Well Details

Well ID: 37-003-22124
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: LANE 2
License Status:
Spud Date:
Permit Date: 2010-04-14
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.490333
Longitude: -79.750806

For data sources see[1][2][3]

Well History

Date Event
2010-04-14 New Permit Application
2010-05-06 Performed Spud Operation
2010-05-19 Drilling Completion
2010-06-02 Perforation
2013-04-22 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 4,277.00 184 350.20 184 0.00 0
2011 PENNECO OIL CO INC 6,839.00 365 406.12 365 0.00 0
2012 PENNECO OIL CO INC 2,461.00 366 5.57 366 0.00 0
2013 PENNECO OIL CO INC 1,029.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 1,628.00 335 102.51 335 0.00 0
2015 PENNECO OIL CO INC 1,923.96 365 306.12 92 0.00 0
2016 PENNECO OIL CO INC 1,329.71 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 1,510.00 365 198.58 365 0.00 0
2018 PENNECO OIL CO INC 1,189.32 365 173.41 91 0.00 0
2019 PENNECO OIL CO INC 406.69 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PENNECO OIL CO INC Produced Fluid 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Drilling Fluid Waste 7,946.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PENNECO OIL CO INC Fracing Fluid Waste 1,100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2017 PENNECO OIL CO INC Produced Fluid 19.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 PENNECO OIL CO INC Produced Fluid 23.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 PENNECO OIL CO INC Produced Fluid 48.67 Bbl INJECTION DISPOSAL WELL 34-007-2-3177

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1875675 Primary Facility 2010-04-08 Routine/Complete Inspection No Violations Noted On April 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Little Plum Creek. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table.
1885579 Primary Facility 2010-05-19 Routine/Complete Inspection No Violations Noted On May 19th, 2010 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. A mud broom waas on site to keep the public roadway clean. All E&S controls were in place and constructed according to the plan at site.
1891220 Primary Facility 2010-06-04 Routine/Complete Inspection No Violations Noted On June 4th, 2010 I conducted a routine inspection of the above site. A swabbing rig was on site at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. The frac pit was constructed. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect the E&S controls routinely and after each significant runoff event until the site is restored.
1894764 Primary Facility 2010-05-13 Drilling/Alteration No Violations Noted prepare to run 7"
1894768 Primary Facility 2010-05-18 Drilling/Alteration No Violations Noted bit @3560'
1894969 Primary Facility 2010-05-10 Drilling/Alteration No Violations Noted HILL DRILLING THIS WELL,SUPERIOR ON SITE SETTING UP TO CEMENT 133/8"CASING.SITE,PIT,E&S,AND ACCES,OK.
1906411 Primary Facility 2010-07-21 Routine/Complete Inspection No Violations Noted On July 21st, 2010 I conducted a routine inspection of the above site. Drilling was completed and production equipment was set in place. The access road was in good condition. The site was graded, seeded, and was being mulched at the time of inspection. All E&S controls were still in place and constructed according to the plan at site. The operator should continue to inspect the E&S controls routinely and after each significant runoff event until 70% uniform vegetative cover is achieved.