If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22226 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.483867,"lon":-79.726083,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: GOSPEL CHURCH UNIT 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-06-13 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.483867 | |
Longitude: -79.726083 |
Date | Event |
---|---|
2012-06-13 | New Permit Application |
2012-08-06 | Performed Spud Operation |
2012-09-28 | Drilling Completion |
2013-04-02 | Perforation |
2013-05-29 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 8,542.00 | 214 | 22803.60 | 214 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 15,021.00 | 365 | 11465.82 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 10,443.10 | 365 | 1989.35 | 304 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 9,864.40 | 366 | 1060.36 | 184 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 8,477.00 | 365 | 1,422.16 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 9,917.75 | 365 | 1,249.50 | 246 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 8,131.99 | 365 | 1,117.34 | 214 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | Produced Fluid | 230.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Drilling Fluid Waste | 401.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Drilling Fluid Waste | 2,263.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2013 | PENNECO OIL CO INC | Drilling Fluid Waste | 721.43 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 1,982.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Drilling Fluid Waste | 721.43 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Fracing Fluid Waste | 740.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2013 | PENNECO OIL CO INC | Drilling Fluid Waste | 613 Bbl | CENT WASTE TRT FAC NPDES | PA0091472 |
2013 | PENNECO OIL CO INC | Fracing Fluid Waste | 740 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 1,982.00 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Drilling Fluid Waste | 613.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0091472 |
2014 | PENNECO OIL CO INC | Fracing Fluid Waste | 500.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Fracing Fluid Waste | 500 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 807 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 807.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2019 | PENNECO OIL CO INC | Produced Fluid | 290.67 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3177 |
2019 | PENNECO OIL CO INC | Produced Fluid | 160.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2074406 | Primary Facility | 2012-05-21 | Routine/Complete Inspection | No Violations Noted | John Ley, Water Quality Specialist, SWRO was on site with Mr. Richard Kunkle Engineering Coordinator for Penneco to inspect the site for an OG57 waiver. The site was heavily covered with brush. The well head stake was located and it was where the plan called out. Abbers Creek was located and the area near the #10 well site was dry at the time of the inspection. |
2082248 | Primary Facility | 2012-07-11 | Routine/Complete Inspection | No Violations Noted | John Ley WQS, SWRO was on site to conduct a routine inspection of the above site. Drilling had not yet started. Pad construction was in process. The access road was in good condition. Site ID was posted and the well permit was on site. |
2085932 | Primary Facility | 2012-07-17 | Drilling/Alteration | No Violations Noted | CONTRACTOR IS MOVING DIRT TO BUILD THIS PAD. |
2085950 | Primary Facility | 2012-07-11 | Drilling/Alteration | No Violations Noted | THE SITE IS UNDER CONSTRUCTION. ACCESS IS GOOD. |
2093382 | Primary Facility | 2012-08-08 | Drilling/Alteration | No Violations Noted | WHIPSTOCK IS DRILLING AT 112'. 26" CONDUCTOR IS CEMENTED IN PLACE. |
2093422 | Primary Facility | 2012-08-02 | Drilling/Alteration | No Violations Noted | THE SITE IS BUILT AND E&S CONTROLS ARE IN PLACE. |
2095861 | Primary Facility | 2012-08-15 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLED TO 1500'. LES WILSON WILL FINISH. SITE IS OK. |
