X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186082611003

Well Details

Well ID: 1186082611003
Loading map...
Location: 00/11-26-118-08W6/3
Location Alias: 00/11-26-18-08 W6M
Location Alias 2: 00/11-26-118-08 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 26
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 11-26-118-8
Operator Name: Paramount Resources Ltd.
License Number: 0074859
License Date: 1979-03-09
License Status: Abandoned
Spud Date: 1979-03-14
Final Drill Date: 1979-04-09
Well Total Depth: 1927.00 m
Surface Hole Latitude: 59.278627
Surface Hole Longitude: -119.242372

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-09 Obtained License
1979-03-30 Lost Circulation Occurred
1979-03-31 Lost Circulation Occurred
1979-04-03 Lost Circulation Occurred
1979-04-04 Drill Stem Test Performed
1979-04-05 Drill Stem Test Performed
1979-04-08 Well Log Performed
1979-04-09 Finished Drilling
1979-04-09 Well Mode changed to Drilled and Cased
1979-04-10 Liner Casing Operation Performed
1980-01-06 Perforation Treatment Performed - Jet Perforation
1994-11-05 Perforation Treatment Performed - Jet Perforation
1994-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-04 Well Log Performed
2003-09-06 Well Log Performed
2003-09-08 Well Log Performed
2003-09-09 Well Log Performed
2003-09-10 Perforation Treatment Performed - Jet Perforation
2003-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-12 Well Log Performed
2004-02-05 Well Began Injection
2004-02-05 Well Fluid changed to Water
2004-02-05 Well Type changed to Disposal
2012-02-24 Well Fluid changed to Water
2012-02-24 Well Mode changed to Suspended
2012-02-24 Well Type changed to Disposal
2013-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-31 Plug Back Performed
2013-03-31 Well Fluid changed to Water
2013-03-31 Well Log Performed
2013-03-31 Well Mode changed to Abandoned Zone
2013-03-31 Well Type changed to Disposal
2013-04-01 Well Log Performed
2013-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-04-02 Perforation Treatment Performed - Jet Perforation
2013-04-02 Well Log Performed
2013-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-04-04 Perforation Treatment Performed - Remedial Casing
2013-04-05 Perforation Treatment Performed - Jet Perforation
2013-04-05 Well Log Performed
2013-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-04-06 Perforation Treatment Performed - Remedial Casing
2013-04-17 Well Abandoned
2013-04-17 Well Fluid changed to Water
2013-04-17 Well Mode changed to Abandoned
2013-04-17 Well Type changed to Disposal
2014-09-21 Well Log Performed
2014-09-27 Perforation Treatment Performed - Jet Perforation
2014-09-27 Well Log Performed
2014-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-30 Perforation Treatment Performed - Remedial Casing
2014-10-01 Well Log Performed
2014-10-02 Well Log Performed
2014-10-03 Perforation Treatment Performed - Jet Perforation
2014-10-03 Well Log Performed
2014-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-04 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-06 Perforation 1760.00 1763.50 7
2013-04-02 Perforation 933.00 934.00 99
2013-04-02 Packing Device Capped w/Cement 921.50 930.00 0
2013-04-02 Perforation 575.00 576.00 99
2013-04-03 Acid Treatment 575.00 576.00 0
2013-04-04 Remedial Casing Cementing 575.00 576.00 0
2013-04-04 Packing Device Capped w/Cement 562.00 572.00 0
2013-04-05 Perforation 489.00 490.00 99
2013-04-06 Acid Treatment 489.00 490.00 0
2013-04-06 Remedial Casing Cementing 489.00 490.00 0
2013-04-06 Packing Device Capped w/Cement 475.00 485.00 0
1994-11-05 Perforation 1752.50 1754.50 13
2014-09-27 Perforation 436.00 437.00 99
2014-09-28 Acid Treatment 436.00 437.00 0
2014-09-29 Acid Treatment 436.00 437.00 0
2014-09-30 Remedial Casing Cementing 436.00 437.00 0
2014-09-30 Packing Device Capped w/Cement 420.00 434.00 0
2014-10-03 Perforation 301.50 302.50 17
2014-10-04 Remedial Casing Cementing 301.50 302.50 0
2014-10-04 Packing Device Capped w/Cement 287.30 299.50 0
1994-11-06 Acid Treatment 1752.50 1754.50 0
2003-09-10 Perforation 1827.00 1829.00 13
2003-09-10 Perforation 1835.00 1837.00 13
2003-09-10 Perforation 1842.00 1848.00 13
2003-09-11 Acid Treatment 1827.00 1848.00 0
2013-03-31 Packing Device Capped w/Cement 1738.50 1748.00 0
2013-04-02 Packing Device Capped w/Cement 1509.50 1518.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-03-30 Lost Circulation 1623.00 1631.00
1979-03-31 Lost Circulation 1635.00 1635.00
1979-04-03 Lost Circulation 1767.00 1767.00
2012-12-20 No Incident Encountered 0.00 0.00
2013-04-17 No Incident Encountered 0.00 0.00
2014-10-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References