X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22341

Well Details

Well ID: 37-003-22341
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Fawn Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 152531
Farm/Lease Name: BELLO CHARLES 11612
License Status:
Spud Date:
Permit Date: 2015-06-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.654414
Longitude: -79.7751

For data sources see[1][2][3]

Well History

Date Event
2015-06-29 New Permit Application
2015-08-25 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-25 2016-04-02 6,773 5,462,970

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Range Resources Base/Carrier Fluid Water 7732-18-5 100 89.3965 46,421,900.0
HAI-OS ACID INHIBITOR, 100 MESH,
30/50 ,MX-5-3886, MX-588-2,
MX-8-2544, FDP-S1232-16, HYDROCHLORIC ACID
Halliburton, Multi-Chem Corrosion Inhibitor, Proppant, Biocide, Scale Inhibitor, Friction Reducer, Base Fluid Water 7732-18-5 100 0.924914 480290
Amide Proprietary 5 0.00238022 1236
Sodium acetate CP anhydrous 127-09-3 0.5 0.00005007 26
Fatty acids, tall oil Confidential 30 0.000215683 112
Ammonium chloride 12125-02-9 5 0.00238022 1236
Non-hazardous solvent package Proprietary 50 0.00385341 2001
Monopotassium phosphate 7778-77-0 0.1 0.00001155 6
Yeast extract 8013-01-2 0.5 0.00005007 26
Crystalline silica, quartz 14808-60-7 100 9.44193 4,903,010.0
Propargyl alcohol 107-19-7 10 0.00007318 38
Olefins Confidential 5 0.00008858 46
Hydrotreated light petroleum distillate 64742-47-8 30 0.0142736 7412
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.000215683 112
Hydrochloric acid 7647-01-0 7.5 0.0623728 32389
Neutralized Polycarboxylic Acid Proprietary 10 0.000772222 401
Reaction product of acetophenone,
formaldehyde, thiourea
and oleic acid in dimethyl formamide
68527-49-1 30 0.000215683 112
Methanol 67-56-1 60 0.00042944 223
Sodium chloride 7647-14-5 30 0.0152442 7916
Hydroquinine monomethyl ether 150-76-5 1 0.000477584 248
Sodium nitrate 7631-99-4 0.5 0.00005007 26
Calcium nitrate.4H2O 13477-34-4 100 0.133535 69342
Sodium lactate syrup 60% sodium salt 72-17-3 0.1 0.00001155 6

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 752,660.17 173 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 782,073.33 365 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 560,201.32 358 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 421,430.40 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 854.76 Bbl REUSE OTHER THAN ROAD SPREADING
2015 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 44.97 Tons LANDFILL 100585
2015 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 357.99 Tons LANDFILL 100620
2015 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 337.49 Tons LANDFILL 100172
2016 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 102.85 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RANGE RESOURCES APPALACHIA LLC Synthetic Liner Materials 2.38 Tons LANDFILL 100172
2016 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 53.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 3,405.96 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 380.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 51.59 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 481.23 Bbl CENT WASTE TRT FAC NPDES PA0254185
2016 RANGE RESOURCES APPALACHIA LLC Synthetic Liner Materials 1.48 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 137.02 Bbl CENT WASTE TRT FAC NPDES PA0254185
2016 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil 48.79 Tons LANDFILL 06-08438
2016 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 38.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 53.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 1,096.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 137.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 48.79 Tons LANDFILL 06-08438
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 2,106.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 3,366.19 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 60.57 Tons LANDFILL 100620
2016 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 194.44 Tons LANDFILL 100172
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 361.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC 267.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 930.66 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 10.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 6.43 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 173.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC 10.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RANGE RESOURCES APPALACHIA LLC 97.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 51.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC 481.19 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 471.56 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 21.87 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 104.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW030
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 10.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 4.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 205.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 1.29 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2018 RANGE RESOURCES APPALACHIA LLC Synthetic Liner Materials 0.77 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 282.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 7.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 226.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW015
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 0.07 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 149.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 36.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 55.02 Bbl REUSE (AT WELL PAD)
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 718.21 Bbl REUSE (AT WELL PAD)
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 6.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW015

