Well Details

Well ID: 37-003-22210
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 147760
Farm/Lease Name: BAKERSTOWN ROAD UNIT 2H
License Status:
Spud Date:
Permit Date: 2012-01-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.625083
Longitude: -79.783478

For data sources see[1][2][3]

Well History

Date Event
2012-01-17 New Permit Application
2012-05-18 Performed Spud Operation
2012-08-16 Drilling Completion
2012-09-25 Perforation
2013-11-06 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-13 2012-10-13 6,778 2,558,860

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC B-8520 Multi-Chem Group Antibacterial Agent 2-Amino-2-methylpropan-1-ol 124-68-5 1.00 0.00018000
3,4,4-Trimethyloxazolidine 75673-43-7 5.00 0.00090000
4,4-Dimethyloxazolidine 51200-87-4 78.00 0.01
Formaldehyde Amine 56652-26-7 0.50 0.00009000
Biocide MC B 8650 Multi-Chem Group Antibacterial Agent Glutaraldehyde 111-30-8 50.00 0.00395000
Methanol 67-56-1 0.50 0.00004000
CI-100 Frac Tech Services (FTS) Corrosion Inhibitor Propargyl alcohol 107-19-7 5.00 0.00003000
Methanol 67-56-1 95.00 0.00057000
37 HCL Frac Tech Services (FTS) Clean Perforations Hydrochloric acid 7647-01-0 37.00 0.02

