If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30774 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.745881,"lon":-79.508106,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Manor Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 149232 | |
Farm/Lease Name: RUTH ISEMAN UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.745881 | |
Longitude: -79.508106 |
Date | Event |
---|---|
2011-01-05 | New Permit Application |
2011-01-09 | Performed Spud Operation |
2011-02-12 | Drilling Completion |
2011-03-26 | Perforation |
2014-04-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-04-13 | 2011-04-13 | 6,888 | 8,527,745 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 3 HCl Acid | Calfrac Well Services | Perforation Breakdown | Hydrochloric acid | 7647-01-0 | 100.00 | 0.56 | |
DAP-103 | Calfrac Well Services | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00200000 | ||
DWP-612 | Calfrac Well Services | Friction Reducer | No Hazardous Materials | 100.00 | 0.10 | |||
DWP-204 Clay Control | Calfrac Well Services | pH Adjusting Additive | Formic acid | 64-18-6 | 13.00 | 0.00036000 | ||
DWP-901 | Calfrac Well Services | Oxidizer Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00001000 | ||
Sand (Proppant) | Calfrac Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 11.30 | ||
DAP-901 | Calfrac Well Services | Scale Inhibitor | Organic phosphonate | 30.00 | 0.00600000 | |||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00200000 | |||||
Oxyalkylated polyamine | 5.00 | 0.00100000 | ||||||
Methanol | 67-56-1 | 30.00 | 0.00600000 | |||||
Amine salt | 5.00 | 0.00100000 | ||||||
Phosphoric acid ammonium salt | 5.00 | 0.00100000 | ||||||
DWP-944 | Calfrac Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | ||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
Water | Base Fluid | Water | 100.00 | 87.96 | ||||
DWP-111 | Calfrac Well Services | Viscosity Additive | No Hazardous Materials | 100.00 | 0.00185000 | |||
DAP-923 | Calfrac Well Services | Corrosion Inhibitor | Fatty acids, tall-oil | 61790-12-3 | 30.00 | 0.00026000 | ||
Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00043000 | |||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00009000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00051000 | |||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00026000 | |||||
Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00026000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 345,968.00 | 184 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 607,260.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 400,054.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 313,570.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 291,655.72 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 250,605.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 213,694.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 187,464.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 167,548.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA INC | Produced Fluid | 2,803.52 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 1,265.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 710.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 449.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 350.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 855.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 1,857.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 3,082.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 125.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 582.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,302.60 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 207.08 Bbl | INJECTION DISPOSAL WELL | 34-013-20611 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 111.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 862.10 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,399.28 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 506.01 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 61.79 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,287.57 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 157.00 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 1,627.13 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 1,880.10 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 1,140.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 313.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 990.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | 611.10 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE | |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 207.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EXCO RESOURCES PA LLC | 207.00 Bbl | REUSE (AT WELL PAD) | ||
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 205.40 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 731.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 722.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1942465 | Primary Facility | 2011-01-11 | Drilling/Alteration | No Violations Noted | |
1943997 | Primary Facility | 2011-01-19 | Routine/Complete Inspection | No Violations Noted | Drill rig not located onsite during inspection. Operator was in the process of moving the rig onsite. All erosion controls had been installed properly and no issues were observed with the site or access road. Noted that the drill pit located onsite had the required two feet of lined freeboard in the pit. However the liquid contents of the pit appeared to be frozen, and with the temperatures forecasted it would not be feasible to melt the liquid fraction and haul to a treatment facility. Should the operator intend on utilizing the drill pit during the well development of the 5H well the operator should consider alternative methods of containing the drill cuttings. |
1946199 | Primary Facility | 2011-01-11 | Drilling/Alteration | No Violations Noted | |
1947310 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. No erosion issues observed in relation to the site or access road. Site had been regraded. The operator should insure that the vegetative cover takes hold and achieves the 70% uniform coverage criteria. In addition the operator should insure the well is properly tagged with the appropriate permit number as soon as possible. |
1947312 | Primary Facility | 2011-02-03 | Routine/Complete Inspection | No Violations Noted | Drilling rig located onsite and drilling was ongoing at the time of the inspection. Observed no erosion & sedimentation issues with either the access road or site. Operator should continue to monitor all erosion controls to insure their continued functionality. Frac pits located onsite appeared to be predominantly frozen and had more than the required two feet of lined freeboard. Drill pit onsite as in use. Drill pit appeared to have a lot of frozen liquid. Rig was depositing cuttings and fluids into the pit. Noted that the pit was approaching the freeboard limit. Spoke with the company man while onsite and confirmed that should it be necessary there is a plan in place to utilize tanks to contain cuttings and fluids until weather permits removal of fluid from the drill pit. |
1947943 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | |
1958041 | Primary Facility | 2011-03-16 | Routine/Complete Inspection | No Violations Noted | Drill rig had just completed moving from the Iseman well pad to the Lenape Heights pad. Observed no accelerated erosion & sedimentation in relation to the site or access road. Specifically there was no evidence of sediment transport off-site during moving the drill rig and ancillary equipment. Drill pit located onsite had more than the required two feet of lined freeboard. |
2042781 | Primary Facility | 2012-02-15 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard. |
2129286 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard. |
2203330 | Primary Facility | 2013-09-06 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite, with containment and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard. |
2252482 | Primary Facility | 2014-03-11 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard. |
2325801 | Primary Facility | 2014-12-03 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well stimulation impoundments were in the process of being emptied and the liner systems removed. |
2391374 | Primary Facility | 2015-07-21 | Routine/Complete Inspection | No Violations Noted | Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road. |
2443910 | Primary Facility | 2016-01-27 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road. |
2496620 | Primary Facility | 2016-06-20 | Routine/Complete Inspection | No Violations Noted | Well was tagged and in production. Well head casing-production set equipment-tank battery-dike ok. |
2559064 | Primary Facility | 2017-02-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery and dike containment looked ok. |
2695081 | Primary Facility | 2018-02-01 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 5H drilled and appears equipped for production. Wells 2H, 3H, and 4H also drilled and appear equipped for production. |
For data sources see[8]