X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186041610000

Well Details

Well ID: 1186041610000
Loading map...
Location: 00/10-16-118-04W6/0
Location Alias: 00/10-16-18-04 W6M
Location Alias 2: 00/10-16-118-04 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 16
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 10-16-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0179229
License Date: 1995-07-12
License Status: Suspension
Spud Date: 1995-07-13
Final Drill Date: 1995-07-29
Well Total Depth: 1542.00 m
Surface Hole Latitude: 59.249052
Surface Hole Longitude: -118.611474

For data sources see[1][2]

Well History

Date Event
1995-07-12 Obtained License
1995-07-15 Surface Casing Operation Performed
1995-07-21 Direction Drilling Operation Performed - Deviate
1995-07-26 Drill Stem Test Performed
1995-07-26 Well Log Performed
1995-07-28 Production Casing Operation Performed
1995-07-29 Finished Drilling
1995-07-29 Perforation Treatment Performed - Open-Hole Completion
1995-07-29 Well Log Performed
1995-07-29 Well Mode changed to Drilled and Cased
1995-07-30 Rig Released
1995-08-06 Well Began Production
1995-08-06 Well Fluid changed to Crude Oil
1995-08-06 Well Mode changed to Flowing
1996-02-25 Well Fluid changed to Crude Oil
1996-02-25 Well Mode changed to Pumping
2002-01-30 Well Fluid changed to Crude Oil
2002-01-30 Well Mode changed to Suspended
2010-03-12 Well Log Performed
2010-03-13 Well Log Performed
2010-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-14 Perforation Treatment Performed - Jet Perforation
2010-03-14 Plug Back Performed
2010-03-14 Well Fluid changed to Crude Oil
2010-03-14 Well Mode changed to Abandoned Zone
2010-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-21 1341.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-29 Open Hole/Barefoot Completion 1509.00 1542.00 0
2010-03-14 Packing Device Capped w/Cement 1492.00 1500.00 0
2010-03-14 Perforation 1419.00 1420.00 17
2010-03-14 Perforation 1421.00 1423.00 17
2010-03-14 Perforation 1424.00 1425.00 17
2010-03-14 Perforation 1427.00 1429.00 17
2010-03-15 Acid Treatment 1419.00 1429.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3234 0.0 0.0 0.0
1996 7886 0.0 0.0 0.0
1997 8165 0.0 0.0 0.0
1998 8431 0.0 0.0 0.0
1999 8687 0.0 0.0 0.0
2000 6196 0.0 0.0 0.0
2001 8606 0.0 0.0 0.0
2002 273 0.0 0.0 0.0

For data sources see[6]

References