X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186062910003

Well Details

Well ID: 1186062910003
Loading map...
Location: 00/10-29-118-06W6/3
Location Alias: 00/10-29-18-06 W6M
Location Alias 2: 00/10-29-118-06 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 06
Section: 29
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 10-29-118-6
Operator Name: Paramount Resources Ltd.
License Number: 0100133
License Date: 1983-01-11
License Status: Abandoned
Spud Date: 1983-01-19
Final Drill Date: 1983-02-19
Well Total Depth: 1935.00 m
Surface Hole Latitude: 59.279665
Surface Hole Longitude: -118.976768

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-11 Obtained License
1983-01-19 Lost Circulation Occurred
1983-02-06 Lost Circulation Occurred
1983-02-07 Drill Stem Test Performed
1983-02-14 Kick Occurred
1983-02-19 Finished Drilling
1983-02-19 Well Mode changed to Drilled and Cased
1983-02-20 Kick Occurred
1983-02-20 Well Log Performed
1983-02-21 Drill Stem Test Performed
1983-02-21 Kick Occurred
1983-02-22 Drill Stem Test Performed
1983-02-23 Water Flow Occurred
1983-02-24 Drill Stem Test Performed
1983-02-25 Liner Casing Operation Performed
1983-10-21 Perforation Treatment Performed - Jet Perforation
1983-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-06 Plug Back Performed
1996-10-01 Well Log Performed
1996-10-02 Perforation Treatment Performed - Jet Perforation
1996-10-04 Well Log Performed
1996-10-05 Perforation Treatment Performed - Jet Perforation
1996-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-10 Perforation Treatment Performed - Cement Squeeze
1996-10-10 Well Log Performed
1996-10-11 Perforation Treatment Performed - Jet Perforation
1996-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-14 Perforation Treatment Performed - Cement Squeeze
2010-03-14 Plug Back Performed
2010-03-26 Well Log Performed
2010-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-27 Perforation Treatment Performed - Jet Perforation
2010-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-24 Well Began Production
2010-05-24 Well Fluid changed to Crude Oil
2010-05-24 Well Mode changed to Pumping
2011-11-15 Well Fluid changed to Crude Oil
2011-11-15 Well Mode changed to Suspended
2013-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-25 Plug Back Performed
2013-11-25 Well Fluid changed to Crude Oil
2013-11-25 Well Mode changed to Abandoned Zone
2013-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-26 Well Log Performed
2013-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-27 Well Log Performed
2013-11-28 Perforation Treatment Performed - Jet Perforation
2013-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-30 Perforation Treatment Performed - Remedial Casing
2013-12-01 Perforation Treatment Performed - Jet Perforation
2013-12-01 Well Log Performed
2013-12-02 Perforation Treatment Performed - Jet Perforation
2013-12-02 Well Log Performed
2013-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-04 Perforation Treatment Performed - Remedial Casing
2013-12-08 Well Abandoned
2013-12-08 Well Fluid changed to Crude Oil
2013-12-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-21 Perforation 1847.00 1852.00 13
1996-10-10 Cement Squeeze 1670.00 1675.00 0
1996-10-11 Perforation 1631.00 1632.00 13
1996-10-11 Perforation 1633.50 1634.50 13
1996-10-11 Perforation 1639.50 1640.50 13
1996-10-11 Perforation 1643.00 1645.00 13
1996-10-11 Perforation 1646.00 1647.00 13
1996-10-14 Acid Treatment 1631.00 1647.00 0
2010-03-14 Cement Squeeze 1631.00 1647.00 0
2010-03-27 Perforation 1766.00 1768.00 13
2010-03-27 Perforation 1780.00 1781.50 13
1983-10-25 Acid Treatment 1847.00 1852.00 0
2010-03-27 Perforation 1785.50 1787.50 13
2010-03-27 Perforation 1791.00 1793.00 13
2010-03-27 Perforation 1797.70 1799.70 13
2010-03-27 Perforation 1803.60 1805.60 13
2010-03-27 Acid Treatment 1785.50 1805.60 0
2010-03-28 Acid Treatment 1766.00 1768.00 0
2013-11-25 Packing Device Capped w/Cement 1754.00 1762.00 0
2013-11-26 Packing Device Capped w/Cement 1652.00 1660.00 0
2013-11-27 Packing Device Capped w/Cement 1619.00 1627.00 0
2013-11-28 Perforation 572.00 573.00 99
1996-04-06 Packing Device Capped w/Cement 1834.00 1842.00 0
2013-11-29 Acid Treatment 572.00 573.00 0
2013-11-30 Packing Device Capped w/Cement 557.00 568.60 0
2013-11-30 Remedial Casing Cementing 572.00 573.00 0
2013-12-01 Perforation 529.00 530.00 17
2013-12-02 Perforation 529.00 530.00 99
2013-12-04 Remedial Casing Cementing 529.00 530.00 0
2013-12-04 Packing Device Capped w/Cement 511.50 525.50 0
1996-10-02 Perforation 1670.00 1675.00 13
1996-10-05 Perforation 1663.00 1666.00 13
1996-10-05 Perforation 1660.00 1668.00 13
1996-10-08 Acid Treatment 1660.00 1668.00 0
1996-10-08 Acid Treatment 1670.00 1675.00 0
1996-10-10 Cement Squeeze 1660.00 1668.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3194 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-01-19 Lost Circulation 80.00 80.00
1983-02-06 Lost Circulation 1661.00 1661.00
1983-02-14 Kick 1802.00 1802.00
1983-02-20 Kick 1935.00 1935.00
1983-02-21 Kick 1935.00 1935.00
1983-02-23 Water Flow 1935.00 0.00
2013-12-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References