X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206080705003

Well Details

Well ID: 1206080705003
Loading map...
Location: 00/05-07-120-08W6/3
Location Alias: 00/05-07-20-08 W6M
Location Alias 2: 00/05-07-120-08 W6/03
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL AMIGO 5-7-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0230972
License Date: 1999-12-20
License Status: Abandoned
Spud Date: 2000-01-02
Final Drill Date: 2000-01-26
Well Total Depth: 1927.00 m
Surface Hole Latitude: 59.405562
Surface Hole Longitude: -119.372514

For data sources see[1][2]

Well History

Date Event
1999-12-20 Obtained License
2000-01-05 Surface Casing Operation Performed
2000-01-12 Direction Drilling Operation Performed - Deviate
2000-01-21 Well Log Performed
2000-01-22 Intermediate Casing Operation Performed
2000-01-26 Finished Drilling
2000-01-26 Lost Circulation Occurred
2000-01-26 Well Log Performed
2000-01-26 Well Mode changed to Drilled and Cased
2000-01-27 Well Log Performed
2000-01-28 Liner Casing Operation Performed
2000-01-28 Well Log Performed
2000-01-29 Rig Released
2000-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-06 Perforation Treatment Performed - Jet Perforation
2000-02-06 Well Log Performed
2000-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-10 Perforation Treatment Performed - Jet Perforation
2000-02-10 Well Log Performed
2000-02-12 Perforation Treatment Performed - Cement Squeeze
2000-02-12 Plug Back Performed
2000-02-12 Well Log Performed
2000-02-15 Perforation Treatment Performed - Cement Squeeze
2000-02-15 Plug Back Performed
2000-02-24 Well Log Performed
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-14 Well Began Production
2008-03-14 Well Fluid changed to Gas
2008-03-14 Well Mode changed to Flowing
2009-03-15 Well Log Performed
2009-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-19 Perforation Treatment Performed - Cement Squeeze
2009-03-19 Plug Back Performed
2009-03-19 Well Fluid changed to Gas
2009-03-19 Well Mode changed to Abandoned Zone
2009-03-20 Well Log Performed
2009-03-21 Perforation Treatment Performed - Jet Perforation
2009-03-21 Well Log Performed
2009-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-23 Perforation Treatment Performed - Jet Perforation
2009-03-23 Perforation Treatment Performed - Remedial Casing
2009-03-23 Well Log Performed
2009-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-23 Well Log Performed
2011-03-24 Perforation Treatment Performed - Jet Perforation
2011-03-25 Perforation Treatment Performed - Jet Perforation
2011-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-26 Perforation Treatment Performed - Cement Plug
2011-03-26 Perforation Treatment Performed - Remedial Casing
2011-03-27 Perforation Treatment Performed - Jet Perforation
2011-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-28 Perforation Treatment Performed - Remedial Casing
2011-03-28 Well Log Performed
2011-03-30 Well Abandoned
2011-03-30 Well Fluid changed to Gas
2011-03-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-12 1324.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-06 Perforation 1808.50 1812.00 13
2008-02-19 Perforation 1800.50 1803.00 13
2008-02-20 Acid Treatment 1798.00 1803.00 0
2009-03-18 Acid Treatment 1798.00 1803.00 0
2009-03-19 Packing Device Capped w/Cement 1622.00 1784.50 0
2009-03-19 Cement Squeeze 1798.00 1803.00 0
2009-03-19 Packing Device Capped w/Cement 1784.50 1806.00 0
2009-03-21 Perforation 604.00 605.00 17
2009-03-23 Remedial Casing Cementing 604.00 605.00 0
2009-03-23 Acid Treatment 604.00 605.00 0
2009-03-23 Packing Device Capped w/Cement 590.00 600.00 0
2000-02-06 Acid Treatment 1808.50 1812.00 0
2009-03-23 Perforation 465.00 466.00 20
2009-03-24 Acid Treatment 465.00 466.00 0
2011-03-24 Perforation 391.00 392.00 13
2011-03-25 Perforation 441.00 442.00 20
2011-03-26 Acid Treatment 391.00 392.00 0
2011-03-26 Remedial Casing Cementing 391.00 392.00 0
2011-03-26 Cement Plug 421.60 470.20 0
2011-03-27 Perforation 345.00 346.00 13
2011-03-28 Acid Treatment 345.00 346.00 0
2011-03-28 Remedial Casing Cementing 345.00 346.00 0
2000-02-10 Perforation 1671.00 1676.00 13
2011-03-28 Packing Device Capped w/Cement 335.00 343.00 0
2000-02-10 Perforation 1680.50 1683.00 13
2000-02-10 Perforation 1688.00 1690.50 13
2000-02-10 Acid Treatment 1671.00 1690.50 0
2000-02-12 Cement Squeeze 1653.00 1690.50 0
2000-02-15 Cement Squeeze 1639.90 1690.50 0
2008-02-19 Perforation 1798.00 1799.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5278 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-01-26 Lost Circulation 1836.00 1927.00

For data sources see[7]

References