37-005-00591

Well Details

Well ID: 37-005-00591
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Wayne Township
Operator Name: EQT PROD CO
Well Pad ID:
Farm/Lease Name: G HOUSER
License Status: Plugged and Abandoned
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.915906
Longitude: -79.326944

For data sources see[1][2][3]

Well History

Date Event
1905-05-15 Drilling Completion
1986-01-01 Old Well
2019-01-14 Begin Plugging
2019-02-13 Finished Plugging
2019-08-09 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 APOLLO GAS CO 2,289.00 279 0.00 0 0.00 0
1987 APOLLO GAS CO 1,313.00 251 0.00 0 0.00 0
1988 APOLLO GAS CO 1,720.00 369 0.00 0 0.00 0
1989 APOLLO GAS CO 1,843.00 354 0.00 0 0.00 0
1991 APOLLO GAS CO 2975.00 364 0.00 0 0.00 0
1997 CARNEGIE PROD CO 2082 365 0.00 0 0.00 0
1998 CARNEGIE PROD CO 2449 365 0.00 0 0.00 0
1999 CARNEGIE PROD CO 3527 365 0.00 0 0.00 0
2000 EQUITRANS INC 1539 365 0.00 0 0.00 0
2001 EQUITABLE PROD EASTERN STATES EXPLORATION INC 806 365 0.00 0 0.00 0
2003 EQT PROD CO 57 365 0.00 0 0.00 0
2004 EQT PROD CO 7 31 0.00 0 0.00 0
2005 EQT PROD CO 0.00 0 0.00 0 0.00 0
2006 EQT PROD CO 0.00 0 0.00 0 0.00 0
2007 EQT PROD CO 0.00 0 0.00 0 0.00 0
2008 EQT PROD CO 0.00 0 0.00 0 0.00 0
2009 EQT PROD CO 0.00 0 0.00 0 0.00 0
2010 EQT PROD CO 0.00 0 0.00 0 0.00 0
2011 EQT PROD CO 0.00 0 0.00 0 0.00 0
2012 EQT PROD CO 0.00 0 0.00 0 0.00 0
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2018 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
214594 Primary Facility 1992-05-29 Routine/Complete Inspection No Violations Noted E&S OK; NO TANK
2828607 Primary Facility 2019-01-16 Routine/Partial Inspection No Violations Noted At the time of inspection, Penn Mechanical was onsite. The well was tagged at 1197', where they hit something very hard. They beat on it for 2 hours and made no footage. Plugging operator said it was acting like cement. There are no post drilling records on the well. There had been 50 psi on the well, which was loaded with water to kill it. Plans are to use a chisel tomorrow to try and break through the bridge.
2831991 Primary Facility 2019-01-24 Routine/Partial Inspection No Violations Noted At the time of inspection, Penn Mechanical was onsite preparing to run 2" into the hole and run a power swivel. Due to inclement weather, not much activity has occurred during the past week. No progress had been made getting deeper into the well.
2834059 Primary Facility 2019-01-29 Routine/Partial Inspection No Violations Noted At the time of inspection, Penn Mechanical was stuck in the well after a cave in occurred over top of the bit. The have been working the pipe free. They were at a depth of 2358'. No gas has been encountered since they killed the well on day 1. It was agreed that once they get free, they would tag bottom to see where they are. That will be attainable bottom. I was texted by co. man and they had only pulled 70' of pipe out. They were shutting down until Monday due to the cold temperatures coming.
2836778 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted At the time of inspection, attainable bottom was granted at 2290' due to caving. HB Cementing Services came onsite to plug the bottom portion of the well. This was done in 2 stages, 350' each. This should have cement set to just below where the 4" is set. In preparation for cement, well was washed bottoms up.
2838118 Primary Facility 2019-02-07 Routine/Partial Inspection No Violations Noted At the time of inspection, cementers were onsite again. Cement from 2/5 was tagged at 1420'. 4 1/2" was cut at 1109', but attempt to pull failed. Came up hole and cut at 1000', 893', and 810' with a collar buster. Pulled casing up 20' and decided to cement stub left in well. Cement was set to just below 910'. They will tag tomorrow.
2841372 Primary Facility 2019-02-15 Routine/Partial Inspection No Violations Noted At the time of inspection, rig has moved off location and only some reclaiming equipment remains. After tagging cement from previous job, top was at 1160' ( should have been 910'). More cement was set from 1160' to 810' last Friday. There is now cement at surface. The marker was set as an above ground pipe that has a steel plate affixed to it with the Operator name, API number, and date plugged welded on to it.

For data sources see[6]

References