X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186040915004

Well Details

Well ID: 1186040915004
Loading map...
Location: 00/15-09-118-04W6/4
Location Alias: 00/15-09-18-04 W6M
Location Alias 2: 00/15-09-118-04 W6/04
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 09
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 15-9-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0184766
License Date: 1996-01-19
License Status: Abandoned
Spud Date: 1996-01-28
Final Drill Date: 1996-02-04
Well Total Depth: 1585.00 m
Surface Hole Latitude: 59.239565
Surface Hole Longitude: -118.606437

For data sources see[1][2]

Well History

Date Event
1996-01-19 Obtained License
1996-02-04 Finished Drilling
1996-02-04 Liner Casing Operation Performed
1996-02-04 Well Mode changed to Drilled and Cased
1996-02-06 Well Log Performed
1996-02-07 Perforation Treatment Performed - Jet Perforation
1996-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-17 Rig Released
2000-06-25 Well Log Performed
2000-06-29 Well Log Performed
2001-06-17 Well Log Performed
2001-06-18 Perforation Treatment Performed - Cement Squeeze
2001-06-18 Plug Back Performed
2001-06-19 Perforation Treatment Performed - Jet Perforation
2001-06-19 Well Log Performed
2001-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-24 Perforation Treatment Performed - Jet Perforation
2001-06-24 Well Log Performed
2001-06-24 Well Mode changed to Drilled and Cased
2001-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-10 Well Log Performed
2010-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-12 Plug Back Performed
2010-02-12 Well Mode changed to Abandoned Zone
2010-02-13 Perforation Treatment Performed - Cement Plug
2010-02-13 Plug Back Performed
2010-02-13 Well Log Performed
2010-02-14 Well Log Performed
2010-02-15 Perforation Treatment Performed - Jet Perforation
2010-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-17 Perforation Treatment Performed - Remedial Casing
2010-03-01 Well Abandoned
2010-03-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-07 Perforation 1484.00 1485.00 13
2001-06-19 Perforation 1396.50 1402.00 13
2001-06-20 Acid Treatment 1396.50 1402.00 0
2001-06-24 Perforation 1307.00 1309.00 13
2001-06-24 Perforation 1315.50 1317.00 13
2001-06-24 Perforation 1323.50 1326.50 13
2001-06-25 Acid Treatment 1307.00 1326.50 0
2010-02-11 Packing Device Capped w/Cement 1472.00 1480.00 0
2010-02-12 Packing Device Capped w/Cement 1205.00 1388.00 0
2010-02-13 Cement Plug 1166.50 1205.00 0
2010-02-15 Perforation 320.00 321.00 20
1996-02-07 Perforation 1490.50 1491.50 13
2010-02-17 Remedial Casing Cementing 320.00 321.00 0
2010-02-17 Packing Device Capped w/Cement 305.00 318.00 0
1996-02-07 Perforation 1493.00 1494.00 13
1996-02-07 Perforation 1495.00 1496.00 13
1996-02-07 Perforation 1497.00 1499.00 13
1996-02-07 Perforation 1503.50 1505.50 13
1996-02-07 Perforation 1511.00 1515.50 13
1996-02-09 Acid Treatment 1484.00 1515.50 0
2001-06-18 Cement Squeeze 1484.00 1515.50 0

For data sources see[4]



References