X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1225212706020

Well Details

Well ID: 1225212706020
Loading map...
Location: 02/06-27-122-21W5/0
Location Alias: 02/06-27-22-21 W5M
Location Alias 2: 02/06-27-122-21 W5/00
Country: Canada
Province: Alberta
Township: 122
Meridian: 5
Range: 21
Section: 27
County/Municipality: Mackenzie County
Well Name: STRATEGIC 102 MARLOWE 6-27-122-21
Operator Name: Strategic Oil & Gas Ltd.
License Number: 0447633
License Date: 2012-08-08
License Status: Suspension
Spud Date: 2012-09-16
Final Drill Date: 2012-09-21
Well Total Depth: 1250.00 m
Surface Hole Latitude: 59.627268
Surface Hole Longitude: -117.531313

For data sources see[1][2]

Well History

Date Event
2012-08-08 Obtained License
2012-09-17 Surface Casing Operation Performed
2012-09-18 Direction Drilling Operation Performed - Deviate
2012-09-21 Finished Drilling
2012-09-21 Well Mode changed to Drilled and Cased
2012-09-22 Well Log Performed
2012-09-25 Production Casing Operation Performed
2012-09-26 Rig Released
2012-10-07 Perforation Treatment Performed - Jet Perforation
2012-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-23 Well Began Production
2012-10-23 Well Fluid changed to Crude Oil
2012-10-23 Well Mode changed to Pumping
2013-02-11 Perforation Treatment Performed - Jet Perforation
2013-02-14 Perforation Treatment Performed - Fractured
2013-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-15 Perforation Treatment Performed - Fractured
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-16 Terroco Drilling Company 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-18 215.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-07 Perforation 988.50 994.00 17
2012-10-08 Acid Treatment 988.50 994.00 0
2013-02-11 Perforation 1225.00 1230.00 17
2013-02-14 Fracture 1225.00 1230.00 0
2013-02-15 Acid Treatment 1225.00 1230.00 0
2013-02-15 Fracture 1225.00 1230.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-14 2013-02-15 1,169 177 N/A
2 2013-02-15 2013-02-15 1,169 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Trade Secret 100 98.6294 N/A
2 Badger Halliburton 100 Mesh Sand Trade Secret 100 0.2857 N/A
30/50 Frac Sand Trade Secret 100 1.9045 N/A
FR-66 Halliburton Friction Reducer FR-66 Friction Reducer Trade Secret 100 0.1748 N/A
Losurf 3000 Halliburton Surfactant Losurf Surfactant Trade Secret 100 0.3759 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-12 2013-02-13 Municipal Water 177

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2031 0.0 0.0 0.0
2013 1756 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-26 No Incident Encountered 0.00 0.00
2012-10-13 No Incident Encountered 0.00 0.00
2013-02-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References