37-005-30708

Well Details

Well ID: 37-005-30708
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Mahoning Township
Operator Name: HIGHPOINTE OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: BATES 5
License Status:
Spud Date:
Permit Date: 2010-09-09
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.965058
Longitude: -79.322806

For data sources see[1][2][3]

Well History

Date Event
2010-09-09 New Permit Application
2011-03-31 Performed Spud Operation
2011-04-13 Drilling Completion
2012-03-27 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 HIGHPOINTE OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 HIGHPOINTE OIL & GAS LLC 2,315.00 90 0.00 0 0.00 0
2012 HIGHPOINTE OIL & GAS LLC 8,572.00 365 0.00 0 0.00 0
2013 HIGHPOINTE OIL & GAS LLC 7,413.00 365 0.00 0 0.00 0
2014 HIGHPOINTE OIL & GAS LLC 5,129.00 365 0.00 0 0.00 0
2015 HIGHPOINTE OIL & GAS LLC 4,413.00 365 0.00 0 0.00 0
2016 HIGHPOINTE OIL & GAS LLC 2,224.00 366 0.00 0 0.00 0
2017 HIGHPOINTE OIL & GAS LLC 3,692.00 365 0.00 0 0.00 0
2018 HIGHPOINTE OIL & GAS LLC 3,666.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 HIGHPOINTE OIL & GAS LLC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2012 HIGHPOINTE OIL & GAS LLC Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2013 HIGHPOINTE OIL & GAS LLC Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2014 HIGHPOINTE OIL & GAS LLC Produced Fluid 40.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 HIGHPOINTE OIL & GAS LLC Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1961866 Primary Facility 2011-03-30 Routine/Complete Inspection No Violations Noted Drilling had not commenced at the time of the inspection. Site and access road construction was in its final stages. E&S controls as implemented should minimize accelerated erosion & sedimentation provided they are maintained as necessary.
1965018 Primary Facility 2011-04-12 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Drill pit had more than the required two feet of lined freeboard. Access road and site erosion controls appeared to be functioning properly. Operator should continue to maintain all E&S controls until well development activities are completed.
1965022 Primary Facility 2011-04-12 Routine/Complete Inspection No Violations Noted Drilling had been completed. Well was not equipped for production. The majority of the site had been regraded & mulched, however the topsoil pile was left upslope of the well indicating that final site regrading was as of yet unfinished. Operator should maintain all erosion control BMP's until well development activities are completed.
1966862 Primary Facility 2011-04-05 Drilling/Alteration No Violations Noted @ 700'
1978309 Primary Facility 2011-06-02 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed at the time of the inspection. Drill pit had drill fluids removed and the pit was re-lined and contained what appeared to be frac flowback fluid. The pit had more than the required two feet of lined freeboard. Observed accelerated erosion or sedimentation in relation to the access road or well-site. All erosion controls functioned properly. The operator should endeavor to complete well development and site restoration activities as soon as possible.
2046094 Primary Facility 2012-02-28 Site Restoration No Violations Noted Drilling was completed on 04/13/11. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been properly regraded and the vegetative cover met the 70% uniform covera criteria. There was no observed accelerated erosion or sedimentation observed in relation to the access road or well-site.
2110317 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Vegetative cover met the 70% uniform cover criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.

For data sources see[7]