X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186041005002

Well Details

Well ID: 1186041005002
Loading map...
Location: 00/05-10-118-04W6/2
Location Alias: 00/05-10-18-04 W6M
Location Alias 2: 00/05-10-118-04 W6/02
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 10
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 5-10-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0031799
License Date: 1967-02-17
License Status: Abandoned
Spud Date: 1967-02-20
Final Drill Date: 1967-03-31
Well Total Depth: 1607.20 m
Surface Hole Latitude: 59.232160
Surface Hole Longitude: -118.594620

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-17 Obtained License
1967-02-20 Direction Drilling Operation Performed - 98
1967-03-14 Drill Stem Test Performed
1967-03-15 Drill Stem Test Performed
1967-03-24 Drill Stem Test Performed
1967-03-26 Drill Stem Test Performed
1967-03-29 Drill Stem Test Performed
1967-03-31 Finished Drilling
1967-03-31 Well Mode changed to Drilled and Cased
1967-04-04 Drill Stem Test Performed
1967-04-05 Liner Casing Operation Performed
1967-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-13 Perforation Treatment Performed - Acid Wash - No Pressure
1967-04-13 Perforation Treatment Performed - Jet Perforation
1970-09-11 Perforation Treatment Performed - Jet Perforation
1970-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-07 Well Began Injection
1970-10-07 Well Fluid changed to Water
1970-10-07 Well Type changed to Injection
1972-10-01 Well Fluid changed to Water
1972-10-01 Well Mode changed to Suspended
1972-10-01 Well Type changed to Injection
1988-08-31 Perforation Treatment Performed - Jet Perforation
1988-08-31 Well Log Performed
1988-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-14 Perforation Treatment Performed - Cement Squeeze
1995-07-14 Plug Back Performed
1995-07-14 Well Fluid changed to Water
1995-07-14 Well Mode changed to Suspended
1995-07-14 Well Type changed to Injection
1995-07-17 Perforation Treatment Performed - Jet Perforation
1995-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-12 Plug Back Performed
2001-07-12 Well Log Performed
2001-07-14 Perforation Treatment Performed - Jet Perforation
2001-07-14 Well Log Performed
2001-07-15 Well Fluid changed to Water
2001-07-15 Well Mode changed to Abandoned Zone
2001-07-15 Well Type changed to Injection
2001-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-18 Perforation Treatment Performed - Jet Perforation
2001-07-18 Well Log Performed
2001-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-15 Plug Back Performed
2014-03-15 Well Log Performed
2014-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-16 Plug Back Performed
2014-03-16 Well Log Performed
2014-03-17 Perforation Treatment Performed - Jet Perforation
2014-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-18 Perforation Treatment Performed - Remedial Casing
2014-03-19 Perforation Treatment Performed - Jet Perforation
2014-03-19 Well Log Performed
2014-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-20 Perforation Treatment Performed - Remedial Casing
2014-03-21 Perforation Treatment Performed - Jet Perforation
2014-03-21 Well Log Performed
2014-03-22 Perforation Treatment Performed - Remedial Casing
2014-03-23 Perforation Treatment Performed - Jet Perforation
2014-03-23 Well Log Performed
2014-03-24 Perforation Treatment Performed - Remedial Casing
2014-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-03-30 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1967-02-20 1291.70 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-13 Perforation 1508.80 1513.30 3
1995-07-14 Cement Squeeze 1474.00 1491.10 0
1995-07-14 Packing Device Capped w/Cement 1483.50 1508.50 0
1995-07-17 Perforation 1464.30 1466.10 13
1995-07-18 Acid Treatment 1473.50 1474.00 0
1995-07-18 Acid Treatment 1465.50 1466.00 0
1995-07-20 Acid Treatment 1472.20 1474.00 0
2001-07-12 Packing Device Capped w/Cement 1454.00 1462.00 0
2001-07-14 Perforation 1361.50 1366.70 13
2001-07-14 Perforation 1358.80 1360.30 13
2001-07-16 Acid Treatment 1358.80 1366.70 0
1967-04-13 Acid Wash 1508.80 1513.30 0
2001-07-18 Perforation 1305.20 1307.00 13
2001-07-18 Perforation 1300.30 1302.10 13
2001-07-18 Perforation 1296.60 1297.20 13
2001-07-18 Perforation 1290.50 1292.40 13
2001-07-19 Acid Treatment 1290.50 1307.00 0
2014-03-14 Packing Device Capped w/Cement 1387.00 1395.00 0
2014-03-15 Packing Device Capped w/Cement 1347.00 1355.00 0
2014-03-16 Packing Device Capped w/Cement 1277.00 1285.00 0
2014-03-17 Perforation 649.00 650.00 17
2014-03-18 Remedial Casing Cementing 649.00 650.00 0
1967-04-13 Acid Treatment 1508.80 1513.30 0
2014-03-18 Packing Device Capped w/Cement 635.50 646.00 0
2014-03-19 Perforation 304.00 305.00 17
2014-03-20 Packing Device Capped w/Cement 285.50 302.00 0
2014-03-20 Remedial Casing Cementing 304.00 305.00 0
2014-03-21 Perforation 194.00 195.00 17
2014-03-22 Remedial Casing Cementing 194.00 195.00 0
2014-03-23 Perforation 190.00 191.00 17
2014-03-24 Remedial Casing Cementing 190.00 191.00 0
2014-03-25 Packing Device Capped w/Cement 180.00 188.00 0
1970-09-11 Perforation 1532.50 1534.40 13
1970-09-11 Perforation 1534.40 1539.20 13
1970-09-12 Acid Treatment 1532.50 1539.20 0
1988-08-31 Perforation 1472.20 1480.10 13
1988-08-31 Perforation 1481.90 1491.10 13
1988-09-01 Acid Treatment 1472.20 1491.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References