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2394854 Primary Facility 2015-07-28 Routine/Complete Inspection No Violations Noted On 7/28/15, I inspected the Charles Bello site as a routine inspection and made the following observations:
2400539 Primary Facility 2015-08-04 Routine/Complete Inspection No Violations Noted On 8/4/15, I inspected the Charles Bello site as a follow up to a previous inspection and made the following observations:
2400563 Primary Facility 2015-08-15 Preoperation Inspection No Violations Noted On 8/18/15, I inspected the Charles Bello site with Range Resources representative Erica Taylor in response to a preoperational inspection request and made the following observations:
2402778 Primary Facility 2015-08-25 Drilling/Alteration No Violations Noted RANSOM DRILLING HAS TWO AUGER RIGS SETTING 40' OF 26" CONDUCTOR.
2414423 Primary Facility 2015-10-02 Routine/Complete Inspection No Violations Noted On 10/2/15, I inspected the Charles Bello site with Range Resources representative Erica Taylor in response to a request for redline modifications and made the following observations:
2419434 Primary Facility 2015-10-20 Drilling/Alteration No Violations Noted FALCON 24 HAS COMPLETED TOP HOLE AND HAS LEFT THE SITE. THE WELL IS COVERED WITH A STEEL PLATE.
2419481 Primary Facility 2015-10-14 Drilling/Alteration No Violations Noted FALCON 24 IS DRILLING AT 4,400'.
2419486 Primary Facility 2015-10-08 Drilling/Alteration No Violations Noted FALCON 24 IS OVER THE WELL AND READY TO BEGIN DRILLING.
2434260 Primary Facility 2015-12-02 Drilling/Alteration No Violations Noted TOP HOLE IS COMPLETE. PATTERSON 315 WILL DRILL THE BOTTOM SECTION OF THIS WELL.
2442822 Primary Facility 2016-01-11 Drilling/Alteration No Violations Noted PATTERSON 315 DRILLED THIS WELL TO 12,120', AND SET THE PRODUCTION CASING AT 12,088'.

THE RIG HAS MOVED FROM THE WELL.

2449910 Primary Facility 2016-02-01 Drilling/Alteration No Violations Noted THIS WELL HAS BEEN DRILLED BUT NOT FRACED. THE RIG IS MOVING.

THE PAD IS BEIING CLEANED.

2451419 Primary Facility 2016-02-18 Drilling/Alteration No Violations Noted THIS WELL IS DRILLED BUT NOT FRACED.

ADVANCED OIL FIELD SERVICES HAS STARTED WORK ON THE PRODUCTION EQUIPTMENT.

2463848 Primary Facility 2016-03-11 Drilling/Alteration No Violations Noted THIS IS ONE OF SIX WELLS ON THIS PAD BEING CLEANED OUT AND PRESSURE TESTED.

THE SITE IS IN GOOD CONDITION.

2468860 Primary Facility 2016-03-22 Drilling/Alteration No Violations Noted CASING HAS BEEN TESTED. CREWS WILL BEGIN SETTING FRAC EQUIPTMENT LATER TODAY.

THE PAD IS OK.

2477550 Primary Facility 2016-04-05 Drilling/Alteration No Violations Noted THIS WELL IS ONE OF THREE THAT ARE FRACED. THE FRAC EQUIPTMENT HAS BEEN MOVED TO THE LAST THREE.

THE SITE IS IN GOOD CONDITION.

2477617 Primary Facility 2016-04-20 Drilling/Alteration No Violations Noted THIS WELL HAS BEEN FRACED AND IS SHUT IN. FLOWBACK WILL BEGIN NEXT MONTH.

