X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206080315020

Well Details

Well ID: 1206080315020
Loading map...
Location: 02/15-03-120-08W6/0
Location Alias: 02/15-03-20-08 W6M
Location Alias 2: 02/15-03-120-08 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: ACL AMIGO (102) 15-3-120-8
Operator Name: Paramount Resources Ltd.
License Number: 0252317
License Date: 2001-03-01
License Status: Abandoned
Spud Date: 2001-03-13
Final Drill Date: 2001-04-07
Well Total Depth: 1953.00 m
Surface Hole Latitude: 59.398108
Surface Hole Longitude: -119.278378

For data sources see[1][2]

Well History

Date Event
2001-03-01 Obtained License
2001-03-15 Surface Casing Operation Performed
2001-03-18 Direction Drilling Operation Performed - Deviate
2001-03-24 Blow Occurred
2001-03-25 Lost Circulation Occurred
2001-03-29 Well Log Performed
2001-03-31 Production Casing Operation Performed
2001-04-02 Kick Occurred
2001-04-02 Lost Circulation Occurred
2001-04-05 Well Log Performed
2001-04-07 Finished Drilling
2001-04-07 Lost Circulation Occurred
2001-04-07 Perforation Treatment Performed - Open-Hole Completion
2001-04-10 Well Log Performed
2001-04-11 Rig Released
2001-04-11 Well Log Performed
2001-04-11 Well Mode changed to Drilled and Cased
2001-08-29 Well Log Performed
2002-02-03 Liner Casing Operation Performed
2002-02-03 Perforation Treatment Performed - Cement Squeeze
2002-02-15 Well Log Performed
2002-02-16 Well Log Performed
2002-02-18 Well Log Performed
2002-03-01 Well Log Performed
2002-03-02 Perforation Treatment Performed - Open-Hole Completion
2002-03-05 Well Log Performed
2002-06-01 Well Began Injection
2002-06-01 Well Fluid changed to Water
2002-06-01 Well Type changed to Injection
2005-06-17 Well Log Performed
2005-06-18 Perforation Treatment Performed - Jet Perforation
2005-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-24 Well Log Performed
2005-06-25 Perforation Treatment Performed - Jet Perforation
2005-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-27 Well Log Performed
2005-07-04 Well Log Performed
2005-07-05 Well Log Performed
2005-07-06 Perforation Treatment Performed - Jet Perforation
2005-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-01 Well Fluid changed to Water
2009-11-01 Well Mode changed to Suspended
2009-11-01 Well Type changed to Injection
2011-04-01 Well Fluid changed to Water
2011-04-01 Well Type changed to Disposal
2011-04-02 Well Fluid changed to Water
2011-04-02 Well Mode changed to Suspended
2011-04-02 Well Type changed to Disposal
2013-01-31 Perforation Treatment Performed - Cement Plug
2013-01-31 Plug Back Performed
2013-01-31 Well Fluid changed to Water
2013-01-31 Well Mode changed to Abandoned Zone
2013-01-31 Well Type changed to Disposal
2013-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-01 Plug Back Performed
2013-02-02 Well Log Performed
2013-02-03 Perforation Treatment Performed - Jet Perforation
2013-02-03 Well Log Performed
2013-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-05 Perforation Treatment Performed - Remedial Casing
2013-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-06 Perforation Treatment Performed - Jet Perforation
2013-02-06 Well Log Performed
2013-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-08 Perforation Treatment Performed - Remedial Casing
2013-02-09 Perforation Treatment Performed - Jet Perforation
2013-02-09 Well Log Performed
2013-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-12 Perforation Treatment Performed - Remedial Casing
2013-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-03-18 926.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-04-07 Open Hole/Barefoot Completion 1786.00 1953.00 0
2013-01-31 Cement Plug 1847.00 1909.40 0
2013-02-01 Packing Device Capped w/Cement 1708.30 1847.00 0
2013-02-03 Perforation 578.00 579.00 17
2013-02-04 Acid Treatment 578.00 579.00 0
2013-02-05 Remedial Casing Cementing 578.00 579.00 0
2013-02-06 Acid Treatment 510.00 511.00 0
2013-02-06 Packing Device Capped w/Cement 560.50 568.50 0
2013-02-06 Perforation 510.00 511.00 99
2013-02-08 Remedial Casing Cementing 510.00 511.00 0
2013-02-08 Packing Device Capped w/Cement 496.00 504.00 0
2002-02-03 Cement Squeeze 1786.00 1953.00 0
2013-02-09 Perforation 410.00 411.00 99
2013-02-10 Acid Treatment 410.00 411.00 0
2013-02-12 Remedial Casing Cementing 410.00 411.00 0
2013-02-14 Packing Device Capped w/Cement 399.50 407.50 0
2002-03-02 Open Hole/Barefoot Completion 1900.00 1909.40 0
2005-06-18 Perforation 1786.50 1788.50 13
2005-06-23 Acid Treatment 1786.50 1788.50 0
2005-06-25 Perforation 1789.00 1791.00 13
2005-06-26 Acid Treatment 1789.00 1791.00 0
2005-07-06 Perforation 1860.50 1862.50 13
2005-07-07 Acid Treatment 1860.50 1862.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-03-24 Blow 1660.00 1660.00
2001-03-25 Lost Circulation 1660.00 1729.00
2001-04-02 Lost Circulation 1871.00 1871.00
2001-04-02 Kick 1871.00 1871.00
2001-04-07 Lost Circulation 1872.00 1953.00
2013-02-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References