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 RANGE RESOURCES APPALACHIA LLC 264,911.00 61 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 813,525.57 359 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 486,800.57 365 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 352,449.53 365 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 269,030.75 360 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 210,566.04 364 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 170,664.06 268 0.00 0 0.00 0
2019 RANGE RESOURCES APPALACHIA LLC 132,041.22 253 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 150.00 Bbl RESIDUAL WASTE TRANSFER FACILITY 301353
2012 RANGE RESOURCES APPALACHIA LLC Produced Fluid 29.76 Bbl REUSE OTHER THAN ROAD SPREADING
2012 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 165.75 Bbl LANDFILL 100592
2012 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 1,978.57 Bbl REUSE OTHER THAN ROAD SPREADING
2012 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 26.80 Tons LANDFILL 100434
2012 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 7.74 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2012 RANGE RESOURCES APPALACHIA LLC Drilling Fluid Waste 16.67 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2012 RANGE RESOURCES APPALACHIA LLC Fracing Fluid Waste 4,795.07 Bbl REUSE OTHER THAN ROAD SPREADING
2012 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 117.20 Tons LANDFILL 100172
2012 RANGE RESOURCES APPALACHIA LLC Drill Cuttings 737.98 Tons LANDFILL 100280
2013 RANGE RESOURCES APPALACHIA LLC Fracturing Fluid Waste 26.29 Tons LANDFILL 100172
2013 RANGE RESOURCES APPALACHIA LLC Produced Fluid 2,381.50 Bbl REUSE OTHER THAN ROAD SPREADING
2013 RANGE RESOURCES APPALACHIA LLC Produced Fluid 29.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 RANGE RESOURCES APPALACHIA LLC Fracing Fluid Waste 90.48 Bbl REUSE OTHER THAN ROAD SPREADING
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 1,400.90 Bbl REUSE OTHER THAN ROAD SPREADING
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 29.22 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 RANGE RESOURCES APPALACHIA LLC Produced Fluid 29.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 561.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 561.97 Bbl CENT WASTE TRT FAC NPDES PA0254185
2015 RANGE RESOURCES APPALACHIA LLC Produced Fluid 654.25 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 24.67 Bbl CENT WASTE TRT FAC NPDES PA0254185
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 27.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 137.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RANGE RESOURCES APPALACHIA LLC Produced Fluid 540.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 RANGE RESOURCES APPALACHIA LLC 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 15.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 59.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 95.04 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 233.56 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC 29.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RANGE RESOURCES APPALACHIA LLC Produced Fluid 41.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 RANGE RESOURCES APPALACHIA LLC 179.36 Bbl REUSE (AT WELL PAD)
2017 RANGE RESOURCES APPALACHIA LLC 15.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 172.09 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 66.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 35.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 276.83 Bbl REUSE (AT WELL PAD)
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 61.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RANGE RESOURCES APPALACHIA LLC Produced Fluid 0.07 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 100.08 Bbl REUSE (AT WELL PAD)
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RANGE RESOURCES APPALACHIA LLC Produced Fluid 27.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW015
2019 RANGE RESOURCES APPALACHIA LLC Other Oil & Gas Wastes 150.31 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2067387 Primary Facility 2012-05-01 Drilling/Alteration No Violations Noted ACCESS IS ALMOST COMPLETE. DRILLING PAD ISUNDER CONSTRUCTION.
2072468 Primary Facility 2012-05-16 Drilling/Alteration No Violations Noted INSPECTED SITE WITH RANGE RESOURCE'S JERAMY MATINKO. ACCESS AND PAD ARE COMPLETE. E&S CONTROLS ARE IN PLACE. THE CELLAR IS IN.
2074550 Primary Facility 2012-05-31 Drilling/Alteration No Violations Noted FALCON RIG 24 IS DRILLING 24" HOLE.
2074706 Primary Facility 2012-06-07 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE AT 5514'. SITE IS IN GOOD SHAPE.
2085922 Primary Facility 2012-07-18 Drilling/Alteration No Violations Noted DRILLING STOPPED AT 6,880, PLUGS WERE SET AND WELL WILL BE FINISHED LATER.
2085947 Primary Facility 2012-07-06 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE. PATTERSON 317 WILL FINISH THIS WELL.
2085949 Primary Facility 2012-07-12 Drilling/Alteration No Violations Noted PATTERSON 317 IS TESTING THE BOP, THEN WILL START DRILLING BOTTOM HOLE @ 5514'.
2095853 Primary Facility 2012-08-16 Drilling/Alteration No Violations Noted DRILLING AT 9,688'. THE SITE IS OK.
2096568 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted PRODUCTION CASING IS SET AT 9725'. THE SITE IS IN GOOD CONDITION.
2097858 Primary Facility 2012-09-05 Routine/Complete Inspection No Violations Noted John Ley, WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hill sides were temporarily stabilized with good growth. No accelerated erosion or sedimentation issues were observed on site or on the gated access road.
2102894 Primary Facility 2012-09-13 Drilling/Alteration No Violations Noted DRILLING IS COMPLETE. FRAC LINES PUT DOWN. GAS LINES BEING SET. SITE IS OK.
2106794 Primary Facility 2012-10-10 Drilling/Alteration No Violations Noted FOUR WELL PAD. ALL ARE BEING FRACED. NO PROBLEMS.
2109242 Primary Facility 2012-10-15 Drilling/Alteration No Violations Noted FRAC COMPLETE. EQUIPTMENT LEAVING THE SITE.
2121259 Primary Facility 2012-11-29 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING. THE SITE IS IN GOOD CONDITION.
2123031 Primary Facility 2012-12-11 Routine/Complete Inspection No Violations Noted John Ley Water Quality Specialist SWRO was on site to conduct a routine inspection. The site sign was in place and properly displayed the permits. The site E&S controls and BMP's were well constructed and in good shape. The access road was constructed according to plan and E&S controls were working properly. The well was drilled. The gathering line for the site was being constructed. The BMP's were in place and hillsides in this area were temporarily stabilized.
2131905 Primary Facility 2013-01-22 Incident- Response to Accident or Event In Compliance with Policy On 10/11/12, around 22:15, a release of approx. 30-35 gal reuse water occurred. Reuse water is being hauled to the site to use for the current frac operation. A new driver for Equipment Transfer pressed the wrong control while backing up to tanks, and sent water out of a spreader bar (which should NOT have been attached) onto the ground and into the tank containment. Weavertown Environmental was contacted to remediate the area by excavating affected gravel/soil, placing it into roll-off containers for disposal. The disposal records will be sent to you upon receipt.
2146661 Primary Facility 2013-03-06 Drilling/Alteration No Violations Noted THE WELLS ON THIS PAD ARE PRODUCING. AREA AROUND THE PAD IS BEING USED FOR ABOVE GROUND STORAGE OF WATER FOR SCHILLER FRACS.
2169269 Primary Facility 2013-05-22 Drilling/Alteration No Violations Noted VELOCITY TUBING HAS BEEN PUT IN THIS WELL. WELL HEAD HAS BEEN CHANGED TO MATCH TUBING. SITE IS OK.
2173358 Primary Facility 2013-05-20 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0001 Bakerstown 1-6H Well Site, Site 756992 (inspection record 2173345). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident. Workers were installing velocity tubing at the well site.
2195307 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0001 Bakerstown Road Unit 1-6H Well Site, Site 756992 (inspection record 2195256). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident. Site restoration period has been extended until May 16, 2015.
2231264 Primary Facility 2013-12-19 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0001 Bakerstown 1-6H Well Site, Site 756992 (inspection record 2231254). Site was snow-covered at time of inspection. No erosion or sedimentation issues were apparent. Production fluids were contained; no leaks were evident.
2310097 Primary Facility 2014-10-03 Routine/Complete Inspection In Compliance with Policy No erosion or sedimentation issues were evident. No leaks of fluids to the environment were noted. Two ASTs were noted, one near the access road entrance and one on a staging pad upslope from main pad area.
2400429 Primary Facility 2015-07-28 Routine/Complete Inspection No Violations Noted On 7/28/15, I inspected the Bakerstown Road site as a routine inspection and made the following observations:
2419413 Primary Facility 2015-10-22 Drilling/Alteration No Violations Noted THIS IS A WELL MAINTAINED GAS WELL. THE WELL IS FENCED AND LOCKED. THE PAD AND PRODUCTION EQUIPTMENT ARE IN GOOD CONDITION.
2448584 Primary Facility 2016-02-04 Routine/Complete Inspection No Violations Noted A PRODUCING UNCONVENTIONAL GAS WELL. THE WELL IS FENCED AND LOCKED.

