X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186051107003

Well Details

Well ID: 1186051107003
Loading map...
Location: 00/07-11-118-05W6/3
Location Alias: 00/07-11-18-05 W6M
Location Alias 2: 00/07-11-118-05 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 05
Section: 11
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 7-11-118-5
Operator Name: Paramount Resources Ltd.
License Number: 0032014
License Date: 1967-03-29
License Status: Abandoned
Spud Date: 1967-03-31
Final Drill Date: 1967-05-02
Well Total Depth: 1798.60 m
Surface Hole Latitude: 59.231124
Surface Hole Longitude: -118.719505

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-03-29 Obtained License
1967-04-10 Drill Stem Test Performed
1967-04-13 Drill Stem Test Performed
1967-04-17 Drill Stem Test Performed
1967-04-18 Well Log Performed
1967-04-23 Drill Stem Test Performed
1967-04-26 Drill Stem Test Performed
1967-05-02 Finished Drilling
1967-05-02 Well Mode changed to Drilled and Cased
1967-05-03 Well Log Performed
1967-05-04 Liner Casing Operation Performed
1967-05-06 Perforation Treatment Performed - Jet Perforation
1967-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-06 Perforation Treatment Performed - Cement Squeeze
1973-07-10 Perforation Treatment Performed - Jet Perforation
1973-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-03 Perforation Treatment Performed - Cement Plug
1988-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-04 Plug Back Performed
1988-11-05 Well Log Performed
1988-11-29 Perforation Treatment Performed - Jet Perforation
1988-12-02 Well Log Performed
1988-12-04 Perforation Treatment Performed - Jet Perforation
1988-12-04 Well Log Performed
1988-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-08 Perforation Treatment Performed - Jet Perforation
1996-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-11-10 Well Log Performed
1996-11-11 Perforation Treatment Performed - Jet Perforation
1996-11-15 Well Log Performed
1996-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-09 Well Log Performed
1997-11-12 Well Log Performed
1997-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-13 Plug Back Performed
1997-11-13 Well Began Production
1997-11-13 Well Fluid changed to Gas
1997-11-13 Well Log Performed
1997-11-13 Well Mode changed to Flowing
1997-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-02 Well Log Performed
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Suspended
2003-03-14 Well Log Performed
2003-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-16 Plug Back Performed
2003-03-16 Well Fluid changed to Gas
2003-03-16 Well Mode changed to Abandoned Zone
2003-04-10 Well Abandoned
2003-04-10 Well Fluid changed to Gas
2003-04-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-05-06 Perforation 1568.20 1571.90 7
1988-12-05 Acid Treatment 1557.50 1562.40 0
1996-02-08 Perforation 1451.50 1452.70 13
1996-02-08 Perforation 1449.60 1450.20 13
1996-02-09 Perforation 1447.50 1448.50 13
1996-02-09 Perforation 1442.90 1444.10 13
1996-02-09 Perforation 1439.90 1441.70 13
1996-02-09 Perforation 1436.80 1438.00 13
1996-02-09 Acid Treatment 1436.80 1452.70 0
1996-11-11 Perforation 1538.00 1542.90 13
1996-11-11 Perforation 1530.00 1532.50 13
1967-08-27 Acid Treatment 1568.20 1571.90 0
1996-11-16 Packing Device Capped w/Cement 1519.50 1527.50 0
1997-11-13 Packing Device Capped w/Cement 1424.50 1432.50 0
1997-11-14 Acid Treatment 1374.60 1378.30 0
2003-03-16 Packing Device Capped w/Cement 1354.00 1362.00 0
1973-07-06 Cement Squeeze 1568.20 1571.90 0
1973-07-10 Perforation 1558.70 1562.40 7
1973-07-11 Acid Treatment 1558.70 1562.40 0
1988-11-03 Cement Plug 1558.00 1563.00 0
1988-11-04 Packing Device Capped w/Cement 1527.00 1535.00 0
1988-11-29 Perforation 1558.70 1562.40 7
1988-12-04 Perforation 1557.50 1559.50 19

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 301 0.0 0.0 0.0
1998 1307 0.0 0.0 0.0
1999 17 0.0 0.0 0.0

For data sources see[5]

References