X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30405

Well Details

Well ID: 37-005-30405
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Wayne Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: DAVID C BRICE 3
License Status:
Spud Date:
Permit Date: 2009-07-08
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.843162
Longitude: -79.254203

For data sources see[1][2][3]

Well History

Date Event
2009-07-08 New Permit Application
2010-04-08 Performed Spud Operation
2010-04-13 Drilling Completion
2010-04-20 Perforation
2010-07-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 4,178.00 242 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 8,338.00 345 0.00 0 0.00 0
2012 XTO ENERGY INC 10,258.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 6,393.00 359 0.00 0 0.00 0
2014 XTO ENERGY INC 5,409.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 4,343.47 365 0.00 0 0.00 0
2016 XTO ENERGY INC 3,520.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 2,990.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 3,776.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 5.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 41.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 6.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 6.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2013 XTO ENERGY INC Produced Fluid 47.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2016 XTO ENERGY INC Produced Fluid 54 Bbl CENT WASTE TRT FAC NPDES PA0095273
2016 XTO ENERGY INC Produced Fluid 54.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1877346 Primary Facility 2010-04-14 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed at the time of the inspection. Below grade pits located onsite and both had more than the required two feet of freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. Noted that the silt fencing had been installed across an existing swale at the bottom of the disturbed area for the well pad construction. Installed in the manner the silt fencing will not function properly. A collection ditch stabilized with rock or erosion control matting with a small sediment trap at the outlet would have been a more effective erosion control BMP.

For data sources see[7]

References