If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-005-29604 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.972734,"lon":-79.62424,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Armstrong | |
| Municipality: Bradys Bend Township | |
| Operator Name: DANNIC ENERGY CORP | |
| Well Pad ID: | |
| Farm/Lease Name: DEWEY 5 | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2008-03-31 | |
| Well Type: GAS | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 40.972734 | |
| Longitude: -79.624240 |
| Date | Event |
|---|---|
| 2008-03-31 | New Permit Application |
| 2008-06-20 | Performed Spud Operation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2008 | DANNIC ENERGY CORP | 2,552.64 | 184 | 0.00 | 0 | 0.00 | 0 |
| 2009 | DANNIC ENERGY CORP | 2,593.82 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2010 | DANNIC ENERGY CORP | 1,189.84 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2011 | DANNIC ENERGY CORP | 551.5 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2012 | DANNIC ENERGY CORP | 690.36 | 305 | 0.00 | 0 | 0.00 | 0 |
| 2013 | DANNIC ENERGY CORP | 430.75 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2014 | DANNIC ENERGY CORP | 324.00 | 304 | 0.00 | 0 | 0.00 | 0 |
| 2015 | DANNIC ENERGY CORP | 386.21 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | DANNIC ENERGY CORP | 530.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2017 | DANNIC ENERGY CORP | 226.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2018 | DANNIC ENERGY CORP | 402.14 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2019 | DANNIC ENERGY CORP | 231.08 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2009 | DANNIC ENERGY CORP | Produced Fluid | 236.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
| 2009 | DANNIC ENERGY CORP | Produced Fluid | 33.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
| 2010 | DANNIC ENERGY CORP | Produced Fluid | 186.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
| 2011 | DANNIC ENERGY CORP | Produced Fluid | 7.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1887953 | Primary Facility | 2010-05-18 | Routine/Complete Inspection | No Violations Noted | equipped/E&S - advice/tank&tag ok |
For data sources see[7]