X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186041502020

Well Details

Well ID: 1186041502020
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 02/02-15-118-04W6/0
Location Alias: 02/02-15-18-04 W6M
Location Alias 2: 02/02-15-118-04 W6/00
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 2-15-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0181587
License Date: 1995-10-23
License Status: Abandoned
Spud Date: 1995-10-30
Final Drill Date: 1995-11-12
Well Total Depth: 1510.00 m
Surface Hole Latitude: 59.244860
Surface Hole Longitude: -118.583994

For data sources see[1][2]

Well History

Date Event
1995-10-23 Obtained License
1995-10-31 Surface Casing Operation Performed
1995-11-04 Direction Drilling Operation Performed - Deviate
1995-11-08 Well Log Performed
1995-11-09 Drill Stem Test Performed
1995-11-12 Finished Drilling
1995-11-12 Well Log Performed
1995-11-12 Well Mode changed to Drilled and Cased
1995-11-14 Intermediate Casing Operation Performed
1995-11-14 Liner Casing Operation Performed
1995-11-15 Rig Released
1995-11-21 Well Log Performed
1995-11-23 Perforation Treatment Performed - Jet Perforation
1995-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-25 Well Began Production
1995-11-25 Well Fluid changed to Crude Oil
1995-11-25 Well Mode changed to Pumping
1996-10-03 Well Log Performed
1999-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-27 Plug Back Performed
2002-09-27 Well Fluid changed to Crude Oil
2002-09-27 Well Log Performed
2002-09-27 Well Mode changed to Abandoned Zone
2002-09-28 Perforation Treatment Performed - Jet Perforation
2002-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-04 Perforation Treatment Performed - Cement Plug
2010-03-04 Plug Back Performed
2010-03-05 Perforation Treatment Performed - Cement Plug
2010-03-05 Plug Back Performed
2010-03-06 Well Log Performed
2010-03-07 Perforation Treatment Performed - Jet Perforation
2010-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-08 Perforation Treatment Performed - Remedial Casing
2010-03-08 Well Log Performed
2010-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-09 Perforation Treatment Performed - Jet Perforation
2010-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-10 Perforation Treatment Performed - Remedial Casing
2010-03-16 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-04 1107.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-23 Perforation 1482.50 1484.50 13
2002-09-28 Perforation 1370.50 1371.50 13
2002-09-28 Perforation 1375.00 1376.00 13
2002-09-28 Perforation 1386.50 1387.50 13
2002-09-28 Perforation 1392.50 1394.50 13
2002-09-29 Acid Treatment 1367.00 1394.50 0
2010-03-04 Cement Plug 1371.50 1421.00 0
2010-03-05 Cement Plug 1224.80 1371.50 0
2010-03-07 Perforation 657.00 658.00 17
2010-03-08 Remedial Casing Cementing 657.00 658.00 0
2010-03-08 Packing Device Capped w/Cement 641.00 655.00 0
1995-11-23 Perforation 1486.50 1488.50 13
2010-03-09 Perforation 357.50 358.50 17
2010-03-09 Acid Treatment 357.50 358.50 0
2010-03-10 Remedial Casing Cementing 357.50 358.50 0
2010-03-10 Packing Device Capped w/Cement 347.00 355.00 0
1995-11-23 Perforation 1489.50 1490.50 13
1995-11-23 Perforation 1492.00 1493.00 13
1995-11-23 Perforation 1494.00 1495.00 13
1995-11-24 Acid Treatment 1482.50 1495.00 0
1999-10-22 Acid Treatment 1482.50 1484.50 0
2002-09-27 Packing Device Capped w/Cement 1472.00 1480.00 0
2002-09-28 Perforation 1367.00 1368.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 751 0.0 0.0 0.0
1996 5246 0.0 0.0 0.0
1997 7965 0.0 0.0 0.0
1998 8248 0.0 0.0 0.0
1999 8638 0.0 0.0 0.0
2000 8612 0.0 0.0 0.0
2001 8729 0.0 0.0 0.0
2002 6340 0.0 0.0 0.0

For data sources see[6]

References

BESbswy