X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206081812000

Well Details

Well ID: 1206081812000
Loading map...
Location: 00/12-18-120-08W6/0
Location Alias: 00/12-18-20-08 W6M
Location Alias 2: 00/12-18-120-08 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 18
County/Municipality: Mackenzie County
Well Name: ACL AMIGO 12-18-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0247638
License Date: 2000-12-20
License Status: Abandoned
Spud Date: 2001-01-24
Final Drill Date: 2001-02-15
Well Total Depth: 1875.00 m
Surface Hole Latitude: 59.425328
Surface Hole Longitude: -119.379476

For data sources see[1][2]

Well History

Date Event
2000-12-20 Obtained License
2001-01-26 Surface Casing Operation Performed
2001-01-27 Direction Drilling Operation Performed - Deviate
2001-02-10 Well Log Performed
2001-02-12 Production Casing Operation Performed
2001-02-15 Finished Drilling
2001-02-15 Well Log Performed
2001-02-17 Liner Casing Operation Performed
2001-02-17 Rig Released
2001-02-17 Well Mode changed to Drilled and Cased
2001-02-19 Well Log Performed
2001-03-12 Well Log Performed
2001-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-13 Perforation Treatment Performed - Jet Perforation
2001-03-13 Well Log Performed
2001-04-02 Well Began Production
2001-04-02 Well Fluid changed to Gas
2001-04-02 Well Mode changed to Flowing
2007-02-06 Well Log Performed
2007-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-07 Plug Back Performed
2007-02-07 Well Fluid changed to Gas
2007-02-07 Well Log Performed
2007-02-07 Well Mode changed to Abandoned Zone
2007-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-08 Perforation Treatment Performed - Jet Perforation
2007-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-14 Perforation Treatment Performed - Cement Plug
2011-02-14 Well Log Performed
2011-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-15 Plug Back Performed
2011-02-15 Well Log Performed
2011-02-16 Well Log Performed
2011-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-17 Perforation Treatment Performed - Jet Perforation
2011-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-19 Perforation Treatment Performed - Remedial Casing
2011-02-19 Well Log Performed
2011-02-20 Perforation Treatment Performed - Jet Perforation
2011-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-21 Perforation Treatment Performed - Remedial Casing
2011-02-22 Well Log Performed
2011-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-25 Perforation Treatment Performed - Remedial Casing
2011-02-26 Perforation Treatment Performed - Jet Perforation
2011-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-28 Perforation Treatment Performed - Remedial Casing
2011-02-28 Well Log Performed
2011-03-01 Perforation Treatment Performed - Jet Perforation
2011-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-03 Perforation Treatment Performed - Remedial Casing
2011-03-04 Well Log Performed
2011-03-05 Perforation Treatment Performed - Jet Perforation
2011-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-06 Perforation Treatment Performed - Remedial Casing
2011-03-08 Well Log Performed
2011-03-09 Well Log Performed
2011-03-10 Well Log Performed
2011-03-11 Perforation Treatment Performed - Jet Perforation
2011-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-13 Perforation Treatment Performed - Remedial Casing
2011-03-13 Well Log Performed
2011-03-14 Well Log Performed
2011-03-15 Perforation Treatment Performed - Jet Perforation
2011-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-16 Perforation Treatment Performed - Remedial Casing
2011-03-18 Perforation Treatment Performed - Jet Perforation
2011-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-29 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-01-27 610.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-03-13 Perforation 1760.00 1764.00 13
2011-02-17 Perforation 964.00 965.00 13
2011-02-17 Perforation 593.00 594.00 13
2011-02-17 Packing Device Capped w/Cement 952.00 960.00 0
2011-02-18 Acid Treatment 593.00 594.00 0
2011-02-19 Remedial Casing Cementing 593.00 594.00 0
2011-02-20 Perforation 521.00 522.00 13
2011-02-21 Packing Device Capped w/Cement 509.90 518.00 0
2011-02-21 Acid Treatment 521.00 522.00 0
2011-02-21 Remedial Casing Cementing 521.00 522.00 0
2011-02-23 Perforation 410.00 411.00 13
2001-03-13 Acid Treatment 1760.00 1764.00 0
2011-02-23 Acid Treatment 410.00 411.00 0
2011-02-25 Remedial Casing Cementing 410.00 411.00 0
2011-02-25 Packing Device Capped w/Cement 397.20 406.20 0
2011-02-26 Perforation 384.00 385.00 13
2011-02-27 Acid Treatment 384.00 385.00 0
2011-02-28 Remedial Casing Cementing 384.00 385.00 0
2011-03-01 Perforation 360.00 361.00 13
2011-03-02 Acid Treatment 360.00 361.00 0
2011-03-03 Remedial Casing Cementing 360.00 361.00 0
2011-03-05 Perforation 360.00 361.00 99
2007-02-07 Packing Device Capped w/Cement 1742.00 1750.00 0
2011-03-06 Remedial Casing Cementing 360.00 361.00 0
2011-03-06 Acid Treatment 360.00 361.00 0
2011-03-11 Perforation 348.00 349.00 99
2011-03-12 Acid Treatment 348.00 349.00 0
2011-03-13 Remedial Casing Cementing 348.00 349.00 0
2011-03-15 Perforation 325.00 326.00 99
2011-03-16 Acid Treatment 325.00 326.00 0
2011-03-16 Remedial Casing Cementing 325.00 326.00 0
2011-03-18 Perforation 309.00 312.00 99
2011-03-19 Acid Treatment 309.00 312.00 0
2007-02-08 Packing Device Capped w/Cement 1652.70 1685.00 0
2011-03-19 Packing Device Capped w/Cement 246.70 322.00 0
2007-02-08 Perforation 1564.50 1565.50 14
2007-02-08 Perforation 1566.50 1569.50 14
2007-02-09 Acid Treatment 1564.50 1569.50 0
2011-02-14 Cement Plug 1612.00 1652.70 0
2011-02-15 Packing Device Capped w/Cement 1549.00 1557.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 666 0.0 0.0 0.0

For data sources see[6]

References