X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22282

Well Details

Well ID: 37-003-22282
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Findlay Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 151012
Farm/Lease Name: ACAA 1D
License Status:
Spud Date:
Permit Date: 2014-04-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.472872
Longitude: -80.254803

For data sources see[1][2][3]

Well History

Date Event
2014-04-16 New Permit Application
2014-09-16 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-14 2016-12-23 6,064 6,420,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unihib G UWS Acid inhibitor Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000137327 89.25
Butyl diglycol 112-34-5 75 0.000205991 133.875
Formaldehyde 50-00-0 1 0.00000275 1.785
Methanol 67-56-1 5 0.00001373 8.925
Thiourea 62-56-6 1 0.00000275 1.785
Other Chemical(s) Listed Above See Trade Name(s) List Ethanol 64-17-5 0.3 0.00002910 18.915
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000137327 89.25
Formaldehyde 50-00-0 1 0.00000275 1.785
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.000481821 313.138
Water 7732-18-5 83 0.00805226 5233.2
Ammonium acetate 631-61-8 13 0.00678564 4410.02
DETA phosphonate 15827-60-8 5 0.000481821 313.138
Quarternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 2.5 0.000242538 157.627
Alcohols, ethoxylated 68439-50-9 5 0.00260986 1696.16
Thiourea 62-56-6 1 0.00000275 1.785
Methanol 67-56-1 5 0.00001373 8.925
Alcohols, ethoxylated 68002-97-1 5 0.00260986 1696.16
Alcohols, ethoxylated 68551-12-2 5 0.00260986 1696.16
Aqucar 714 UWS Biocide Water 7732-18-5 83 0.00805226 5233.2
Ethanol 64-17-5 0.3 0.00002910 18.915
Quarternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 2.5 0.000242538 157.627
Glutaraldehyde 111-30-8 14 0.00135821 882.709
Scale Inhibitor E UWS Scale Inhibitor Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00192728 1252.55
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.000481821 313.138
DETA phosphonate 15827-60-8 5 0.000481821 313.138
Unislick ST50 UWS Friction reducer Ammonium acetate 631-61-8 13 0.00678564 4410.02
Alcohols, ethoxylated 68551-12-2 5 0.00260986 1696.16
Alcohols, ethoxylated 68002-97-1 5 0.00260986 1696.16
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0156592 10177
Alcohols, ethoxylated 68439-50-9 5 0.00260986 1696.16
HCL Acid (7.5%) UWS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0629518 40912.7
Sand UWS Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 16.6346 10,810,900.0
Water Consol Carrier/Base Fluid Water 7732-18-5 100 82.4376 53,576,600.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2016 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2017 CNX GAS CO LLC 1,112,134.69 269 0.00 0 4,112.85 268
2018 CNX GAS CO LLC 764,985.92 337 0.00 0 495.87 336
2019 CNX GAS CO LLC 559,074.46 360 0.00 0 207.16 211

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CNX GAS CO LLC Drill Cuttings 207.44 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 572.49 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drilling Fluid Waste 1,022.38 Bbl LANDFILL 06-08438
2014 CNX GAS CO LLC Drill Cuttings 750.00 Tons LANDFILL 100620
2014 CNX GAS CO LLC Drill Cuttings 325.97 Tons LANDFILL 06-08438
2014 CNX GAS CO LLC Drilling Fluid Waste 582.64 Bbl LANDFILL PAD059087072
2015 CNX GAS CO LLC Drilling Fluid Waste 133.50 Bbl LANDFILL PAD059087072
2015 CNX GAS CO LLC Drill Cuttings 50.88 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Drilling Fluid Waste 826.97 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2015 CNX GAS CO LLC Drill Cuttings 197.14 Tons LANDFILL PAD059087072
2015 CNX GAS CO LLC Produced Fluid 21.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 107.75 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC 24,413.38 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017 CNX GAS CO LLC Drill Cuttings 37.03 Tons LANDFILL 06-3857
2017 CNX GAS CO LLC 512.51 Bbl LANDFILL CID: 29084
2017 CNX GAS CO LLC Other Oil & Gas Wastes 8.41 Tons LANDFILL CID: 29084
2017 CNX GAS CO LLC Drill Cuttings 1.05 Tons LANDFILL CID: 29084
2017 CNX GAS CO LLC Produced Fluid 797.42 Bbl LANDFILL 76-00-08
2017 CNX GAS CO LLC Other Oil & Gas Wastes 55.29 Tons LANDFILL 76-00-08
2017 CNX GAS CO LLC Drill Cuttings 3.02 Tons LANDFILL 76-00-08
2017 CNX GAS CO LLC 818.49 Bbl LANDFILL 76-00-08
2017 CNX GAS CO LLC 37.03 Tons LANDFILL 06-3857
2017 CNX GAS CO LLC Produced Fluid 24,413.38 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017 CNX GAS CO LLC Produced Fluid 506.08 Bbl LANDFILL CID: 29084
2018 CNX GAS CO LLC Produced Fluid 58.95 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Produced Fluid 4,899.76 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 48,501.80 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 781.88 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 CNX GAS CO LLC Produced Fluid 1,258.01 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 214.48 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 2.90 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Produced Fluid 390.10 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Produced Fluid 6,721.98 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 25,909.45 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 5,088.42 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 10.63 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2019 CNX GAS CO LLC Produced Fluid 6,298.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 122.63 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2019 CNX GAS CO LLC Produced Fluid 3,715.14 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 206.25 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 2,510.51 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 471.63 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 38.50 Bbl INJECTION DISPOSAL WELL 34-119-28780
2019 CNX GAS CO LLC Produced Fluid 1,278.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 704.11 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Produced Fluid 1.25 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 646.88 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2303196 Primary Facility 2014-08-19 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58, Ch 32 § 3258 a. 1.
2307445 Primary Facility 2014-09-17 Drilling/Alteration No Violations Noted THE CELLAR IS IN. 80' OF CONDUCTOR IS BEING RUN BY BUTCH'S DRILLING.
2313586 Primary Facility 2014-10-07 Drilling/Alteration No Violations Noted KEANE 2144 ADVANCED PILOT HOLE TO 6,275'. TD WILL BE 6,330'.
2316127 Primary Facility 2014-10-22 Drilling/Alteration No Violations Noted KEANE 2144 DRILLED A 8 3/4" HOLE TO 6300'. HALIBURTON SET CEMENT PLUGS BACK TO THE KOP.
2362759 Primary Facility 2015-03-18 Drilling/Alteration No Violations Noted Patterson Rig 278 spud on 3/7/15; Drilled to 10230TD; Set 5 1/2' @ 10207'; cemented casing; plug down 3/13/15;
2366151 Primary Facility 2015-04-30 Routine/Complete Inspection No Violations Noted
2377043 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted
2390955 Primary Facility 2015-07-09 Drilling/Alteration No Violations Noted THE WELL IS DRILLED BUT NOT FRACED. THE COVER IS ON THE PAD. THE SITE IS CLEAN.
2396562 Primary Facility 2015-07-30 Drilling/Alteration No Violations Noted THIS WELL IS DRILLED BUT NOT FRACED. THERE IS NO ACTIVITY ON THE PAD.
2463360 Primary Facility 2016-02-29 Drilling/Alteration No Violations Noted THIS WELL WAS DRILLED BUT NOT FRACED.

