Well ID: 37-003-21567
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Penn Hills Township
Operator Name: HUNTLEY & HUNTLEY INC
Well Pad ID:
Farm/Lease Name: MULLEN UNIT 1
License Status: ACTIVE
Spud Date:
Permit Date: 2002-07-25
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.497261
Longitude: -79.796453

For data sources see[1][2][3]

Well History

Date Event
2002-07-25 New Permit Application
2002-10-22 Performed Spud Operation
2002-10-30 Drilling Completion
2004-06-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2002 HUNTLEY & HUNTLEY INC 0.00 0 0.00 0 0.00 0
2003 HUNTLEY & HUNTLEY INC 534.00 30 0.00 0 0.00 0
2005 HUNTLEY & HUNTLEY INC 6818 365 0.00 0 0.00 0
2006 HUNTLEY & HUNTLEY INC 4991.00 365 0.00 0 0.00 0
2008 HUNTLEY & HUNTLEY INC 2664.00 365 0.00 0 0.00 0
2009 HUNTLEY & HUNTLEY INC 2,822.00 365 0.00 0 0.00 0
2010 HUNTLEY & HUNTLEY INC 2,356.00 365 0.00 0 0.00 0
2011 HUNTLEY & HUNTLEY INC 2,124.00 365 0.00 0 0.00 0
2012 HUNTLEY & HUNTLEY INC 2,093.00 366 0.00 0 0.00 0
2013 HUNTLEY & HUNTLEY INC 1,648.65 365 0.00 0 0.00 0
2014 HUNTLEY & HUNTLEY INC 2,609.00 365 0.00 0 0.00 0
2015 HUNTLEY & HUNTLEY INC 1,537.00 273 0.00 0 0.00 0
2016 HUNTLEY & HUNTLEY INC 825.00 243 0.00 0 0.00 0
2017 HUNTLEY & HUNTLEY INC 850.00 290 0.00 0 0.00 0
2018 HUNTLEY & HUNTLEY INC 725.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 HUNTLEY & HUNTLEY INC Brine 464.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2003 HUNTLEY & HUNTLEY INC Brine 464.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2005 HUNTLEY & HUNTLEY INC Brine 440.00 Bbl Municipal Sewage Treatment Plant PA0026255
2005 HUNTLEY & HUNTLEY INC Brine 145.00 Bbl Other
2008 HUNTLEY & HUNTLEY INC Brine 130.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008 HUNTLEY & HUNTLEY INC Brine 205.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2013 HUNTLEY & HUNTLEY INC Produced Fluid 250 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 HUNTLEY & HUNTLEY INC Produced Fluid 250.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 HUNTLEY & HUNTLEY INC Produced Fluid 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2018 HUNTLEY & HUNTLEY INC Produced Fluid 200.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1160415 Primary Facility 2002-08-16 Routine/Complete Inspection No Violations Noted Accesses off a curve on Hulton Rd., location stoney, access rocked & crowned. Pit: excavated loc. Bench is staked. Site bench awaits rig. Shoulder slope moderate.
1238253 Primary Facility 2003-05-27 Routine/Complete Inspection No Violations Noted Six tanks are within the diking system, brine & oil tanks. Well is metered, equipped. Some storage of pipe equipt. and alcohol & foaming agents at bench area for well use. Restoration uniform revegetating. Access is stoned & graveled. Also a gated entrance here. Well tagged.
1902427 Primary Facility 2010-06-24 Routine/Complete Inspection No Violations Noted On June 24th, 2010 I conducted a routine inspection of the above site. Drilling was completed October 30th, 2002. The well was in production. The access road was in good condition. A well tag was present. the site was well vegetated and no accelerated erosion was observed. There was a lot of excess drilling supplies being stored onsite including drill rods, casing, gas line, drums, etc. There was also a diked area containing 6 storage tanks, 3 oil and 3 brine. The containment area was lined with a 30 mil plastic liner. There was 6-10 inches of oil and water inside the diked area from spillage and sloppy materials handling. Another storage tank located outside of the diked area that contained white water. A meeting was set for 6/28 with the operator to discuss the issues on site.
1902437 Primary Facility 2010-06-28 Routine/Complete Inspection No Violations Noted On June 28th, 2010 I met with Huntley & Huntley representative John Hodson onsite to discuss the issues from the 06/24/2010 inspection. The operator agreed to have all excess material removed from site. All liquids will be removed from the diked area and put back into tanks or disposed of properly. The tank outside of the containment area will have a dike constructed around it in case it is used for oil storage in the future. All work and site cleanup is to be completed in a timely fashion.
1902447 Primary Facility 2010-07-22 Routine/Complete Inspection No Violations Noted On July 22nd, 2010 I met with Huntley & Huntley representative John Hodson onsite to discuss the issues and progress made from the 06/28/2010 inspection. All excess material had been removed from site. All liquids from the containment area had been removed and a general cleanup had taken place. The tank that was located outside of the dike was now in a lined containment area surrounded by a dike. A tracking program/ sign in sheet was being implemented to create accountability for the site and to prevent future materials handling problems.
1910858 Primary Facility 2010-08-12 Routine/Complete Inspection No Violations Noted On August 12th, 2010 I conducted a follow up inspection of the above site. Excess rain water from the diked area was being pumped into the tanks. A stone walkway was constructed around the tanks in the dike. Vegetation was coming in nicely on the newly seeded areas. The operator should continue to inspect and monitor materials handling at the site.
1940324 Primary Facility 2010-12-28 Routine/Complete Inspection No Violations Noted On December 28th, 2010 I conducted a follow up inspection of the above site in response to clean up activities that occurred over the summer months. The tank storage area looked good. No new spills or leaks were observed. The diked area was now surrounded by a security fence. Extra signage was added. The operator should continue to inspect and monitor materials handling at the site.