If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1186081104002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.23033,"lon":-119.250074,"icon":""}]} |
| Location: 00/04-11-118-08W6/2 | |
| Location Alias: 00/04-11-18-08 W6M | |
| Location Alias 2: 00/04-11-118-08 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 118 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 11 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL SHEKILIE 4-11-118-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0039692 | |
| License Date: 1971-02-08 | |
| License Status: Suspension | |
| Spud Date: 1971-02-13 | |
| Final Drill Date: 1971-03-08 | |
| Well Total Depth: 1828.80 m | |
| Surface Hole Latitude: 59.230330 | |
| Surface Hole Longitude: -119.250074 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1971-02-08 | Obtained License |
| 1971-02-25 | Drill Stem Test Performed |
| 1971-02-28 | Well Log Performed |
| 1971-03-01 | Production Casing Operation Performed |
| 1971-03-01 | Surface Casing Operation Performed |
| 1971-03-05 | Drill Stem Test Performed |
| 1971-03-08 | Finished Drilling |
| 1971-03-08 | Perforation Treatment Performed - Open-Hole Completion |
| 1971-03-08 | Well Mode changed to Drilled and Cased |
| 1971-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1971-03-11 | Perforation Treatment Performed - Open-Hole Completion |
| 1984-09-27 | Well Log Performed |
| 1985-02-09 | Well Log Performed |
| 1985-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-02-10 | Perforation Treatment Performed - Open-Hole Completion |
| 1986-10-17 | Well Log Performed |
| 1986-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-03-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-09-11 | Well Log Performed |
| 2003-10-04 | Liner Casing Operation Performed |
| 2003-10-04 | Perforation Treatment Performed - Cement Squeeze |
| 2003-10-05 | Well Log Performed |
| 2003-10-06 | Well Log Performed |
| 2003-10-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-10-07 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-09 | Well Log Performed |
| 2003-10-11 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-12 | Perforation Treatment Performed - Cement Squeeze |
| 2003-10-18 | Well Log Performed |
| 2003-10-19 | Perforation Treatment Performed - Jet Perforation |
| 2003-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-10-29 | Well Log Performed |
| 2003-10-31 | Well Log Performed |
| 2003-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-11-01 | Perforation Treatment Performed - Jet Perforation |
| 2004-04-02 | Well Began Injection |
| 2004-04-02 | Well Fluid changed to Water |
| 2004-04-02 | Well Type changed to Injection |
| 2012-10-15 | Well Fluid changed to Water |
| 2012-10-15 | Well Mode changed to Suspended |
| 2012-10-15 | Well Type changed to Injection |
| 2014-03-15 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1971-03-08 | Open Hole/Barefoot Completion | 1654.50 | 1828.80 | 0 |
| 2003-10-07 | Acid Treatment | 1778.30 | 1783.30 | 0 |
| 2003-10-11 | Perforation | 1755.00 | 1758.00 | 13 |
| 2003-10-12 | Cement Squeeze | 1755.00 | 1783.30 | 0 |
| 2003-10-19 | Perforation | 1778.30 | 1783.30 | 13 |
| 2003-10-20 | Acid Treatment | 1778.30 | 1783.30 | 0 |
| 2003-11-01 | Perforation | 1702.00 | 1705.00 | 13 |
| 2003-11-01 | Perforation | 1708.70 | 1711.70 | 13 |
| 2003-11-01 | Acid Treatment | 1702.00 | 1711.70 | 0 |
| 1971-03-11 | Packing Device Capped w/Cement | 1737.40 | 1744.70 | 0 |
| 1971-03-11 | Open Hole/Barefoot Completion | 1654.50 | 1737.40 | 0 |
| 1985-02-10 | Packing Device Capped w/Cement | 1691.50 | 1700.80 | 0 |
| 1985-02-10 | Open Hole/Barefoot Completion | 1654.50 | 1691.50 | 0 |
| 1986-10-20 | Acid Treatment | 1654.50 | 1688.30 | 0 |
| 1999-03-29 | Acid Treatment | 1654.50 | 1688.30 | 0 |
| 2003-10-04 | Cement Squeeze | 1654.50 | 1691.50 | 0 |
| 2003-10-07 | Perforation | 1778.30 | 1783.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
| 2007 | 0 | 0.0 | 0.0 | 0.0 |
| 2008 | 0 | 0.0 | 0.0 | 0.0 |
| 2009 | 0 | 0.0 | 0.0 | 0.0 |
| 2010 | 0 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-03-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]