Well Details

Well ID: 37-005-30487
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Manor Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149232
Farm/Lease Name: RUTH ISEMAN UNIT 2H
License Status:
Spud Date:
Permit Date: 2009-10-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.7460
Longitude: -79.508111

For data sources see[1][2][3]

Well History

Date Event
2009-10-27 New Permit Application
2010-08-31 Permit Renewal Application
2010-09-07 Performed Spud Operation
2011-01-10 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-03-30 2011-03-30 6,891 5,664,048

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Calfrac Well Services Propping Agent Quartz 14808-60-7 99.90 12.25
DWP-111 Calfrac Well Services Viscosity Additive No Hazardous Materials 100.00 0.00168000
DAP-923 Calfrac Well Services Corrosion Inhibitor Propargyl alcohol 107-19-7 10.00 0.00011000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00034000
Thiourea polymer 68527-49-1 30.00 0.00034000
Fatty acids, tall-oil 61790-12-3 30.00 0.00034000
Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00006000
Methanol 67-56-1 60.00 0.00069000
DWP-612 Calfrac Well Services Friction Reducer No Hazardous Materials 100.00 0.09
DWP-901 Calfrac Well Services Oxidizer Breaker Peroxydisulfuric acid, diammonium salt 7727-54-0 100.00 0.00004000
3 HCl Acid Calfrac Well Services Perforation Breakdown Hydrochloric acid 7647-01-0 100.00 0.65
DWP-204 Clay Control Calfrac Well Services pH Adjusting Additive Formic acid 64-18-6 13.00 0.00004000
DAP-103 Calfrac Well Services Iron Control Citric acid 77-92-9 60.00 0.00288000
DWP-944 Calfrac Well Services Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Polyethylene glycol 25322-68-3 70.00 0.01
DAP-901 Calfrac Well Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00200000
Phosphoric acid ammonium salt 5.00 0.00100000
Amine salt 5.00 0.00100000
Organic phosphonate 30.00 0.00601000
Oxyalkylated polyamine 5.00 0.00100000
Methanol 67-56-1 30.00 0.00601000
Water Base Fluid Water 100.00 86.93

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2010 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 191,764.00 184 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 534,147.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 319,509.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 236,389.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 223,039.33 360 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 209,073.00 366 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 184,516.00 365 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 161,683.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 142,991.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 EXCO RESOURCES PA INC Drilling Fluid Waste 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 160.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 EXCO RESOURCES PA INC Drilling Fluid Waste 125.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 129.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 1,811.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2011 EXCO RESOURCES PA INC Produced Fluid 177.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011 EXCO RESOURCES PA INC Drilling Fluid Waste 90.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 3,143.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Produced Fluid 1,796.08 Bbl INJECTION DISPOSAL WELL 34-119-27350
2011 EXCO RESOURCES PA INC Produced Fluid 401.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 EXCO RESOURCES PA LLC Produced Fluid 965.26 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2012 EXCO RESOURCES PA LLC Produced Fluid 204.02 Bbl INJECTION DISPOSAL WELL 34-013-20611
2012 EXCO RESOURCES PA LLC Produced Fluid 115.23 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 810.79 Bbl INJECTION DISPOSAL WELL 34-119-27350
2012 EXCO RESOURCES PA LLC Produced Fluid 103.54 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 EXCO RESOURCES PA LLC Produced Fluid 1,353.12 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 224.09 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 38.41 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 1,319.36 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2013 EXCO RESOURCES PA LLC Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-119-27350
2014 EXCO RESOURCES PA LLC Produced Fluid 1,369.71 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 80.00 Bbl STORAGE PENDING DISPOSAL OR REUSE 2014-07
2015 EXCO RESOURCES PA LLC Produced Fluid 1,764.70 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 910.60 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 308.90 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EXCO RESOURCES PA LLC Produced Fluid 920.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC 618.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 101.90 Bbl REUSE (AT WELL PAD)
2017 EXCO RESOURCES PA LLC 101.90 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 693.20 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 626.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1914196 Primary Facility 2010-09-17 Drilling/Alteration No Violations Noted
1914566 Primary Facility 2010-09-22 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. All erosion controls that had been implemented previously during site construction for the Ruth Iseman 3H (005-30493) had been maintained properly and were functioning to minimize accelerated erosion & sedimentation. Specifically the seeding and mulching of affected areas had significantly reduced the amount of disturbed area which could generate sediment. Access road had been heavily rocked for stabilization and no accelerated erosion or sedimentation was observed in relation to the access road. No erosion problems are anticipated during well development, which will require the site to remain open through the winter months, due to the erosion controls undertaken. Noted that the pipeline associated with the site had vegetation beginning to take hold on the reclaimed pipeline right of way.
1919385 Primary Facility 2010-10-13 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Above grade frac impoundments located onsite and it had more than two feet of lined freeboard. Observed no accelerated erosion and sedimentation in association with the access road or well-site.
1919958 Primary Facility 2010-09-08 Drilling/Alteration No Violations Noted drilling @ 350ft/E&S ok/ID&pit ok
1944002 Primary Facility 2011-01-19 Routine/Complete Inspection No Violations Noted Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion and sedimentation in association with the access road or well-site.
1947315 Primary Facility 2011-02-03 Routine/Complete Inspection No Violations Noted Drilling rig located onsite and drilling was ongoing at the time of the inspection. Observed no erosion & sedimentation issues with either the access road or site. Operator should continue to monitor all erosion controls to insure their continued functionality. Frac pits located onsite appeared to be predominantly frozen and had more than the required two feet of lined freeboard. Drill pit onsite as in use. Drill pit appeared to have a lot of frozen liquid. Rig was depositing cuttings and fluids into the pit. Noted that the pit was approaching the freeboard limit. Spoke with the company man while onsite and confirmed that should it be necessary there is a plan in place to utilize tanks to contain cuttings and fluids until weather permits removal of fluid from the drill pit.
1956066 Primary Facility 2011-02-17 Drilling/Alteration No Violations Noted
1958034 Primary Facility 2011-03-16 Routine/Complete Inspection No Violations Noted Drill rig had just completed moving from the Iseman well pad to the Lenape Heights pad. Observed no accelerated erosion & sedimentation in relation to the site or access road. Specifically there was no evidence of sediment transport off-site during moving the drill rig and ancillary equipment. Drill pit located onsite had more than the required two feet of lined freeboard.
2042766 Primary Facility 2012-02-15 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2129270 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2203323 Primary Facility 2013-09-06 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite, with containment and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2252478 Primary Facility 2014-03-11 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2325803 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well stimulation impoundments were in the process of being emptied and the liner systems removed.
2391370 Primary Facility 2015-07-21 Routine/Complete Inspection No Violations Noted Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2443906 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2496622 Primary Facility 2016-06-20 Routine/Complete Inspection No Violations Noted Well was tagged and in production. Well head casing-production set equipment-tank battery-dike ok.
2559072 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2695085 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted At time of inspection, well 2H drilled and appears equipped for production. Wells 3H, 4H, and 5H also drilled and appear equipped for production.

For data sources see[8]