ALL PRODUCTION EQUIPTMENT IS WELL MAINTAINED.

2483035 Primary Facility 2016-01-04 Routine/Partial Inspection No Violations Noted On 1/4/16, I performed a routine partial inspection of the Bakerstown Road Pad in response to an operator request for review of redline changes and made the following observations:

•The operator requested a redline change involving a temporary waterline crossing the site access road. The request was approved. •Site equipment appeared in good condition. Snow cover prevented inspection of surface features in most areas.

2660519 Primary Facility 2017-11-15 Site Restoration No Violations Noted Inspection in response to Post-Drilling Site Restoration Report received on 9/19/2017. Operator representative Erica Taylor also on site. ESCGP permit on site. PPC plan on site. Well pad area reduced in size. Rock removed from well pad stock piled on tank pad adjacent to well site. Operator indicated that rock will be reused on the JR Miller Well Site. The transportation of the stone is scheduled to begin on Friday 11/17/2017. Temporary E&S BMP silt sox remain on the perimeter of the reclaimed portion of the well pad. Operator indicated the silt sox is scheduled will be removed in the next few weeks. Operator also indicated that a plan to re-permit the site in order to keep the tank pads has been submitted to the Department and is under review. Earth disturbance activity authorized by the permit appear to be complete. No observation of accelerated erosion or sedimentation in relation to the well site or access road.
2733086 Primary Facility 2018-05-11 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, all four wells drilled and appear equipped for production.
2758907 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted The well site is in good condition. The above ground portion of this well is in good condition.