X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1186022816002

Well Details

Well ID: 1186022816002
Loading map...
Location: 00/16-28-118-02W6/2
Location Alias: 00/16-28-18-02 W6M
Location Alias 2: 00/16-28-118-02 W6/02
Country: Canada
Province: Alberta
Township: 118
Meridian: 6
Range: 02
Section: 28
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 16-28-118-2
Operator Name: Paramount Resources Ltd.
License Number: 0348864
License Date: 2006-01-13
License Status: Abandoned
Spud Date: 2006-02-07
Final Drill Date: 2006-02-12
Well Total Depth: 1320.00 m
Surface Hole Latitude: 59.284210
Surface Hole Longitude: -118.260140

For data sources see[1][2]

Well History

Date Event
2006-01-13 Obtained License
2006-02-08 Surface Casing Operation Performed
2006-02-12 Finished Drilling
2006-02-12 Well Log Performed
2006-02-12 Well Mode changed to Drilled and Cased
2006-02-13 Production Casing Operation Performed
2006-02-13 Rig Released
2006-02-17 Well Log Performed
2006-02-18 Perforation Treatment Performed - Jet Perforation
2006-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-05 Plug Back Performed
2011-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-07 Plug Back Performed
2011-03-07 Well Mode changed to Abandoned Zone
2011-03-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-18 Perforation 1263.00 1264.50 13
2011-03-07 Packing Device Capped w/Cement 1215.00 1223.00 0
2006-02-18 Perforation 1266.00 1267.00 13
2006-02-18 Perforation 1269.00 1270.50 13
2006-02-18 Perforation 1244.50 1247.00 13
2006-02-18 Perforation 1228.00 1230.00 13
2006-02-19 Acid Treatment 1263.00 1270.50 0
2006-02-23 Acid Treatment 1228.00 1230.00 0
2011-03-05 Packing Device Capped w/Cement 1250.00 1258.00 0
2011-03-07 Packing Device Capped w/Cement 1233.00 1241.00 0

For data sources see[4]



References