If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1206081812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.425328,"lon":-119.379476,"icon":""}]} |
| Location: 00/12-18-120-08W6/0 | |
| Location Alias: 00/12-18-20-08 W6M | |
| Location Alias 2: 00/12-18-120-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 120 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 18 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL AMIGO 12-18-120-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0247638 | |
| License Date: 2000-12-20 | |
| License Status: Abandoned | |
| Spud Date: 2001-01-24 | |
| Final Drill Date: 2001-02-15 | |
| Well Total Depth: 1875.00 m | |
| Surface Hole Latitude: 59.425328 | |
| Surface Hole Longitude: -119.379476 |
| Date | Event |
|---|---|
| 2000-12-20 | Obtained License |
| 2001-01-26 | Surface Casing Operation Performed |
| 2001-01-27 | Direction Drilling Operation Performed - Deviate |
| 2001-02-10 | Well Log Performed |
| 2001-02-12 | Production Casing Operation Performed |
| 2001-02-15 | Finished Drilling |
| 2001-02-15 | Well Log Performed |
| 2001-02-17 | Liner Casing Operation Performed |
| 2001-02-17 | Rig Released |
| 2001-02-17 | Well Mode changed to Drilled and Cased |
| 2001-02-19 | Well Log Performed |
| 2001-03-12 | Well Log Performed |
| 2001-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-03-13 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-13 | Well Log Performed |
| 2001-04-02 | Well Began Production |
| 2001-04-02 | Well Fluid changed to Gas |
| 2001-04-02 | Well Mode changed to Flowing |
| 2007-02-06 | Well Log Performed |
| 2007-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-07 | Plug Back Performed |
| 2007-02-07 | Well Fluid changed to Gas |
| 2007-02-07 | Well Log Performed |
| 2007-02-07 | Well Mode changed to Abandoned Zone |
| 2007-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-08 | Perforation Treatment Performed - Jet Perforation |
| 2007-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-14 | Perforation Treatment Performed - Cement Plug |
| 2011-02-14 | Well Log Performed |
| 2011-02-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-15 | Plug Back Performed |
| 2011-02-15 | Well Log Performed |
| 2011-02-16 | Well Log Performed |
| 2011-02-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-19 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-19 | Well Log Performed |
| 2011-02-20 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-21 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-22 | Well Log Performed |
| 2011-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-23 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-02-25 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-28 | Perforation Treatment Performed - Remedial Casing |
| 2011-02-28 | Well Log Performed |
| 2011-03-01 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-03-03 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-04 | Well Log Performed |
| 2011-03-05 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-03-06 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-08 | Well Log Performed |
| 2011-03-09 | Well Log Performed |
| 2011-03-10 | Well Log Performed |
| 2011-03-11 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-03-13 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-13 | Well Log Performed |
| 2011-03-14 | Well Log Performed |
| 2011-03-15 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-03-16 | Perforation Treatment Performed - Remedial Casing |
| 2011-03-18 | Perforation Treatment Performed - Jet Perforation |
| 2011-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-03-29 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2001-01-27 | 610.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2001-03-13 | Perforation | 1760.00 | 1764.00 | 13 |
| 2011-02-17 | Perforation | 964.00 | 965.00 | 13 |
| 2011-02-17 | Perforation | 593.00 | 594.00 | 13 |
| 2011-02-17 | Packing Device Capped w/Cement | 952.00 | 960.00 | 0 |
| 2011-02-18 | Acid Treatment | 593.00 | 594.00 | 0 |
| 2011-02-19 | Remedial Casing Cementing | 593.00 | 594.00 | 0 |
| 2011-02-20 | Perforation | 521.00 | 522.00 | 13 |
| 2011-02-21 | Packing Device Capped w/Cement | 509.90 | 518.00 | 0 |
| 2011-02-21 | Acid Treatment | 521.00 | 522.00 | 0 |
| 2011-02-21 | Remedial Casing Cementing | 521.00 | 522.00 | 0 |
| 2011-02-23 | Perforation | 410.00 | 411.00 | 13 |
| 2001-03-13 | Acid Treatment | 1760.00 | 1764.00 | 0 |
| 2011-02-23 | Acid Treatment | 410.00 | 411.00 | 0 |
| 2011-02-25 | Remedial Casing Cementing | 410.00 | 411.00 | 0 |
| 2011-02-25 | Packing Device Capped w/Cement | 397.20 | 406.20 | 0 |
| 2011-02-26 | Perforation | 384.00 | 385.00 | 13 |
| 2011-02-27 | Acid Treatment | 384.00 | 385.00 | 0 |
| 2011-02-28 | Remedial Casing Cementing | 384.00 | 385.00 | 0 |
| 2011-03-01 | Perforation | 360.00 | 361.00 | 13 |
| 2011-03-02 | Acid Treatment | 360.00 | 361.00 | 0 |
| 2011-03-03 | Remedial Casing Cementing | 360.00 | 361.00 | 0 |
| 2011-03-05 | Perforation | 360.00 | 361.00 | 99 |
| 2007-02-07 | Packing Device Capped w/Cement | 1742.00 | 1750.00 | 0 |
| 2011-03-06 | Remedial Casing Cementing | 360.00 | 361.00 | 0 |
| 2011-03-06 | Acid Treatment | 360.00 | 361.00 | 0 |
| 2011-03-11 | Perforation | 348.00 | 349.00 | 99 |
| 2011-03-12 | Acid Treatment | 348.00 | 349.00 | 0 |
| 2011-03-13 | Remedial Casing Cementing | 348.00 | 349.00 | 0 |
| 2011-03-15 | Perforation | 325.00 | 326.00 | 99 |
| 2011-03-16 | Acid Treatment | 325.00 | 326.00 | 0 |
| 2011-03-16 | Remedial Casing Cementing | 325.00 | 326.00 | 0 |
| 2011-03-18 | Perforation | 309.00 | 312.00 | 99 |
| 2011-03-19 | Acid Treatment | 309.00 | 312.00 | 0 |
| 2007-02-08 | Packing Device Capped w/Cement | 1652.70 | 1685.00 | 0 |
| 2011-03-19 | Packing Device Capped w/Cement | 246.70 | 322.00 | 0 |
| 2007-02-08 | Perforation | 1564.50 | 1565.50 | 14 |
| 2007-02-08 | Perforation | 1566.50 | 1569.50 | 14 |
| 2007-02-09 | Acid Treatment | 1564.50 | 1569.50 | 0 |
| 2011-02-14 | Cement Plug | 1612.00 | 1652.70 | 0 |
| 2011-02-15 | Packing Device Capped w/Cement | 1549.00 | 1557.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 666 | 0.0 | 0.0 | 0.0 |
For data sources see[6]