X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-27264

Well Details

Well ID: 37-005-27264
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Redbank Township
Operator Name: JR RESOURCES LP
Well Pad ID:
Farm/Lease Name: STEFFY/BARRETT UNIT 2
License Status:
Spud Date:
Permit Date: 2003-07-03
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.961361
Longitude: -79.227469

For data sources see[1][2][3]

Well History

Date Event
2003-07-03 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1332294 Primary Facility 2004-04-27 Routine/Complete Inspection Violation(s) Noted Spud called in for 7-16-04. Well never drilled. Site not reclaimed yet. ES violations
1349202 Primary Facility 2004-06-30 Compliance Evaluation Violation(s) & Outstanding Violations staked - not drilled/E&S inadeq - site&road/E&S Plan inadeq.
1351664 Primary Facility 2004-07-12 Compliance Evaluation Outstanding Violations - Viols Req'd onsite meeting with operator - E&S concerns discussed

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1332294 393646 04/27/2004 2004-04-27 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1349202 401338 06/30/2004 2004-06-30 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1349202 401339 06/30/2004 2004-06-30 102.4INADPLN - E&S Plan not adequate Administrative
1351664 402570 07/12/2004 2004-07-12 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1351664 402571 07/12/2004 2004-07-12 102.4INADPLN - E&S Plan not adequate Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
393646 142329 NOV - Notice of Violation Comply/Closed 2004-09-21
393646 187009 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-02 2005-03-02 $2,200.00 $2,200.00
401338 146906 NOV - Notice of Violation Comply/Closed 2004-09-21
401338 187009 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-02 2005-03-02 $2,200.00 $2,200.00
401339 146906 NOV - Notice of Violation Comply/Closed 2004-09-21
401339 187009 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-02 2005-03-02 $2,200.00 $2,200.00
402570 187009 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-02 2005-03-02 $2,200.00 $2,200.00
402571 187009 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-02 2005-03-02 $2,200.00 $2,200.00

For data sources see[5]

References