If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.730516,"lon":-79.357354,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Plumcreek Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: HELVETIA COAL MINING COMPANY 13 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-10-09 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.730516 | |
Longitude: -79.357354 |
Date | Event |
---|---|
2008-10-09 | New Permit Application |
2009-03-23 | Performed Spud Operation |
2009-03-26 | Drilling Completion |
2009-04-06 | Perforation |
2009-09-10 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 3064.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 6,086.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 10,548.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 12,635.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 9,215.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 8,459.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 7,173.57 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 5,533.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 3,424.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 5,189.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 3,892.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Produced Fluid | 47.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1735772 | Primary Facility | 2008-09-04 | Routine/Complete Inspection | No Violations Noted | Well staked, site not constructed. E&S plan drawing revised to show BMP's at culvert outlets and filter fence backed with hay bales. E&S plan should minimize accelerated E&S if plan is impemented & maintained properly. |
1820754 | Primary Facility | 2009-08-14 | Routine/Complete Inspection | No Violations Noted | Drilling was completed, well appeared to be equipped for & in production at the time of the inspection. Brine tank located onsite and appeared to be sound condition. Spoke via phone with operator representative Dan Rice regarding a diversion ditch located above the site. The ditch required further stabilizion to function properly carrying runoff and minimizing acelerated erosion & sedimentation. Mr. Rice stated that the first of the week beginning with 08/17/09 he will have erosion control matting placed with seed and mulch to stabilize the ditch and monitor the site to insure that the erosion control measures are functioning properly. |
1821492 | Primary Facility | 2009-08-19 | Routine/Complete Inspection | No Violations Noted | The issue with the diversion ditch observed during the 08/14/09 had been addressed and corrected by the operator. Erosion control matting had been placed and the areas devoid of vegetation had been seeded & mulched. In addition hay bales had been implemented on the downhill slope of the ditch and at the bottom of the fill slope for the original well-site as a temporary BMP until the vegetation began to grow and take hold. The operator should continue to monitor the site to insure that the additional erosion controls function properly, and the vegetation begins to grow. |
2252830 | Primary Facility | 2014-03-12 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
2527509 | Primary Facility | 2016-10-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus was shut. Well head casing-equipment-grounded 100 bbl plastic tank looked ok. |
For data sources see[7]