X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22102

Well Details

Well ID: 37-003-22102
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Indiana Township
Operator Name: MARCO DRILLING INC
Well Pad ID:
Farm/Lease Name: CHARLES L VOGLE ETUX 1
License Status:
Spud Date:
Permit Date: 2010-02-18
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.571574
Longitude: -79.847302

For data sources see[1][2][3]

Well History

Date Event
2010-02-18 New Permit Application
2010-05-14 Performed Spud Operation
2010-05-28 Drilling Completion
2010-06-16 Perforation
2013-09-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MARCO DRILLING INC 443.00 90 362.40 90 0.00 0
2011 MARCO DRILLING INC 358.61 365 157.14 365 0.00 0
2012 MARCO DRILLING INC 502.8 365 237.04 365 0.00 0
2013 MARCO DRILLING INC 596.00 365 0.00 0 0.00 0
2014 MARCO DRILLING INC 527.00 365 88.71 365 0.00 0
2015 MARCO DRILLING INC 109.00 365 0.00 0 0.00 0
2016 MARCO DRILLING INC 603.00 365 125.88 365 0.00 0
2017 MARCO DRILLING INC 487.00 365 64.00 365 0.00 0
2018 MARCO DRILLING INC 453.00 365 58.00 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MARCO DRILLING INC Produced Fluid 240.00 Bbl ROAD SPREADING
2011 MARCO DRILLING INC Produced Fluid 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 MARCO DRILLING INC Produced Fluid 85.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011 MARCO DRILLING INC Produced Fluid 70.00 Bbl ROAD SPREADING
2011 MARCO DRILLING INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 MARCO DRILLING INC Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 MARCO DRILLING INC Produced Fluid 105.00 Bbl ROAD SPREADING
2013 MARCO DRILLING INC Produced Fluid 4,620.00 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 MARCO DRILLING INC Produced Fluid 4,620.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 MARCO DRILLING INC Produced Fluid 349.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 MARCO DRILLING INC Produced Fluid 349 Bbl CENT WASTE TRT FAC NPDES PA0101508
2017 MARCO DRILLING INC Produced Fluid 182.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018 MARCO DRILLING INC Produced Fluid 119.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1875602 Primary Facility 2010-04-08 Routine/Complete Inspection No Violations Noted On April 8, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. The well site is proposed to be constructed within 100 ft. from Long Run. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be encapsulated. Operator must ensure that the bottom of the pit is at least 20 inches above the seasonal high groundwater table.
1885611 Primary Facility 2010-05-19 Routine/Complete Inspection No Violations Noted On May 19, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. E&S controls were in place and constructed according to the plan on site. The pits appeared to be in good condition. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uinform 70% vegetative cover is achieved.
1890199 Primary Facility 2010-05-27 Routine/Complete Inspection No Violations Noted On May 27, 2010 I conducted a routine inspecion of the above site. Drilling was taking place. The access road was in good condition. A site ID sign and E&S plan were present. E&S controls were in place and constructed according to the plan on site. The pits appeared to be in good condition. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.
1894980 Primary Facility 2010-05-19 Drilling/Alteration No Violations Noted SITE,PIT,OK.DRILLING AT 840'.
1895131 Primary Facility 2010-05-25 Drilling/Alteration No Violations Noted USE RIG 5 RUNNING DRILL RODS AFTER BIT CHANGE.HOLE AT 1584 FT.
1895144 Primary Facility 2010-06-03 Drilling/Alteration No Violations Noted NEIGHBOR SAID SHE WAS CONCERNED THAT SOME DUST OR MIST HAD TRAVED ONTO HER PROPERTY.THE RIG WAS GONE WHEN I ARRIVED.I WIPED THE SIDE OF HER HOUSE WITH A PAPER TOWEL AND IT WAS CLEAN. I TALKED TO OPERATOR AND THEN THE NEIGHBOR AND TOLD HIM THAT THERE WERE NO CHEMICALS USED WHILE DRILLING.
1895145 Primary Facility 2010-05-28 Drilling/Alteration No Violations Noted DRILLING COMPLETE.TD 3250 ft.USE RIG 5 WAITING FOR LOGGING TRUCK.
1895148 Primary Facility 2010-06-14 Drilling/Alteration No Violations Noted I RECIEVED CALL FROM CONCERN NEIGHBOR.SHE WAS WORRIED ABOUT A LOUD NOISE AND HISSING SOUND SHE THOUGHT CAME FROM DRILLING SITE.THE LOUD NOISE WAS CREW BLOWING DOWN WELL BEFORE RUNNING TUBING INTO THE WELL.
1895156 Primary Facility 2010-06-11 Drilling/Alteration No Violations Noted DRILLING COMPLETE. USE RIG 5 HAS MOVED OFF THE SITE. PIT IS GONE,AND THE SITE IS BEING GRADED.
1902494 Primary Facility 2010-07-01 Routine/Complete Inspection No Violations Noted On July 1st, 2010 I conducted a routine inspecion of the above site. Drilling was completed. The access road was in good condition. A site ID sign and E&S plan were present. E&S controls were in place and constructed according to the plan on site. The pits were closed and filled. A pump jack and various piping was being installed. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is achieved.

For data sources see[7]

References