THE SITE IS IN GOOD CONDITION.

2481718 Primary Facility 2016-01-07 Complaint Inspection No Violations Noted On 1/7/16, I performed a complaint inspection pertaining to the C. Bello site in response to a landowner complaint and made the following observations:

•Samples were taken for SAC 946 and bacterial analysis. •Water had no odor or discoloration.

2482085 Primary Facility 2016-02-17 Administrative/File Review No Violations Noted On 5/9/16, I performed an administrative review of sample results and site observation for a complaint related to the Charles Bello site and made the following observations:

•Water samples were found to have no elevated chemical parameters; coliform and e. coli bacteria presence were found indicating surface water influence. •Based on distance to nearest wells (~2600 feet away) as well as the above test results no oil & gas activity impact is indicated.

2482780 Primary Facility 2015-12-15 Follow-up Inspection No Violations Noted On 12/15/15, I performed a follow up inspection of the Charles Bello site concerning redline modifications requested in early October as well as standing erosion issues and made the following observations:


2483937 Primary Facility 2016-05-05 Drilling/Alteration No Violations Noted THIS WELL HAS BEEN FRACED. A COIL TUBING RIG IS ON THE PAD TO DRILL OUT THE PLUGS.

THE SITE IS IN GOOD CONDITION.

2490649 Primary Facility 2016-04-19 Incident- Response to Accident or Event No Violations Noted On 4/19/16, I performed an incident inspection at the Charles Bello site in response to an operator reported spill (CTS# 319113) that occurred on 4/18/16 and made the following observations:

•Per the operator’s initial report roughly 10bbl of reuse water was released to the pad surface, the spill was confined to the pad, and did not impact surface waters.

    -The loss of 10bbl of reuse water to the pad surface does constitute a violation of 58 Pa. C.S. § 3217(a) for Failure to control and dispose of brines produced from the drilling, alteration or operation of a well consistent with the Clean Streams Law and 25 Pa. Code § 78.54 for failure to control brine in a manner that prevents pollution of the waters of the Commonwealth.

•The initial report indicates that the spill was caused by overfilling a tank which caused material to be sprayed beyond the secondary containment. Weavertown Environmental Group was reported to have begun remediation on 4/18/16. •At the time of inspection initial material removal ha

2491494 Primary Facility 2016-06-06 Compliance Evaluation No Violations Noted On 6/6/16, I performed a compliance evaluation inspection for the Charles Bello site in response to a spill that occurred on 4/18/16 and made the following observations:

•At the time of inspection a large shallow pit partially filled with water was observed in the location of the spill. Water in this excavated area was found to have similar conductivity to standing water elsewhere on the pad not believed to be affected by the spill (between 675-700¿¿s). Living tadpoles were observed in the standing water throughout the site. •No construction or drilling activities were ongoing at the time of inspection. •Stabilizing vegetation immediately adjacent to the first half of the site access road was very sparse in many areas. No violation, remediation recommended. •An area of disturbed ground crossed the site’s access road and led to the pad near the production units. Contact with an operator representative indicated that the disturbance was attributed to a pipeline owned by Superior having been constructed. T

2494906 Primary Facility 2016-03-04 Routine/Partial Inspection No Violations Noted On 3/4/16, I performed a routine partial inspection at the C. Bello site in response to an operator request for consultation on redline changes at the site and an adjacent water line.
2657308 Primary Facility 2017-11-06 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
2733531 Primary Facility 2018-05-23 Routine/Complete Inspection No Violations Noted At time of inspection, all six wells on the pad are drilled and appear equipped for production.
2762496 Primary Facility 2018-08-09 Routine/Complete Inspection No Violations Noted At time of inspection, all six wells on the pad are drilled and appear equipped for production.

Operator representative Denny Furmanek present during inspection.

2781332 Primary Facility 2018-09-26 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. No E&S issues.

For data sources see[8]

References