X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1225231308000

Well Details

Well ID: 1225231308000
Loading map...
Location: 00/08-13-122-23W5/0
Location Alias: 00/08-13-22-23 W5M
Location Alias 2: 00/08-13-122-23 W5/00
Country: Canada
Province: Alberta
Township: 122
Meridian: 5
Range: 23
Section: 13
County/Municipality: Mackenzie County
Well Name: STRATEGIC MARLOWE 8-13-122-23
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0386759
License Date: 2007-12-05
License Status: Issued
Spud Date: 2007-12-28
Final Drill Date: 2008-01-05
Well Total Depth: 1511.00 m
Surface Hole Latitude: 59.597243
Surface Hole Longitude: -117.798618

For data sources see[1][2]

Well History

Date Event
2007-12-05 Obtained License
2007-12-29 Surface Casing Operation Performed
2008-01-05 Finished Drilling
2008-01-05 Well Mode changed to Drilled and Cased
2008-01-06 Production Casing Operation Performed
2008-01-06 Well Log Performed
2008-01-08 Rig Released
2008-01-23 Perforation Treatment Performed - Jet Perforation
2008-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-04 Well Began Production
2008-03-04 Well Fluid changed to Crude Oil
2008-03-04 Well Mode changed to Pumping
2010-01-01 Well Fluid changed to Crude Oil
2010-01-01 Well Mode changed to Suspended
2011-01-03 Well Fluid changed to Crude Oil
2011-01-03 Well Mode changed to Abandoned Zone
2011-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-23 Plug Back Performed
2011-01-25 Perforation Treatment Performed - Jet Perforation
2011-01-31 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-23 Perforation 1441.50 1444.50 17
2008-01-23 Perforation 1449.00 1453.00 17
2008-01-23 Perforation 1456.00 1457.00 17
2008-02-05 Acid Treatment 1441.50 1457.00 0
2011-01-23 Packing Device Capped w/Cement 1422.00 1430.00 0
2011-01-25 Perforation 1327.00 1328.00 13
2011-01-25 Perforation 1323.00 1325.00 13
2011-01-25 Perforation 1317.00 1321.00 13
2011-01-31 Perforation 1285.00 1288.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 240 0.0 0.0 0.0

For data sources see[5]

References