2096572 | Primary Facility | 2012-08-22 | Drilling/Alteration | No Violations Noted | TOP HOLE RIG IS GONE. A VENT HAS BEEN INSTALLED. THE SITE IS IN GOOD CONDITION. |
2098801 | Primary Facility | 2012-09-10 | Routine/Complete Inspection | No Violations Noted | John Ley and Sam Steingrabe, WQS, SWRO an were on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them. No accelerated erosion or sedimentation issues were observed on site. |
2099816 | Primary Facility | 2012-09-10 | Drilling/Alteration | No Violations Noted | LES WILSON 25 SETTING UP TO RESUME DRILLING AT 1500'. SITE IN GOOD SHAPE. |
2102879 | Primary Facility | 2012-09-18 | Drilling/Alteration | No Violations Noted | WILSON RIG BUILDING CURVE FOR THE HORIZONTAL LEG OF THIS OIL WELL. |
2102891 | Primary Facility | 2012-09-12 | Drilling/Alteration | No Violations Noted | WILSON RIG DRILLING BOTTOM HOLE. |
2106811 | Primary Facility | 2012-10-01 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. RIG DOWN AND MOVING OUT. |
2106813 | Primary Facility | 2012-10-09 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. WELL NOT FRACED. |
2121257 | Primary Facility | 2012-12-03 | Drilling/Alteration | No Violations Noted | BAKER TOOL FISHING FOR 4.5" CASING. CASING UNSCREWED WHEN THE BOP WAS REMOVED. |
2124790 | Primary Facility | 2012-12-10 | Drilling/Alteration | No Violations Noted | WORKING TO GET SEPERATED 4.5" CASING BACK TOGETHER. SITE IS IN GOOD SHAPE. |
2128210 | Primary Facility | 2013-01-02 | Drilling/Alteration | No Violations Noted | CONTRACTOR HAS NOT BEEN ABLE TO HOOK UP SEPERATED CASING. A BIGGER RIG WILL TRY TO MILL CASING TO A BETTER SECTION OF PIPE. |
2131231 | Primary Facility | 2013-01-14 | Drilling/Alteration | No Violations Noted | SERVICE RIG IS GONE. NO ACTIVITY TODAY. BIGGER RIG WILL MILL SEPERATED CASING. |
2132847 | Primary Facility | 2013-01-22 | Routine/Complete Inspection | No Violations Noted | John Ley, WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, PPC plan, and well permit were on site. The site was gated for security. BMP's installed were functioning according to the E&S plan. No accelerated erosion or sedimentation issues were observed on site or on the access road. |
2143046 | Primary Facility | 2013-02-04 | Drilling/Alteration | No Violations Noted | WELL IS NOT COMPLETED. ALARGER RIG WILL REPAIR DAMAGED CASING. SITE IS GOOD. |
2146618 | Primary Facility | 2013-03-05 | Drilling/Alteration | No Violations Noted | CONTRACTOR WORKING TO REPAIR SEPERATED 4.5" CASING. |
2151179 | Primary Facility | 2013-03-20 | Drilling/Alteration | No Violations Noted | THIS WELL IS NOW INTACT. WELL IS NOT FRACED. PIT LEVEL IS OK. |
2151180 | Primary Facility | 2013-03-26 | Drilling/Alteration | No Violations Noted | SERVICE RIG IS SET UP. WELL IS BEING PREPARED FOR FRACING. |
2156441 | Primary Facility | 2013-04-08 | Drilling/Alteration | No Violations Noted | WELL IS FRACED AND THE TUBING IS IN. A SERVICE RIG IS MOVING OUT. THE SITE IS OK. |
2165005 | Primary Facility | 2013-04-29 | Drilling/Alteration | No Violations Noted | TUBING AND RODS ARE IN. JACK IS NOT ASSEMBLED. THE PIT IS DRAINED. THE SITE IS OK. |
2169266 | Primary Facility | 2013-05-16 | Drilling/Alteration | No Violations Noted | HORIZONTAL PRODUCING OIL AND GAS WELL. THE JACK IS OPERATING. TRACK HOE BUILDING A DIKE AROUND THE STORAGE TANKS. |
2251866 | Primary Facility | 2014-02-04 | Routine/Complete Inspection | No Violations Noted | JACK IS OPERATING. TANKS ARE DIKED. SITE IS OK. |
2391294 | Primary Facility | 2015-07-01 | Routine/Complete Inspection | No Violations Noted | THIS IS A SHALLOW OIL AND GAS WELL. THE JACK AND PRODUCTION EQUIPTMENT ARE WELL MAINTAINED. |
2463824 | Primary Facility | 2016-03-02 | Routine/Complete Inspection | No Violations Noted | THIS IS A SHALLOW HORIZONTAL OIL AND GAS WELL. THE JACK IS OPERATING.
THE SITE IS IN GOOD CONDITION. |
2683657 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus,brine tanks and pump jack appear to be in sound condition. The site was covered with snow. The Department plans to follow up during the spring of 2018 to evaluate vegetative growth. |
For data sources see[7]