X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186080913020

Well Details

Well ID: 1186080913020
Loading map...
Location: 02/13-09-118-08W6/0
Location Alias: 02/13-09-18-08 W6M
Location Alias 2: 02/13-09-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 09
County/Municipality: Mackenzie County
Well Name: CLEARVIEW SHEKILIE 13-9-118-8
Operator Name: Clearview Resources Ltd.
License Number: 0104469
License Date: 1983-12-01
License Status: Abandoned
Spud Date: 1983-12-11
Final Drill Date: 1984-01-09
Well Total Depth: 1908.00 m
Surface Hole Latitude: 59.238416
Surface Hole Longitude: -119.308953

For data sources see[1][2]

Well History

Date Event
1983-12-01 Obtained License
1983-12-30 Well Log Performed
1984-01-01 Well Log Performed
1984-01-05 Lost Circulation Occurred
1984-01-09 Finished Drilling
1984-01-09 Well Log Performed
1984-01-09 Well Mode changed to Drilled and Cased
1984-01-10 Drill Stem Test Performed
1984-01-11 Drill Stem Test Performed
1984-01-13 Intermediate Casing Operation Performed
1984-01-13 Liner Casing Operation Performed
1984-01-13 Lost Circulation Occurred
1984-01-31 Well Log Performed
1984-02-01 Perforation Treatment Performed - Jet Perforation
1984-02-02 Perforation Treatment Performed - Cement Squeeze
1984-02-05 Perforation Treatment Performed - Jet Perforation
1984-02-17 Well Began Production
1984-02-17 Well Fluid changed to Crude Oil
1984-02-17 Well Mode changed to Pumping
1985-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-01 Well Fluid changed to Crude Oil
1987-04-01 Well Mode changed to Suspended
1987-09-12 Perforation Treatment Performed - Cement Squeeze
1987-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-14 Perforation Treatment Performed - Jet Perforation
1987-09-14 Well Log Performed
2010-01-28 Perforation Treatment Performed - Jet Perforation
2010-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-09 Plug Back Performed
2010-03-09 Well Fluid changed to Crude Oil
2010-03-09 Well Mode changed to Abandoned Zone
2017-02-22 Perforation Treatment Performed - Jet Perforation
2017-03-13 Perforation Treatment Performed - Remedial Casing
2017-03-16 Perforation Treatment Performed - Jet Perforation
2017-03-17 Perforation Treatment Performed - Remedial Casing
2017-10-03 Well Abandoned
2017-10-03 Well Fluid changed to Crude Oil
2017-10-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-01 Perforation 1824.50 1825.00 13
2010-01-28 Perforation 1771.00 1774.00 17
2010-01-28 Perforation 1781.00 1784.00 17
2010-01-28 Perforation 1791.00 1794.00 17
2010-01-31 Acid Treatment 1791.00 1794.00 0
2010-01-31 Acid Treatment 1781.00 1784.00 0
2010-01-31 Acid Treatment 1771.00 1774.00 0
2010-02-04 Acid Treatment 1747.00 1752.00 0
2010-03-09 Packing Device Capped w/Cement 1731.00 1739.00 0
2010-03-09 Packing Device Capped w/Cement 1485.00 1493.00 0
2017-02-22 Perforation 923.00 924.00 17
1984-02-01 Perforation 1832.00 1832.50 13
2017-03-13 Remedial Casing Cementing 923.00 924.00 0
2017-03-16 Perforation 563.00 564.00 17
2017-03-17 Remedial Casing Cementing 563.00 564.00 0
1984-02-02 Cement Squeeze 1824.50 1832.50 0
1984-02-05 Perforation 1820.00 1824.50 13
1985-09-24 Acid Treatment 1820.00 1824.50 0
1987-09-12 Cement Squeeze 1820.00 1824.50 0
1987-09-14 Perforation 1809.00 1813.00 13
1987-09-14 Acid Treatment 1809.00 1813.00 0
2010-01-28 Perforation 1747.00 1752.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 4893 0.0 0.0 0.0
1985 8114 0.0 0.0 0.0
1986 6834 0.0 0.0 0.0
1987 390 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-01-05 Lost Circulation 1614.20 1718.00
1984-01-13 Lost Circulation 1908.00 1908.00
2017-03-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References