X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186030605002

Well Details

Well ID: 1186030605002
Loading map...
Location: 00/05-06-118-03W6/2
Location Alias: 00/05-06-18-03 W6M
Location Alias 2: 00/05-06-118-03 W6/02
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 03
Section: 06
County/Municipality: Mackenzie County
Well Name: ACL ET AL ZAMA 5-6-118-3
Operator Name: Paramount Resources Ltd.
License Number: 0033096
License Date: 1967-11-20
License Status: Abandoned
Spud Date: 1967-11-24
Final Drill Date: 1967-12-11
Well Total Depth: 1508.80 m
Surface Hole Latitude: 59.216791
Surface Hole Longitude: -118.507331

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-20 Obtained License
1967-12-02 Drill Stem Test Performed
1967-12-11 Finished Drilling
1967-12-11 Well Mode changed to Drilled and Cased
1967-12-12 Drill Stem Test Performed
1967-12-13 Drill Stem Test Performed
1967-12-14 Drill Stem Test Performed
1967-12-15 Production Casing Operation Performed
1968-01-15 Perforation Treatment Performed - Jet Perforation
1969-03-26 Perforation Treatment Performed - Jet Perforation
1983-11-30 Well Log Performed
1983-12-01 Perforation Treatment Performed - Cement Squeeze
1983-12-02 Perforation Treatment Performed - Jet Perforation
1983-12-02 Well Log Performed
1991-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-10 Perforation Treatment Performed - Jet Perforation
1999-03-10 Plug Back Performed
1999-03-10 Well Log Performed
1999-03-10 Well Mode changed to Drilled and Cased
1999-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-29 Well Began Production
1999-06-29 Well Fluid changed to Gas
1999-06-29 Well Mode changed to Flowing
2002-10-27 Perforation Treatment Performed - Jet Perforation
2002-10-27 Well Log Performed
2002-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-28 Perforation Treatment Performed - Jet Perforation
2002-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-01 Well Fluid changed to Gas
2002-12-01 Well Mode changed to Suspended
2003-06-06 Well Fluid changed to Gas
2003-06-06 Well Mode changed to Flowing
2006-10-01 Well Fluid changed to Gas
2006-10-01 Well Mode changed to Flowing
2006-10-12 Well Fluid changed to Gas
2006-10-12 Well Mode changed to Pumping
2015-08-31 Well Fluid changed to Gas
2015-08-31 Well Mode changed to Suspended
2016-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-23 Plug Back Performed
2016-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-25 Perforation Treatment Performed - Jet Perforation
2016-11-25 Plug Back Performed
2016-11-25 Well Fluid changed to Gas
2016-11-25 Well Mode changed to Abandoned Zone
2016-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-28 Perforation Treatment Performed - Remedial Casing
2016-11-29 Perforation Treatment Performed - Jet Perforation
2016-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-30 Perforation Treatment Performed - Remedial Casing
2016-12-03 Well Abandoned
2016-12-03 Well Fluid changed to Gas
2016-12-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-15 Perforation 1459.40 1461.80 7
1999-03-10 Perforation 1307.60 1311.90 14
1999-03-11 Acid Treatment 1307.60 1311.90 0
2002-10-27 Perforation 1257.00 1260.00 14
2002-10-28 Acid Treatment 1257.00 1260.00 0
2002-10-28 Perforation 1257.00 1260.00 14
2002-10-29 Acid Treatment 1257.00 1260.00 0
2016-11-23 Packing Device Capped w/Cement 1286.50 1295.00 0
2016-11-25 Packing Device Capped w/Cement 1237.50 1246.00 0
2016-11-25 Perforation 598.00 599.00 99
2016-11-28 Remedial Casing Cementing 598.00 599.00 0
1969-03-26 Perforation 1448.10 1450.20 7
2016-11-28 Packing Device Capped w/Cement 583.00 593.00 0
2016-11-29 Perforation 266.00 267.00 17
2016-11-30 Remedial Casing Cementing 266.00 267.00 0
2016-11-30 Packing Device Capped w/Cement 247.00 259.00 0
1983-12-01 Cement Squeeze 1459.40 1461.80 0
1983-12-02 Perforation 1448.10 1450.20 13
1983-12-02 Perforation 1443.50 1444.80 13
1983-12-02 Perforation 1432.00 1433.20 13
1983-12-02 Perforation 1429.50 1430.40 13
1991-12-12 Acid Treatment 1429.50 1433.20 0
1999-03-10 Packing Device Capped w/Cement 1417.00 1425.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4450 0.0 0.0 0.0
2000 8654 0.0 0.0 0.0
2001 8425 0.0 0.0 0.0
2002 7204 0.0 0.0 0.0
2003 4825 0.0 0.0 0.0
2004 8705 0.0 0.0 0.0
2005 8679 0.0 0.0 0.0
2006 7679 0.0 0.0 0.0
2007 8523 0.0 0.0 0.0
2008 8715 0.0 0.0 0.0
2009 8295 0.0 0.0 0.0
2010 8231 0.0 0.0 0.0
2011 8281 0.0 0.0 0.0
2012 7839 0.0 0.0 0.0
2013 8208 0.0 0.0 0.0
2014 213 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References