produced Fluid 157.00 Bbl INJECTION DISPOSAL WELL 34-119-27350
2014 EXCO RESOURCES PA LLC Produced Fluid 1,627.13 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 1,880.10 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 1,140.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 313.90 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EXCO RESOURCES PA LLC Produced Fluid 990.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC 611.10 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 207.00 Bbl REUSE (AT WELL PAD)
2017 EXCO RESOURCES PA LLC 207.00 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 205.40 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 EXCO RESOURCES PA LLC Produced Fluid 731.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 722.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1942465 Primary Facility 2011-01-11 Drilling/Alteration No Violations Noted
1943997 Primary Facility 2011-01-19 Routine/Complete Inspection No Violations Noted Drill rig not located onsite during inspection. Operator was in the process of moving the rig onsite. All erosion controls had been installed properly and no issues were observed with the site or access road. Noted that the drill pit located onsite had the required two feet of lined freeboard in the pit. However the liquid contents of the pit appeared to be frozen, and with the temperatures forecasted it would not be feasible to melt the liquid fraction and haul to a treatment facility. Should the operator intend on utilizing the drill pit during the well development of the 5H well the operator should consider alternative methods of containing the drill cuttings.
1946199 Primary Facility 2011-01-11 Drilling/Alteration No Violations Noted
1947310 Primary Facility 2011-02-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. No erosion issues observed in relation to the site or access road. Site had been regraded. The operator should insure that the vegetative cover takes hold and achieves the 70% uniform coverage criteria. In addition the operator should insure the well is properly tagged with the appropriate permit number as soon as possible.
1947312 Primary Facility 2011-02-03 Routine/Complete Inspection No Violations Noted Drilling rig located onsite and drilling was ongoing at the time of the inspection. Observed no erosion & sedimentation issues with either the access road or site. Operator should continue to monitor all erosion controls to insure their continued functionality. Frac pits located onsite appeared to be predominantly frozen and had more than the required two feet of lined freeboard. Drill pit onsite as in use. Drill pit appeared to have a lot of frozen liquid. Rig was depositing cuttings and fluids into the pit. Noted that the pit was approaching the freeboard limit. Spoke with the company man while onsite and confirmed that should it be necessary there is a plan in place to utilize tanks to contain cuttings and fluids until weather permits removal of fluid from the drill pit.
1947943 Primary Facility 2011-02-02 Drilling/Alteration No Violations Noted
1958041 Primary Facility 2011-03-16 Routine/Complete Inspection No Violations Noted Drill rig had just completed moving from the Iseman well pad to the Lenape Heights pad. Observed no accelerated erosion & sedimentation in relation to the site or access road. Specifically there was no evidence of sediment transport off-site during moving the drill rig and ancillary equipment. Drill pit located onsite had more than the required two feet of lined freeboard.
2042781 Primary Facility 2012-02-15 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2129286 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2203330 Primary Facility 2013-09-06 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite, with containment and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2252482 Primary Facility 2014-03-11 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2325801 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well stimulation impoundments were in the process of being emptied and the liner systems removed.
2391374 Primary Facility 2015-07-21 Routine/Complete Inspection No Violations Noted Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2443910 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2496620 Primary Facility 2016-06-20 Routine/Complete Inspection No Violations Noted Well was tagged and in production. Well head casing-production set equipment-tank battery-dike ok.
2559064 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery and dike containment looked ok.
2695081 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted At time of inspection, well 5H drilled and appears equipped for production. Wells 2H, 3H, and 4H also drilled and appear equipped for production.

For data sources see[8]

References