X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186063010000

Well Details

Well ID: 1186063010000
Loading map...
Location: 00/10-30-118-06W6/0
Location Alias: 00/10-30-18-06 W6M
Location Alias 2: 00/10-30-118-06 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 06
Section: 30
County/Municipality: Mackenzie County
Well Name: ACL ET AL SHEKILIE 10-30-118-6
Operator Name: Paramount Resources Ltd.
License Number: 0113857
License Date: 1985-03-08
License Status: Abandoned
Spud Date: 1985-03-15
Final Drill Date: 1985-04-11
Well Total Depth: 1904.00 m
Surface Hole Latitude: 59.278572
Surface Hole Longitude: -119.007595

For data sources see[1][2]

Well History

Date Event
1985-03-08 Obtained License
1985-03-16 Surface Casing Operation Performed
1985-03-19 Direction Drilling Operation Performed - Deviate
1985-03-30 Intermediate Casing Operation Performed
1985-03-30 Well Log Performed
1985-04-11 Finished Drilling
1985-04-11 Well Log Performed
1985-04-11 Well Mode changed to Drilled and Cased
1985-04-12 Well Log Performed
1985-04-14 Liner Casing Operation Performed
1985-04-14 Rig Released
1985-04-30 Well Log Performed
1985-05-02 Perforation Treatment Performed - Jet Perforation
1985-05-02 Well Began Production
1985-05-02 Well Fluid changed to Crude Oil
1985-05-02 Well Mode changed to Flowing
1985-06-13 Well Log Performed
1996-11-23 Well Log Performed
1996-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-24 Plug Back Performed
1996-11-24 Well Fluid changed to Crude Oil
1996-11-24 Well Log Performed
1996-11-24 Well Mode changed to Abandoned Zone
1996-11-25 Perforation Treatment Performed - Jet Perforation
1996-11-25 Well Log Performed
1996-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-27 Plug Back Performed
2007-02-11 Well Log Performed
2007-03-02 Perforation Treatment Performed - Jet Perforation
2007-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-04 Perforation Treatment Performed - Cement Plug
2007-03-04 Perforation Treatment Performed - Jet Perforation
2007-03-04 Perforation Treatment Performed - Remedial Casing
2007-03-04 Well Log Performed
2007-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-06 Perforation Treatment Performed - Jet Perforation
2007-03-06 Perforation Treatment Performed - Remedial Casing
2007-03-06 Well Log Performed
2015-03-08 Well Log Performed
2015-03-09 Well Log Performed
2015-03-10 Perforation Treatment Performed - Jet Perforation
2015-03-10 Well Log Performed
2015-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-12 Perforation Treatment Performed - Remedial Casing
2015-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-13 Well Log Performed
2015-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-23 Well Log Performed
2015-03-24 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-03-19 631.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-02 Perforation 1853.00 1855.00 13
2007-03-02 Perforation 562.00 563.00 14
2007-03-04 Cement Plug 327.00 558.00 0
2007-03-04 Perforation 326.00 327.00 14
2007-03-04 Remedial Casing Cementing 326.00 327.00 0
2007-03-04 Packing Device Capped w/Cement 312.00 323.00 0
2007-03-06 Perforation 305.00 306.00 17
2007-03-06 Remedial Casing Cementing 305.00 306.00 0
2007-03-06 Packing Device Capped w/Cement 283.00 293.00 0
2015-03-10 Perforation 569.00 570.00 99
2015-03-11 Acid Treatment 569.00 570.00 0
1985-05-02 Perforation 1856.00 1858.00 13
2015-03-12 Remedial Casing Cementing 569.00 570.00 0
2015-03-12 Packing Device Capped w/Cement 548.80 558.80 0
2015-03-13 Packing Device Capped w/Cement 313.00 321.00 0
2015-03-13 Packing Device Capped w/Cement 290.00 298.00 0
2015-03-23 Packing Device Capped w/Cement 36.00 44.00 0
1996-11-24 Packing Device Capped w/Cement 1837.00 1845.00 0
1996-11-25 Perforation 1641.00 1642.00 13
1996-11-25 Perforation 1643.50 1646.00 13
1996-11-25 Perforation 1647.00 1649.50 13
1996-11-26 Acid Treatment 1641.00 1649.50 0
1999-02-22 Acid Treatment 1641.00 1649.50 0
2003-03-27 Packing Device Capped w/Cement 1614.50 1622.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 5045 0.0 0.0 0.0
1986 8062 0.0 0.0 0.0
1987 8123 0.0 0.0 0.0
1988 8431 0.0 0.0 0.0
1989 8154 0.0 0.0 0.0
1990 8467 0.0 0.0 0.0
1991 1519 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References