X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22290

Well Details

Well ID: 37-003-22290
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Findlay Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 150979
Farm/Lease Name: ACAA 2E
License Status:
Spud Date:
Permit Date: 2014-05-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.461986
Longitude: -80.256758

For data sources see[1][2][3]

Well History

Date Event
2014-05-15 New Permit Application
2014-07-17 Performed Spud Operation
2014-08-15 New Permit Application
2015-01-07 Drilling Completion
2015-03-19 Perforation
2015-10-22 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-21 2015-06-18 6,074 13,635,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 87.4345 113,583,000.0
MC MX 588-2, MC MX 8-2544 MultiChem Biocide, Scale Inhibitor NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients Acrylamide acrylate polymer Confidential 30 0.0213523 27738
Acetic acid 64-19-7 60 0.00310379 4033
Fatty acids, tall oil Confidential 30 0.00042781 556
Acetic anhydride 108-24-7 100 0.00517298 6720
Sodium persulfate 7775-27-1 100 0.00002463 33
Crystalline silica, quartz 14808-60-7 100 11.3906 14,797,100.0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0213523 27738
Fatty alcohol polyglycol ether surfactant 9043-30-5 1 0.00002511 33
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.00042781 556
Olefins Confidential 5 0.000171124 224
Propargyl alcohol 107-19-7 10 0.000142603 186
Sodium sulfate 7757-82-6 0.1 0.00000002 1
Sodium chloride 7647-14-5 30 0.0213523 27738
Naphtha, hydrotreated heavy 64742-48-9 60 0.00150687 1958
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)
dimethyl,salts with bentonite
68953-58-2 5 0.000125573 164
Reaction product of acetophenone,
formaldehyde, thiourea
and oleic acid in dimethyl formamide
68527-49-1 30 0.00042781 556
Guar gum 9000-30-0 60 0.00150687 1958
Methanol 67-56-1 60 0.00085562 1112
Hydrochloric acid 7647-01-0 5 0.0504595 65550
Calcium nitrate 10124-37-5 60 0.0512361 66559
Water 7732-18-5 100 1.10313 1,433,030.0
HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0
FE-1A ACIDIZING COMPOSITION, FR-76,
HAI-OS ACID INHIBITOR,
LGC-36 UC, MC MX 437-5,
SAND-COMMON WHITE-100 MESH,
SSA-2, BULK (100003676), SAND-PREMIUM WHITE-30/50, BULK, SP BREAKER
Halliburton Additive, Breaker, Corrosion Inhibitor, Friction Reducer, Liquid Gel Concentrate, Proppant NA NA 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2016 CNX GAS CO LLC 890,707.45 185 0.00 0 5,077.44 185
2017 CNX GAS CO LLC 1,568,427.72 307 0.00 0 6,113.16 292
2018 CNX GAS CO LLC 1,395,686.42 334 0.00 0 1,822.34 338
2019 CNX GAS CO LLC 1,081,054.69 358 0.00 0 990.09 238

