X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1225230105000

Well Details

Well ID: 1225230105000
Loading map...
Location: 00/05-01-122-23W5/0
Location Alias: 00/05-01-22-23 W5M
Location Alias 2: 00/05-01-122-23 W5/00
Country: Canada
Province: Alberta
Township: 122
Meridian: 5
Range: 23
Section: 01
County/Municipality: Mackenzie County
Well Name: STRATEGIC HZ MARLOWE 5-1-122-23
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0482834
License Date: 2017-02-10
License Status: Issued
Spud Date: 2018-01-16
Final Drill Date: 2018-01-27
Well Total Depth: 3439.00 m
Surface Hole Latitude: 59.577674
Surface Hole Longitude: -117.853392

For data sources see[1][2]

Well History

Date Event
2017-02-10 Obtained License
2018-01-17 Surface Casing Operation Performed
2018-01-20 Direction Drilling Operation Performed - Deviate
2018-01-21 Direction Drilling Operation Performed - Horizontal
2018-01-22 Well Log Performed
2018-01-27 Finished Drilling
2018-01-27 Well Log Performed
2018-01-27 Well Mode changed to Drilled and Cased
2018-01-28 Production Casing Operation Performed
2018-01-28 Well Log Performed
2018-01-29 Rig Released
2018-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-09 Well Began Production
2018-03-09 Well Fluid changed to Crude Oil
2018-03-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-16 Savanna Drilling Corp. 626 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-20 1160.00 Deviate (5 - 79 degrees)
2018-01-21 1486.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-25 Multi-Stage Fracture 3375.30 3375.40 0
2018-02-26 Multi-Stage Fracture 2577.50 2577.60 0
2018-02-26 Multi-Stage Fracture 2529.20 2529.30 0
2018-02-26 Multi-Stage Fracture 2480.80 2480.90 0
2018-02-26 Multi-Stage Fracture 2420.90 2421.00 0
2018-02-26 Multi-Stage Fracture 2373.00 2373.10 0
2018-02-26 Multi-Stage Fracture 2324.60 2324.70 0
2018-02-26 Multi-Stage Fracture 2276.00 2276.10 0
2018-02-26 Multi-Stage Fracture 2227.70 2227.80 0
2018-02-26 Multi-Stage Fracture 2179.30 2179.40 0
2018-02-26 Multi-Stage Fracture 2131.00 2131.10 0
2018-02-25 Multi-Stage Fracture 3281.50 3281.60 0
2018-02-27 Multi-Stage Fracture 2071.20 2071.30 0
2018-02-27 Multi-Stage Fracture 2023.10 2023.20 0
2018-02-27 Multi-Stage Fracture 1974.80 1974.90 0
2018-02-27 Multi-Stage Fracture 1926.60 1926.70 0
2018-02-27 Multi-Stage Fracture 1878.40 1878.50 0
2018-02-27 Multi-Stage Fracture 1829.90 1830.00 0
2018-02-27 Multi-Stage Fracture 1782.20 1782.30 0
2018-02-27 Multi-Stage Fracture 1722.40 1722.50 0
2018-02-27 Multi-Stage Fracture 1674.60 1674.70 0
2018-02-27 Multi-Stage Fracture 1626.60 1626.70 0
2018-02-25 Multi-Stage Fracture 3175.60 3175.70 0
2018-02-27 Multi-Stage Fracture 1521.50 1521.60 0
2018-02-26 Multi-Stage Fracture 3081.20 3081.30 0
2018-02-26 Multi-Stage Fracture 2976.20 2976.30 0
2018-02-26 Multi-Stage Fracture 2882.00 2882.10 0
2018-02-26 Multi-Stage Fracture 2779.10 2779.20 0
2018-02-26 Multi-Stage Fracture 2674.60 2674.70 0
2018-02-26 Multi-Stage Fracture 2626.50 2626.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-25 2018-02-27 1,394 3,246 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 92.9739 N/A
30/50 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 6.7673 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0106 N/A
Methyl Alcohol 67-56-1 100 0.0106 N/A
Non-Hazardous Ingredients Not Available 100 0.0106 N/A
SCBO-1A (Encapsulated Breaker) Step Energy Services Breaker 2-Propenoic acid. methyl ester.
polymer with 1.1-dichloroethane
25038-72-6 100 0.0117 N/A
Ammonium Persulfate 7727-54-0 100 0.0117 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1047 N/A
Water 7732-18-5 100 0.1047 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0752 N/A
Non-Hazardous Ingredients Not Available 100 0.0752 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0752 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.247 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.247 N/A
SNE-7 (Non-Emulsifier) Step Energy Services Surfactant 2-Heptanone. 4.6-dimethyl- 19549-80-5 100 0.1598 N/A
Alcohols. C10-16. ethoxylated. liquids 68002-97-1 100 0.1598 N/A
Diisobutyl ketone 108-83-8 100 0.1598 N/A
Dimethyl adipate 627-93-0 100 0.1598 N/A
Dimethyl glutarate 1119-40-0 100 0.1598 N/A
Dimethyl Succinate 106-65-0 100 0.1598 N/A
Formaldehyde. polymer with 4-(1.
1-dimethylethyl)phenol. methyloxirane and oxirane
30704-64-4 100 0.1598 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-23 2018-02-27 Surface Water - River 3054
2018-02-21 2018-02-27 Municipal Water 320

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6936 0.0 0.0 0.0
2019 7518 0.0 0.0 0.0
2020 2036 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-29 No Incident Encountered 0.00 0.00
2018-03-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References