X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186080809000

Well Details

Well ID: 1186080809000
Loading map...
Location: 00/09-08-118-08W6/0
Location Alias: 00/09-08-18-08 W6M
Location Alias 2: 00/09-08-118-08 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 08
Section: 08
County/Municipality: Mackenzie County
Well Name: CLEARVIEW SHEKILIE 9-8-118-8
Operator Name: Clearview Resources Ltd.
License Number: 0086244
License Date: 1980-10-09
License Status: Abandoned
Spud Date: 1980-10-12
Final Drill Date: 1980-12-01
Well Total Depth: 1911.00 m
Surface Hole Latitude: 59.235149
Surface Hole Longitude: -119.316131

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-09 Obtained License
1980-10-12 Direction Drilling Operation Performed - 98
1980-10-28 Lost Circulation Occurred
1980-11-22 Lost Circulation Occurred
1980-12-01 Finished Drilling
1980-12-01 Well Mode changed to Drilled and Cased
1980-12-07 Liner Casing Operation Performed
1981-01-03 Perforation Treatment Performed - Jet Perforation
1981-01-15 Well Began Production
1981-01-15 Well Fluid changed to Crude Oil
1981-01-15 Well Mode changed to Flowing
1984-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-23 Perforation Treatment Performed - Jet Perforation
1984-03-23 Well Log Performed
1984-03-27 Well Log Performed
1984-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-01 Well Fluid changed to Crude Oil
1984-10-01 Well Mode changed to Suspended
1990-08-04 Well Log Performed
1990-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-05 Plug Back Performed
1990-08-05 Well Fluid changed to Crude Oil
1990-08-05 Well Mode changed to Abandoned Zone
1990-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-08 Well Log Performed
2000-11-10 Perforation Treatment Performed - Cement Squeeze
2000-11-14 Perforation Treatment Performed - Jet Perforation
2000-11-14 Well Log Performed
2000-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-09 Perforation Treatment Performed - Jet Perforation
2003-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-12 Perforation Treatment Performed - Cement Squeeze
2004-01-12 Plug Back Performed
2004-01-23 Perforation Treatment Performed - Cement Squeeze
2004-01-30 Well Log Performed
2004-01-31 Perforation Treatment Performed - Jet Perforation
2004-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-05 Perforation Treatment Performed - Jet Perforation
2010-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-24 Plug Back Performed
2017-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-26 Plug Back Performed
2017-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-28 Plug Back Performed
2017-10-03 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-10-12 707.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-03 Perforation 1804.00 1811.00 13
2000-11-15 Acid Treatment 1524.50 1536.00 0
2003-09-09 Perforation 767.00 772.00 13
2003-09-11 Acid Treatment 767.00 772.00 0
2004-01-12 Cement Squeeze 767.00 772.00 0
2004-01-23 Cement Squeeze 1524.50 1536.00 0
2004-01-31 Perforation 1525.00 1530.00 13
2004-02-01 Acid Treatment 1525.00 1530.00 0
2010-03-05 Perforation 1750.00 1760.00 17
2010-03-05 Perforation 1717.00 1723.00 17
2010-03-06 Acid Treatment 1750.00 1760.00 0
1984-03-22 Packing Device Capped w/Cement 1798.00 1802.00 0
2010-03-06 Acid Treatment 1717.00 1723.00 0
2017-02-24 Packing Device Capped w/Cement 1694.20 1702.20 0
2017-02-26 Packing Device Capped w/Cement 1510.50 1518.50 0
2017-02-28 Packing Device Capped w/Cement 1477.00 1485.00 0
2017-02-28 Packing Device Capped w/Cement 757.00 765.00 0
1984-03-23 Perforation 1772.00 1781.00 13
1984-03-28 Acid Treatment 1772.00 1781.00 0
1990-08-05 Packing Device Capped w/Cement 1712.00 1720.00 0
1990-08-06 Packing Device Capped w/Cement 1477.00 1485.00 0
2000-11-10 Cement Squeeze 1489.90 1540.00 0
2000-11-14 Perforation 1533.00 1536.00 13
2000-11-14 Perforation 1524.50 1526.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 6379 0.0 0.0 0.0
1982 7122 0.0 0.0 0.0
1983 4024 0.0 0.0 0.0
1984 1457 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-10-28 Lost Circulation 1529.00 1548.00
1980-11-22 Lost Circulation 1818.00 1911.00
2017-02-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References