If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22075 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.489242,"lon":-79.718228,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: CHEREP 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-08-05 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.489242 | |
Longitude: -79.718228 |
Date | Event |
---|---|
2009-08-05 | New Permit Application |
2009-09-08 | Performed Spud Operation |
2009-09-15 | Drilling Completion |
2009-09-22 | Perforation |
2010-04-21 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PENNECO OIL CO INC | 284.00 | 61 | 7.00 | 61 | 0.00 | 0 |
2010 | PENNECO OIL CO INC | 24,583.00 | 365 | 1509.59 | 365 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 10,390.00 | 365 | 449.95 | 365 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 11,059.00 | 366 | 616.89 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 3,506.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 10,541.00 | 365 | 351.76 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 11,936.31 | 365 | 332.21 | 61 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 8,806.09 | 366 | 167.74 | 30 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 5,902.00 | 365 | 165.25 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 3,952.04 | 365 | 134.78 | 30 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 3,589.04 | 365 | 273.87 | 61 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | PENNECO OIL CO INC | Drilling | 800.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | PENNECO OIL CO INC | Fracking Fluid | 1,280.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | PENNECO OIL CO INC | Produced Fluid | 134.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 20.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2019 | PENNECO OIL CO INC | Produced Fluid | 89.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1826501 | Primary Facility | 2009-09-08 | Routine/Complete Inspection | No Violations Noted | Drilling was not completed. |
1831626 | Primary Facility | 2009-09-24 | Routine/Complete Inspection | No Violations Noted | Drilling was completed. |
1836419 | Primary Facility | 2009-09-14 | Drilling/Alteration | No Violations Noted | HILL DRILLING AT 2927' |
1836421 | Primary Facility | 2009-09-08 | Drilling/Alteration | No Violations Noted | |
1882870 | Primary Facility | 2010-04-01 | Drilling/Alteration | No Violations Noted | WELL COMPLETE. JACK AND TANKS ARE SET. SITE IS RESTORED. |
1984900 | Primary Facility | 2011-06-01 | Routine/Complete Inspection | No Violations Noted | On June 1st , 2010 I conducted a routine inspection of the above site. The well was in production. Drilling was completed 9/15/2009. The access road was in good condition. A well tag was secured to the well. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of the inspection. The site was well vegetated. |
2001730 | Primary Facility | 2011-08-17 | Routine/Complete Inspection | No Violations Noted | OIL WELL WITH DUMP, JACK, AND TWO TANKS. |
2054228 | Primary Facility | 2012-02-22 | Routine/Complete Inspection | No Violations Noted | THIS PRODUCING OIL AND GAS WELL WAS OPERATING AT THE TIME OF INSPECTION. |
For data sources see[7]