THE PAD IS FENCED AND IN GOOD CONDITION.

2464912 Primary Facility 2016-03-03 Routine/Complete Inspection No Violations Noted
2488203 Primary Facility 2016-05-20 Drilling/Alteration No Violations Noted THIS WELL IS DRILLED BUT NOT FRACED. THE WELL IS COVERED.

THE SITE IS IN GOOD CONDITION.

2496974 Primary Facility 2016-06-20 Routine/Complete Inspection Pending This well was submitted for inactive status. At that time the well had 1,615 psi between the 5.5" and 95/8" casings. they noted that this was probably left from the 5.5" cement job. I asked for the well to be blown down and shut back in to be sure. The well was bled and after 24 hrs the well held 200 psi. The well was shut in again over the weekend resulting in 550 psi. The 95/8" casing is set at 2,217', and the EST TOC for the 5.5" production casing is 1,670'. It appears the 5.5" cement job may have been comprimised. Violations are pending.
2496975 Primary Facility 2016-06-09 Drilling/Alteration No Violations Noted A PLASTIC TANK IS NEAR THE WELL TO CATCH ANY FLUID AS THE WELL IS BLOWN DOWN.

THERE IS NO ACTIVITY ON THE PAD.

2512461 Primary Facility 2016-08-12 Drilling/Alteration No Violations Noted THE WELL IS COVERED WITH A STEEL PLATE.

THE SITE IS IN GOOD CONDITION.

2542611 Primary Facility 2016-11-15 Routine/Complete Inspection No Violations Noted
2555616 Primary Facility 2017-01-26 Routine/Complete Inspection No Violations Noted On 1/26/2016 WQS Brian MacQuarrie met onsite at unconventional well pad with Spencer Johnson and Jason Harding of CNX for site inspection. Currently stimulation activities are being conducted at Eight wells on the pad. Temporary tanks are setup on well pad within secondary containment. Production equipment setup onsite. Above ground temporary storage tank setup on tank pad adjacent to well pad. Site stabilized in previously disturbed areas.
2650268 Primary Facility 2017-10-20 Routine/Complete Inspection No Violations Noted On 10/20/2017, WQS Brian MacQuarrie onsite. Operator well tenders onsite. Eight wells in production. Wells tagged. Erosion and Sedimentation Best Management Practices maintained. Vegetative growth established in previously disturbed areas. Embankment along tank pad needs to be seeded and mulched.
2675612 Primary Facility 2017-12-28 Routine/Complete Inspection No Violations Noted The site had been constructed in accordance with the E&S plan contained within the ESCGP. All site and access road erosion controls had been installed and maintained properly. Cut and fill slopes had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Four brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. While WQS Higgins was onsite a tanker truck removed fluids from the production tanks without incident.
2758569 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, brine tank and GPU appear to be operational. Well tag present. No observation of accelerated erosion or sedimentation related to well site or access road.

For data sources see[8]

References