X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186040103003

Well Details

Well ID: 1186040103003
Loading map...
Location: 00/03-01-118-04W6/3
Location Alias: 00/03-01-18-04 W6M
Location Alias 2: 00/03-01-118-04 W6/03
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 04
Section: 01
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 3-1-118-4
Operator Name: Paramount Resources Ltd.
License Number: 0032174
License Date: 1967-05-30
License Status: Abandoned
Spud Date: 1967-05-30
Final Drill Date: 1967-06-27
Well Total Depth: 1621.20 m
Surface Hole Latitude: 59.214801
Surface Hole Longitude: -118.529383

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-05-30 Obtained License
1967-06-13 Drill Stem Test Performed
1967-06-15 Production Casing Operation Performed
1967-06-21 Drill Stem Test Performed
1967-06-22 Drill Stem Test Performed
1967-06-24 Drill Stem Test Performed
1967-06-27 Finished Drilling
1967-06-27 Well Mode changed to Drilled and Cased
1967-06-29 Drill Stem Test Performed
1967-07-20 Perforation Treatment Performed - Open-Hole Completion
1967-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-12-10 Perforation Treatment Performed - Open-Hole Completion
1997-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-24 Perforation Treatment Performed - Jet Perforation
1997-11-24 Plug Back Performed
1997-11-24 Well Log Performed
1997-11-25 Perforation Treatment Performed - Jet Perforation
1997-11-25 Well Log Performed
2001-03-01 Well Log Performed
2001-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-02 Perforation Treatment Performed - Jet Perforation
2001-03-02 Plug Back Performed
2001-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-05 Well Began Production
2001-04-05 Well Fluid changed to Gas
2001-04-05 Well Mode changed to Flowing
2009-03-04 Well Log Performed
2009-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-05 Plug Back Performed
2009-03-05 Well Fluid changed to Gas
2009-03-05 Well Log Performed
2009-03-05 Well Mode changed to Abandoned Zone
2009-03-06 Perforation Treatment Performed - Jet Perforation
2009-03-06 Well Log Performed
2009-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-07 Perforation Treatment Performed - Jet Perforation
2009-03-07 Perforation Treatment Performed - Remedial Casing
2009-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-08 Perforation Treatment Performed - Remedial Casing
2009-03-13 Well Abandoned
2009-03-13 Well Fluid changed to Gas
2009-03-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-20 Open Hole/Barefoot Completion 1371.60 1472.20 0
1997-11-25 Perforation 1315.50 1316.40 13
2001-03-02 Packing Device Capped w/Cement 1304.00 1312.00 0
2001-03-02 Perforation 1266.10 1269.80 13
2001-03-03 Acid Treatment 1266.10 1269.80 0
2009-03-05 Packing Device Capped w/Cement 1251.00 1259.00 0
2009-03-06 Perforation 614.00 615.00 20
2009-03-07 Perforation 274.00 275.00 20
2009-03-07 Remedial Casing Cementing 614.00 615.00 0
2009-03-07 Packing Device Capped w/Cement 601.50 610.00 0
2009-03-08 Remedial Casing Cementing 274.00 275.00 0
1967-07-28 Acid Treatment 1371.60 1472.20 0
2009-03-08 Packing Device Capped w/Cement 260.50 272.00 0
1974-12-10 Packing Device Capped w/Cement 1444.40 1446.90 0
1974-12-10 Open Hole/Barefoot Completion 1371.60 1444.40 0
1997-11-24 Packing Device Capped w/Cement 1352.00 1360.00 0
1997-11-24 Perforation 1324.30 1328.30 13
1997-11-25 Perforation 1322.80 1328.30 13
1997-11-25 Perforation 1320.30 1321.90 13
1997-11-25 Perforation 1318.20 1319.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4392 0.0 0.0 0.0

For data sources see[5]

References