Well ID: 37-003-22172 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.545719,"lon":-80.111517,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Ohio Township | |
Operator Name: AMER NATURAL RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: GROVE/GRAMBO UNIT 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-14 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.545719 | |
Longitude: -80.111517 |
Date | Event |
---|---|
2011-03-14 | New Permit Application |
2011-05-11 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | AMER NATURAL RESOURCES LLC | Drilling Fluid Waste | 980.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | AMER NATURAL RESOURCES LLC | Fracing Fluid Waste | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | AMER NATURAL RESOURCES LLC | Drilling Fluid Waste | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1961884 | Primary Facility | 2011-03-24 | Routine/Complete Inspection | No Violations Noted | On March 24th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. The culverts outlets needed riprapped and some corrections were needed to the silt fence installation. The operator was contacted. No spills, leaks, or accelerated erosion were observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1976567 | Primary Facility | 2011-04-25 | Drilling/Alteration | No Violations Noted | THIS IS AVERY SMALL DRILL PAD. PIT IS ALSO SMALL. |
1981588 | Primary Facility | 2011-05-25 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. EQUIPTMENT GONE. |
1981591 | Primary Facility | 2011-05-13 | Drilling/Alteration | No Violations Noted | CONDUCTOR CEMENTED. SITE, PIT, E&S, AND ACCESS, OK. |
1983144 | Primary Facility | 2011-05-17 | Drilling/Alteration | No Violations Noted | 8 7/8" HOLE AT 700'. |
1983154 | Primary Facility | 2011-05-19 | Drilling/Alteration | No Violations Noted | RUNNING RODS AFTER 7" CEMENT TIME. |
1983160 | Primary Facility | 2011-05-12 | Drilling/Alteration | No Violations Noted | RIG IS UP. CONDUCTOR IS NOT IN. SMALL SITE. SMALL PIT. |
1983816 | Primary Facility | 2011-05-12 | Routine/Complete Inspection | No Violations Noted | On May 12th , 2011 I conducted a routine inspection of the above site. The rig was moving on site. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit was constructed but not yet lined. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1983833 | Primary Facility | 2011-05-16 | Routine/Complete Inspection | No Violations Noted | On May 16th , 2011 I conducted a routine inspection of the above site. Drilling currently. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1984194 | Primary Facility | 2011-05-17 | Routine/Complete Inspection | No Violations Noted | On May 17th , 2011 I conducted a routine inspection of the above site. Drilling currently. A site ID sign and E&S plan were posted at the site. The access road was becoming muddy. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition but was approaching the freeboard limit.. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1984220 | Primary Facility | 2011-05-19 | Routine/Complete Inspection | No Violations Noted | On May 19th , 2011 I conducted a routine inspection of the above site. Drilling currently. A site ID sign and E&S plan were posted at the site. The access road needed additional rock. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition but was approaching the freeboard limit.. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1993770 | Primary Facility | 2011-07-21 | Drilling/Alteration | No Violations Noted | NO ACTIVITY AT THIS SITE SINCE MAY 2011. PITS ARE STILL OPEN. |
2022425 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | Checked unit. Some E&S issues. |
2051766 | Primary Facility | 2012-03-20 | Administrative/File Review | No Violations Noted | On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Grove/Grambo Unit #2. The well reached total depth on 5/19/11 and restoration should have been done by 2/19/12. |
2052606 | Primary Facility | 2012-02-15 | Drilling/Alteration | No Violations Noted | A JACK IS SET AND HOOKED UP. THERE IS A SERVICE RIG AT THE WELL BUT THERE IS NO ACTIVITY. |
2143113 | Primary Facility | 2013-02-11 | Routine/Complete Inspection | No Violations Noted | WELL IS COMPLETE. JACK IS NOT HOOKED UP. RODS ARE ON THE GROUNG. SITE IN GOOD CONDITION. |
2247415 | Primary Facility | 2014-01-22 | Routine/Complete Inspection | No Violations Noted | WELL WAS DRILLED BUT NOT PRODUCED. |
2727983 | Primary Facility | 2018-05-04 | Routine/Complete Inspection | Violation(s) Noted | Well drilled. Well tag present. No accelerated erosion or sedimentation observed in relation the well site or access road. Brine tanks located on site not appear to be equipped for storage. The Brine tanks appear to be in sound condition and placed in an earthen berm. The Department recommends the Operator remove the brine tanks. The Department nots that the site appears to be restored. The Department recommends the a Operator removed the silt sox. The Department also detected an audible hiss and odor emanating from the well. The Department also observed well pipe onsite |
2742772 | Primary Facility | 2018-06-19 | Follow-up Inspection | Outstanding Violations - Viols Req'd | Follow up inspection related to violations issued on 5/4/2018, see inspection 2727983. At the time of inspection no audible hiss was observed. No accelerated erosion or sedimentation was observed. The brine tanks were located onsite. The Department observed approximately 40 sections of small diameter pipe stored on the ground adjacent to the well head. The Department recommends that the Operator removed the pipe or submit copies of landowner consent documents that allow the Operator to store the pipe at the well site. Violations remain outstanding for failure to remove unnecessary equipment within 9 months of competition. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2727983 | 816159 | 2018-05-04 | 2018-06-18 | OGA3216(C) | Environmental Health & Safety | |
2742772 | 819899 | 2018-06-19 | 2018-06-19 | OGA3216(C) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
816159 | 364468 | NOV - Notice of Violation | |||||
819899 | 364468 | NOV - Notice of Violation |
For data sources see[7]