X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-00729

Well Details

Well ID: 37-005-00729
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Kittanning Township
Operator Name: EQT PROD CO
Well Pad ID:
Farm/Lease Name: I SCHAFFER
License Status: Plugged and Abandoned
Spud Date: 1949-03-26
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.752707
Longitude: -79.423992

For data sources see[1][2][3]

Well History

Date Event
1949-06-24 Drilling Completion
1960-01-01 Old Well
2018-05-22 Begin Plugging
2018-06-11 Finished Plugging
2019-07-16 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 APOLLO GAS CO 4,042.00 367 0.00 0 0.00 0
1987 APOLLO GAS CO 4,395.00 351 0.00 0 0.00 0
1988 APOLLO GAS CO 4,573.00 366 0.00 0 0.00 0
1989 APOLLO GAS CO 2,865.00 361 0.00 0 0.00 0
1991 APOLLO GAS CO 3491.00 364 0.00 0 0.00 0
1997 CARNEGIE PROD CO 1079 365 0.00 0 0.00 0
1998 CARNEGIE PROD CO 1080 365 0.00 0 0.00 0
1999 CARNEGIE PROD CO 1371 365 0.00 0 0.00 0
2000 EQUITRANS INC 458 365 0.00 0 0.00 0
2001 EQUITABLE PROD EASTERN STATES EXPLORATION INC 75 365 0.00 0 0.00 0
2003 EQT PROD CO 0.00 0 0.00 0 0.00 0
2004 EQT PROD CO 36 62 0.00 0 0.00 0
2005 EQT PROD CO 88 93 0 93 0.00 0
2006 EQT PROD CO 41.00 123 0.00 0 0.00 0
2007 EQT PROD CO 65.00 303 0.00 0 0.00 0
2008 EQT PROD CO 46.00 365 0.00 0 0.00 0
2009 EQT PROD CO 261.00 245 0.00 0 0.00 0
2010 EQT PROD CO 212.00 334 0.00 0 0.00 0
2011 EQT PROD CO 33.00 275 0.00 0 0.00 0
2012 EQT PROD CO 0.00 0 0.00 0 0.00 0
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2018 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2735197 Primary Facility 2018-05-30 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of this inspection, the plugging rig has set up on this well and determined a TD of 3421'. This depth will be an acceptable attainable TD. The crew was waiting on the wireline truck to arrive. All equipment on site looked ok.
2736824 Primary Facility 2018-06-04 Plugging(Includes Plugged/Mined Through) No Violations Noted The Rig was just getting ready to run pipe in the hole, run gel in and attempt to circulate down some more at the time of this inspection. All equipment on site looked ok.
2738287 Primary Facility 2018-06-06 Plugging(Includes Plugged/Mined Through) No Violations Noted The Rig set the bridge plug at 3000', free pointed tubing at 2708', pulled 87 joints of tubing, ran back in to check TD and the well had caved in up to 1035'. Ran in 33 joints of tubing and started washing down and made 6' in 4 hours. Pulled tubing, put on bit and drilled from 1040' to 1600' using gel. Circulated the hole and set 700' plug of cement from 1600' to 900'. Waiting on wireline to bond log the 5' from 890' to surface at the time of this inspection. All equipment on site looked ok.
2739661 Primary Facility 2018-06-11 Plugging(Includes Plugged/Mined Through) No Violations Noted The Rig set the bridge plug at 3000', free pointed tubing at 2708', pulled 87 joints of tubing, ran back in to check TD and the well had caved in up to 1035'. Ran in 33 joints of tubing and started washing down and made 6' in 4 hours. Pulled tubing, put on bit and drilled from 1040' to 1600' using gel. Circulated the hole and set 700' plug of cement from 1600' to 900'.

Bond log showed pipe free at 300' perfed 10 shots every 100' from 800' to 400'. Pumped 81 sks cement from 900' to 300'. Top of cement was 390'. Shot 5" off at at 296', pulled all 15 joints of 5" and shut down until today. On this date ran tubing to 384' and pumped 107 sks of cement so far and was in the process of adding more cement to get to surface at the time of this inspection. All equipment on site looked ok.

For data sources see[6]

References