If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30476 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.850298,"lon":-79.2469,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Wayne Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: PAULENE C BRICE 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-29 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.850298 | |
Longitude: -79.2469 |
Date | Event |
---|---|
2009-09-29 | New Permit Application |
2010-03-30 | Performed Spud Operation |
2010-04-05 | Drilling Completion |
2010-04-12 | Perforation |
2010-07-19 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 5,050.00 | 246 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 10,147.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 11,913.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 10,844.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 10,432.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 6,950.97 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 4,646.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 4,045.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 5,221.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 7,494.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Produced Fluid | 25.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 25 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2016 | XTO ENERGY INC | Produced Fluid | 54 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2016 | XTO ENERGY INC | Produced Fluid | 54.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1828502 | Primary Facility | 2009-09-11 | Routine/Complete Inspection | No Violations Noted | Site not constructed at the timem of the inspection. Due to the length of the access road, and the stream crossing which will require a Gp-5 and GP-7, the Department recommends that the operator rock the entire access road with a clean durable rock so as to minimize the amount of sediment generated by the traffic associated with well and well-site development. E&S controls for the permitted stream crossing should isolate the stream from the distured areas for well-site development. As per phone conversation with Tom Baun, the E&S plan drawing will be revised to show that the filter fence will be backed with haybales due to the proximity of the disturbed area to to the UNT of Spruce Run, and the drop off of elevation from the toe of the fill to the eastern stream bank. |
1874518 | Primary Facility | 2010-04-02 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pits located onsite and both of them had more than the required two feet of lined freeboard. Stream crossing had been implemented properly and no accelerated erosion & sedimentation was observed in relation to the access road. Noted that at the far back corner of the well-site the silt fence had been compromised, however no off-site transport of sediment had ocurred as of the time of the inspection. |
2616238 | Primary Facility | 2017-07-18 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted the well was located amidst a cultivated soybean field. |
For data sources see[7]