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CNX GAS CO LLC Drill Cuttings 427.73 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 29.47 Bbl LANDFILL 06-08438
2014 CNX GAS CO LLC Drill Cuttings 1,000.00 Tons LANDFILL 100620
2014 CNX GAS CO LLC Drill Cuttings 110.19 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Drill Cuttings 398.93 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Drilling Fluid Waste 252.69 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2015 CNX GAS CO LLC Drill Cuttings 342.84 Tons LANDFILL PAD059087072
2015 CNX GAS CO LLC Produced Fluid 21.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Drill Cuttings 15.90 Tons LANDFILL 100620
2015 CNX GAS CO LLC Drilling Fluid Waste 233.86 Bbl LANDFILL 06-08438
2016 CNX GAS CO LLC 9,725.32 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 12,014.79 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC 495.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC 33,382.46 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017 CNX GAS CO LLC 61.83 Bbl INJECTION DISPOSAL WELL 34-119-28780
2017 CNX GAS CO LLC Produced Fluid 11.67 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 CNX GAS CO LLC Produced Fluid 987.66 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC 3,955.40 Bbl SURFACE IMPOUNDMENT 1068441
2017 CNX GAS CO LLC Produced Fluid 237.73 Bbl INJECTION DISPOSAL WELL 34-119-28780
2017 CNX GAS CO LLC Produced Fluid 79.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC 1,241.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 3,955.40 Bbl SURFACE IMPOUNDMENT 1068441
2017 CNX GAS CO LLC Produced Fluid 1,202.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 1,494.05 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC 1,206.84 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC 2,362.33 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CNX GAS CO LLC 311.66 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 1,241.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC 11.67 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 CNX GAS CO LLC Produced Fluid 1,468.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 3,203.33 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CNX GAS CO LLC Produced Fluid 35,661.13 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017 CNX GAS CO LLC 22.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2018 CNX GAS CO LLC Produced Fluid 112.72 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Produced Fluid 1,764.03 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 27,023.91 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 856.33 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 CNX GAS CO LLC Produced Fluid 1,509.66 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 1.67 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Produced Fluid 391.58 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 178.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Produced Fluid 3,291.51 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 89.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Other Oil & Gas Wastes 74.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 11,637.53 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 258.22 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Produced Fluid 2,080.83 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Other Oil & Gas Wastes 95.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 2,612.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 1,549.16 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Produced Fluid 13.89 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 CNX GAS CO LLC Produced Fluid 8.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2019 CNX GAS CO LLC Produced Fluid 1,035.40 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 148.43 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 609.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 14.16 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 402.83 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2271225 Primary Facility 2014-05-13 Routine/Partial Inspection No Violations Noted This well has not yet been drilled. The preoperational inspection for this well was conducted concurrently with inspection of site 778780, ACAA Well Pad 2. Perimeter E&S controls were implemented according to plan. E&S issues are addressed in inspection report for the site (EFACTS inspection record# 2271193.)
2287570 Primary Facility 2014-07-17 Drilling/Alteration No Violations Noted A RIG IS ON THE PAD TO INSTALL THE CELLAR AND CONDUCTOR.
2289879 Primary Facility 2014-07-23 Drilling/Alteration No Violations Noted THE CONDUCTOR AND CELLAR ARE IN.
2296884 Primary Facility 2014-08-07 Drilling/Alteration No Violations Noted THE SITE IS BEING PREPARED FOR THE RIG. THE CONDUCTOR IS IN. A PROTECTIVE COVER HAS BEEN PUT DOWN ON THE PAD.
2308254 Primary Facility 2014-09-24 Routine/Complete Inspection No Violations Noted This inspection was conducted in the presence of operator's representative. Tophole rig was on site during inspection. Site ID sign should be updated to include all permitted wells. Vegetation at access road entrance and in several other areas was very sparse. E&S controls were installed according to plan and appeared adequate to prevent soil run-off outside limits of disturbance. Department recommends operator consider an alternative seed mix to gain sufficient vegetative cover if vegetation does not take root.
2313607 Primary Facility 2014-10-07 Drilling/Alteration No Violations Noted HAD 247 FINISHED DRILLING TOP HOLE AT 5,490'. THE RIG HAS MOVED.
2340734 Primary Facility 2015-01-07 Drilling/Alteration No Violations Noted patterson 278 reached td @ 17,543'. patterson is slowly pulling drill rods working through several tight spots.
2340737 Primary Facility 2015-01-14 Drilling/Alteration No Violations Noted TD AT 17,543'. THE PRODUCTION CASING IS CEMENTED. THE RIG HAS MOVED.
2366172 Primary Facility 2015-04-30 Routine/Complete Inspection No Violations Noted
2372417 Primary Facility 2015-05-19 Drilling/Alteration No Violations Noted THIS WELL IS HOOKED UP AND BEING FRACED.
2377063 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted
2380517 Primary Facility 2015-06-17 Drilling/Alteration No Violations Noted THIS WELL IS BEING FRACED. THE D, AND F WELLS ARE ALSO BEING FRACED. THE CONTRACTOR IS GOING BACK AND FORTH BETWEEN STAGES. THERE ARE NINE STAGES LEFT TO FRAC.
2390957 Primary Facility 2015-07-09 Drilling/Alteration No Violations Noted THE WELL IS FRACED. AFTER PLUGS ARE DRILLED OUT TUBING WILL BE RUN.
2396557 Primary Facility 2015-07-30 Drilling/Alteration No Violations Noted FRAC PLUGS ARE DRILLED OUT AND TUBING HAS BEEN PUT IN.
2434791 Primary Facility 2015-12-21 Routine/Complete Inspection No Violations Noted
2463406 Primary Facility 2016-02-29 Routine/Complete Inspection No Violations Noted THIS WELL IS DRILLED, FRACED, AND HOOKED UP FOR PRODUCTION. THE SITE IS IN GOOD CONDITION.
2512470 Primary Facility 2016-08-17 Routine/Complete Inspection No Violations Noted THIS WELL IS HOOKED UP AND PRODUCING.

THE SITE IS IN GOOD CONDITION.

2542654 Primary Facility 2016-11-15 Routine/Complete Inspection No Violations Noted
2560876 Primary Facility 2017-02-13 Routine/Complete Inspection No Violations Noted On 2/13/2017, WQS Brian MacQuarrie onsite at unconventional well site. Six wells in production onsite. Well tag and fire extinguisher station installed at each well head. Four 400 bbl production tanks installed within stainless steel containment structure. Erosion and Sedimentation Best Management Practices installed and maintained. Vegetation emerging in previously disturbed areas. No apparent E/S issues.
2650264 Primary Facility 2017-10-20 Routine/Complete Inspection No Violations Noted On 10/20/2017, WQS Brian MacQuarrie onsite. Del Rick Construction crew onsite in the process of restoring site. Well pad consists of six producing wells, properly tagged, and four 400 bbl production tanks installed within secondary steel containment structure.
2672754 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Four brine tanks located onsite within containment. Both the tanks and secondary containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2758775 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, brine tank and GPU appear to be operational. Well tag present. No observation of accelerated erosion or sedimentation related to well site or access road.
2853962 Primary Facility 2019-03-05 Routine/Partial Inspection No Violations Noted At the time of this inspection, well 2E is drilled and appears equipped for production. Wells 2A, 2B, 2C, 2D, and 2F also drilled and appear equipped for production.

For data sources see[8]

References