X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186111210000

Well Details

Well ID: 1186111210000
Loading map...
Location: 00/10-12-118-11W6/0
Location Alias: 00/10-12-18-11 W6M
Location Alias 2: 00/10-12-118-11 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 11
Section: 12
County/Municipality: Mackenzie County
Well Name: ENCO SHEKILIE 10-12-118-11
Operator Name: Paramount Resources Ltd.
License Number: 0067952
License Date: 1978-01-18
License Status: Abandoned
Spud Date: 1978-02-02
Final Drill Date: 1978-03-02
Well Total Depth: 1976.60 m
Surface Hole Latitude: 59.234635
Surface Hole Longitude: -119.720319

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-01-18 Obtained License
1978-02-16 Lost Circulation Occurred
1978-02-17 Well Log Performed
1978-02-18 Lost Circulation Occurred
1978-02-18 Production Casing Operation Performed
1978-02-21 Lost Circulation Occurred
1978-02-25 Lost Circulation Occurred
1978-03-02 Finished Drilling
1978-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-16 Perforation Treatment Performed - Jet Perforation
1978-03-27 Well Mode changed to Drilled and Cased
1988-03-05 Well Log Performed
1988-03-28 Perforation Treatment Performed - Cement Squeeze
1988-03-30 Perforation Treatment Performed - Open-Hole Completion
1988-04-02 Perforation Treatment Performed - Cement Plug
1988-04-04 Perforation Treatment Performed - Open-Hole Completion
1988-12-14 Perforation Treatment Performed - Jet Perforation
1988-12-15 Well Log Performed
1988-12-18 Well Log Performed
1988-12-19 Perforation Treatment Performed - Cement Squeeze
1988-12-31 Perforation Treatment Performed - Open-Hole Completion
1989-01-04 Perforation Treatment Performed - Cement Squeeze
1989-01-06 Perforation Treatment Performed - Open-Hole Completion
1989-01-09 Well Log Performed
1989-01-10 Perforation Treatment Performed - Jet Perforation
1989-01-10 Well Log Performed
1989-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-11 Perforation Treatment Performed - Open-Hole Completion
1989-01-12 Well Log Performed
1989-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-20 Well Log Performed
1989-01-21 Perforation Treatment Performed - Jet Perforation
1989-01-21 Well Log Performed
1989-01-22 Perforation Treatment Performed - Jet Perforation
1989-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-25 Perforation Treatment Performed - Jet Perforation
1998-01-25 Perforation Treatment Performed - Remedial Casing
1998-01-26 Perforation Treatment Performed - Jet Perforation
1998-01-27 Perforation Treatment Performed - Jet Perforation
1998-01-27 Perforation Treatment Performed - Remedial Casing
1998-02-02 Perforation Treatment Performed - Remedial Casing
1999-02-25 Well Began Production
1999-02-25 Well Fluid changed to Gas
1999-02-25 Well Mode changed to Flowing
2002-10-01 Well Fluid changed to Gas
2002-10-01 Well Mode changed to Suspended
2005-03-16 Well Log Performed
2005-03-18 Perforation Treatment Performed - Jet Perforation
2005-03-20 Well Log Performed
2005-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-21 Plug Back Performed
2005-03-21 Well Fluid changed to Gas
2005-03-21 Well Mode changed to Abandoned Zone
2010-02-14 Perforation Treatment Performed - Cement Squeeze
2010-02-14 Plug Back Performed
2010-02-19 Perforation Treatment Performed - Jet Perforation
2010-03-09 Well Log Performed
2010-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-10 Plug Back Performed
2010-03-10 Well Log Performed
2010-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-13 Well Abandoned
2010-03-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-16 Perforation 1647.40 1648.70 7
1988-04-02 Cement Plug 1699.10 1743.00 0
1988-04-04 Open Hole/Barefoot Completion 1681.20 1699.10 0
1988-12-14 Perforation 1647.40 1675.10 7
1988-12-19 Cement Squeeze 1647.40 1675.10 0
1988-12-31 Open Hole/Barefoot Completion 1681.20 1719.60 0
1989-01-04 Cement Squeeze 1697.20 1719.60 0
1989-01-06 Open Hole/Barefoot Completion 1681.20 1697.20 0
1989-01-10 Perforation 1688.50 1693.10 13
1989-01-11 Packing Device Capped w/Cement 1693.00 1697.00 0
1989-01-11 Open Hole/Barefoot Completion 1681.20 1693.00 0
1978-03-16 Perforation 1651.40 1654.80 7
1989-01-13 Acid Treatment 1681.20 1693.00 0
1989-01-20 Packing Device Capped w/Cement 1678.50 1680.50 0
1989-01-21 Perforation 1670.20 1675.10 13
1989-01-21 Perforation 1667.20 1668.70 13
1989-01-22 Perforation 1663.80 1666.30 13
1989-01-22 Perforation 1656.50 1660.50 13
1989-01-22 Perforation 1651.30 1654.70 13
1989-01-22 Perforation 1647.40 1648.60 13
1989-01-26 Acid Treatment 1647.40 1675.10 0
1998-01-25 Perforation 710.00 711.00 13
1978-03-16 Perforation 1656.60 1660.60 7
1998-01-25 Remedial Casing Cementing 710.00 711.00 0
1998-01-26 Perforation 549.50 550.50 13
1998-01-27 Perforation 289.50 290.50 13
1998-01-27 Remedial Casing Cementing 289.50 290.50 0
1998-02-02 Remedial Casing Cementing 549.50 550.50 0
2005-03-18 Perforation 525.50 527.50 13
2005-03-21 Packing Device Capped w/Cement 1613.90 1614.00 0
2010-02-14 Cement Squeeze 525.50 527.50 0
2010-02-19 Perforation 1647.40 1675.10 7
2010-03-10 Packing Device Capped w/Cement 1632.00 1640.00 0
1978-03-16 Perforation 1663.90 1666.30 7
2010-03-11 Packing Device Capped w/Cement 509.00 517.00 0
2010-03-11 Packing Device Capped w/Cement 272.00 280.00 0
1978-03-16 Perforation 1667.30 1668.80 7
1978-03-16 Perforation 1670.30 1675.20 7
1978-03-16 Acid Treatment 1647.40 1675.20 0
1988-03-28 Cement Squeeze 1647.40 1675.20 0
1988-03-30 Open Hole/Barefoot Completion 1678.80 1743.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1649 0.0 0.0 0.0
2000 4165 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-02-16 Lost Circulation 1665.70 1665.70
1978-02-18 Lost Circulation 1684.00 1684.00
1978-02-21 Lost Circulation 1704.10 1704.10
1978-02-25 Lost Circulation 1776.40 1776.40

For data sources see[6]

References