X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186040304003

Well Details

Well ID: 1186040304003
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/04-03-118-04W6/3
Location Alias: 00/04-03-18-04 W6M
Location Alias 2: 00/04-03-118-04 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 03
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 4-3-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0031999
License Date: 1967-03-23
License Status: Abandoned
Spud Date: 1967-03-27
Final Drill Date: 1995-10-04
Well Total Depth: 1491.00 m
Surface Hole Latitude: 59.214510
Surface Hole Longitude: -118.592535

For data sources see[1][2]

Well History

Date Event
1967-03-23 Obtained License
1995-09-17 Well Log Performed
1995-10-02 Direction Drilling Operation Performed - Deviate
1995-10-04 Finished Drilling
1995-10-04 Well Log Performed
1995-10-04 Well Mode changed to Drilled and Cased
1995-10-05 Liner Casing Operation Performed
1995-10-06 Rig Released
1995-10-11 Perforation Treatment Performed - Open-Hole Completion
1995-10-11 Well Log Performed
1995-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-11 Perforation Treatment Performed - Cement Plug
1995-12-11 Perforation Treatment Performed - Open-Hole Completion
1995-12-12 Perforation Treatment Performed - Jet Perforation
1996-09-30 Well Log Performed
1999-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-11 Perforation Treatment Performed - Jet Perforation
1999-12-11 Plug Back Performed
1999-12-11 Well Log Performed
1999-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-12 Well Log Performed
1999-12-24 Well Began Production
1999-12-24 Well Fluid changed to Gas
1999-12-24 Well Mode changed to Flowing
2002-07-18 Well Log Performed
2002-07-19 Perforation Treatment Performed - Jet Perforation
2002-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-22 Well Fluid changed to Gas
2002-07-22 Well Mode changed to Suspended
2003-01-05 Well Fluid changed to Gas
2003-01-05 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended
2013-10-04 Perforation Treatment Performed - Cement Plug
2013-10-04 Well Log Performed
2013-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-05 Plug Back Performed
2013-10-05 Well Fluid changed to Gas
2013-10-05 Well Log Performed
2013-10-05 Well Mode changed to Abandoned Zone
2013-10-06 Well Log Performed
2013-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-07 Perforation Treatment Performed - Jet Perforation
2013-10-07 Well Log Performed
2013-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-13 Perforation Treatment Performed - Jet Perforation
2013-10-13 Perforation Treatment Performed - Remedial Casing
2013-10-13 Well Log Performed
2013-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-14 Perforation Treatment Performed - Remedial Casing
2013-10-15 Well Log Performed
2013-11-21 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-02 1262.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-11 Open Hole/Barefoot Completion 1465.00 1491.00 0
2002-07-19 Perforation 1288.50 1292.00 13
2002-07-19 Perforation 1292.00 1295.00 13
2002-07-20 Acid Treatment 1288.50 1295.00 0
2013-10-04 Cement Plug 1442.80 1446.80 0
2013-10-05 Packing Device Capped w/Cement 1273.00 1283.00 0
2013-10-05 Packing Device Capped w/Cement 1328.00 1338.00 0
2013-10-07 Perforation 639.00 640.00 17
2013-10-07 Packing Device Capped w/Cement 1096.50 1105.00 0
2013-10-13 Packing Device Capped w/Cement 624.00 634.00 0
2013-10-13 Remedial Casing Cementing 639.00 640.00 0
1995-10-13 Acid Treatment 1465.00 1491.00 0
2013-10-13 Perforation 286.50 287.50 17
2013-10-14 Remedial Casing Cementing 286.50 287.50 0
2013-10-14 Packing Device Capped w/Cement 273.00 283.00 0
1995-12-11 Cement Plug 1482.00 1491.00 0
1995-12-11 Open Hole/Barefoot Completion 1465.00 1482.00 0
1995-12-12 Perforation 1478.00 1481.00 13
1999-12-11 Packing Device Capped w/Cement 1446.80 1454.80 0
1999-12-11 Perforation 1345.00 1350.00 13
1999-12-11 Perforation 1354.00 1359.00 13
1999-12-12 Acid Treatment 1345.00 1359.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 184 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 8617 0.0 0.0 0.0
2002 4895 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References

BESbswy