X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186041609002

Well Details

Well ID: 1186041609002
Loading map...
Location: 00/09-16-118-04W6/2
Location Alias: 00/09-16-18-04 W6M
Location Alias 2: 00/09-16-118-04 W6/02
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 16
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 9-16-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0176984
License Date: 1995-03-17
License Status: Abandoned
Spud Date: 1995-03-21
Final Drill Date: 1995-04-01
Well Total Depth: 1558.00 m
Surface Hole Latitude: 59.251273
Surface Hole Longitude: -118.598917

For data sources see[1][2]

Well History

Date Event
1995-03-17 Obtained License
1995-03-22 Surface Casing Operation Performed
1995-03-28 Well Log Performed
1995-03-29 Intermediate Casing Operation Performed
1995-03-31 Well Log Performed
1995-04-01 Finished Drilling
1995-04-01 Liner Casing Operation Performed
1995-04-01 Well Mode changed to Drilled and Cased
1995-04-02 Rig Released
1995-04-08 Well Log Performed
1995-04-09 Perforation Treatment Performed - Jet Perforation
1995-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-11 Perforation Treatment Performed - Jet Perforation
1995-04-11 Plug Back Performed
1995-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-13 Perforation Treatment Performed - Jet Perforation
1995-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-04 Perforation Treatment Performed - Cement Squeeze
1995-08-08 Perforation Treatment Performed - Jet Perforation
1995-08-25 Well Log Performed
1995-10-23 Well Log Performed
1995-10-25 Perforation Treatment Performed - Cement Squeeze
1995-10-25 Plug Back Performed
1995-10-25 Well Log Performed
1995-10-26 Perforation Treatment Performed - Jet Perforation
1995-10-27 Perforation Treatment Performed - Jet Perforation
1995-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-18 Perforation Treatment Performed - Jet Perforation
2001-02-18 Plug Back Performed
2001-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-11 Well Began Production
2001-05-11 Well Fluid changed to Gas
2001-05-11 Well Mode changed to Flowing
2003-12-05 Perforation Treatment Performed - Jet Perforation
2003-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-01-01 Well Fluid changed to Gas
2005-01-01 Well Mode changed to Suspended
2009-02-16 Well Log Performed
2009-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-18 Plug Back Performed
2009-02-18 Well Fluid changed to Gas
2009-02-18 Well Log Performed
2009-02-18 Well Mode changed to Abandoned Zone
2009-02-19 Perforation Treatment Performed - Jet Perforation
2009-02-20 Perforation Treatment Performed - Remedial Casing
2009-03-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-04-09 Perforation 1553.00 1554.00 13
1995-08-08 Perforation 1553.00 1554.00 13
1995-10-25 Cement Squeeze 1553.00 1554.00 0
1995-10-26 Perforation 1546.00 1546.60 24
1995-10-27 Perforation 1525.50 1527.00 13
1995-10-27 Perforation 1530.00 1531.50 13
1995-10-27 Perforation 1540.00 1541.00 13
1995-10-28 Acid Treatment 1525.50 1541.00 0
2001-02-18 Packing Device Capped w/Cement 1516.00 1524.00 0
2001-02-18 Perforation 1366.00 1367.00 13
2001-02-18 Perforation 1364.00 1365.00 13
1995-04-10 Acid Treatment 1553.00 1554.00 0
2001-02-18 Perforation 1356.00 1359.00 13
2001-02-20 Acid Treatment 1356.00 1367.00 0
2003-12-05 Perforation 1412.00 1414.00 13
2003-12-05 Perforation 1415.00 1416.00 13
2003-12-05 Perforation 1417.00 1419.00 13
2003-12-05 Perforation 1420.00 1421.00 13
2003-12-05 Perforation 1430.00 1432.50 13
2003-12-05 Perforation 1436.00 1438.00 13
2003-12-06 Acid Treatment 1412.00 1438.00 0
2009-02-18 Packing Device Capped w/Cement 1243.00 1408.00 0
1995-04-11 Packing Device Capped w/Cement 1548.00 1552.00 0
2009-02-19 Perforation 711.50 712.50 20
2009-02-20 Remedial Casing Cementing 711.50 712.50 0
1995-04-11 Perforation 1540.00 1541.00 14
1995-04-12 Acid Treatment 1540.00 1541.00 0
1995-04-13 Perforation 1530.00 1531.50 13
1995-04-13 Acid Treatment 1530.00 1531.50 0
1995-06-02 Acid Treatment 1540.00 1541.00 0
1995-06-04 Cement Squeeze 1540.00 1541.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4230 0.0 0.0 0.0
2002 7489 0.0 0.0 0.0
2003 2716 0.0 0.0 0.0

For data sources see[5]

References