X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176083101002

Well Details

Well ID: 1176083101002
Loading map...
Location: 00/01-31-117-08W6/2
Location Alias: 00/01-31-17-08 W6M
Location Alias 2: 00/01-31-117-08 W6/02
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 08
Section: 31
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 1-31-117-8
Operator Name: Paramount Resources Ltd.
License Number: 0140731
License Date: 1989-08-24
License Status: Abandoned
Spud Date: 1989-09-08
Final Drill Date: 1989-10-01
Well Total Depth: 1860.00 m
Surface Hole Latitude: 59.199341
Surface Hole Longitude: -119.341368

For data sources see[1][2]

Well History

Date Event
1989-08-24 Obtained License
1989-09-09 Lost Circulation Occurred
1989-09-10 Surface Casing Operation Performed
1989-09-24 Well Log Performed
1989-09-26 Lost Circulation Occurred
1989-09-26 Production Casing Operation Performed
1989-09-29 Lost Circulation Occurred
1989-10-01 Finished Drilling
1989-10-01 Perforation Treatment Performed - Open-Hole Completion
1989-10-01 Well Log Performed
1989-10-01 Well Mode changed to Drilled and Cased
1989-10-02 Well Log Performed
1989-10-03 Liner Casing Operation Performed
1989-10-03 Perforation Treatment Performed - Cement Squeeze
1989-10-04 Rig Released
1989-10-13 Well Log Performed
1989-11-08 Well Log Performed
1989-11-09 Well Log Performed
1989-11-11 Perforation Treatment Performed - Jet Perforation
1989-11-16 Well Log Performed
1989-11-17 Perforation Treatment Performed - Cement Squeeze
1989-11-18 Perforation Treatment Performed - Jet Perforation
1989-11-18 Well Log Performed
1992-12-17 Perforation Treatment Performed - Jet Perforation
1992-12-31 Well Log Performed
1993-11-05 Well Began Injection
1993-11-05 Well Fluid changed to Water
1993-11-05 Well Type changed to Injection
1995-01-18 Well Log Performed
1996-03-21 Well Fluid changed to Water
1996-03-21 Well Mode changed to Closed
1996-03-21 Well Type changed to Injection
1996-05-03 Well Fluid changed to Water
1996-05-03 Well Type changed to Injection
1997-08-23 Well Log Performed
1997-08-24 Perforation Treatment Performed - Jet Perforation
1997-08-29 Well Log Performed
1997-08-30 Perforation Treatment Performed - Jet Perforation
2010-05-01 Well Fluid changed to Water
2010-05-01 Well Mode changed to Suspended
2010-05-01 Well Type changed to Injection
2011-09-05 Well Log Performed
2011-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-06 Plug Back Performed
2011-09-06 Well Fluid changed to Water
2011-09-06 Well Log Performed
2011-09-06 Well Mode changed to Abandoned Zone
2011-09-06 Well Type changed to Injection
2011-09-07 Well Log Performed
2011-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-08 Perforation Treatment Performed - Jet Perforation
2011-09-08 Well Log Performed
2011-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-09 Perforation Treatment Performed - Jet Perforation
2011-09-09 Perforation Treatment Performed - Remedial Casing
2011-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-10 Perforation Treatment Performed - Remedial Casing
2011-09-10 Well Log Performed
2011-09-11 Perforation Treatment Performed - Jet Perforation
2011-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-13 Perforation Treatment Performed - Remedial Casing
2011-09-27 Well Abandoned
2011-09-27 Well Fluid changed to Water
2011-09-27 Well Mode changed to Abandoned
2011-09-27 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-01 Open Hole/Barefoot Completion 1675.00 1860.00 0
1997-08-30 Perforation 1714.00 1715.50 13
2011-09-06 Packing Device Capped w/Cement 1702.00 1710.00 0
2011-09-08 Packing Device Capped w/Cement 1547.00 1555.00 0
2011-09-08 Perforation 534.00 535.00 17
2011-09-09 Remedial Casing Cementing 534.00 535.00 0
2011-09-09 Packing Device Capped w/Cement 516.00 526.00 0
2011-09-09 Perforation 423.00 424.00 17
2011-09-10 Remedial Casing Cementing 423.00 424.00 0
2011-09-10 Packing Device Capped w/Cement 411.00 420.00 0
2011-09-11 Perforation 372.00 373.00 99
1989-10-03 Cement Squeeze 1675.00 1860.00 0
2011-09-12 Acid Treatment 372.00 373.00 0
2011-09-13 Remedial Casing Cementing 372.00 373.00 0
2011-09-13 Packing Device Capped w/Cement 359.00 368.00 0
1989-11-11 Perforation 1757.50 1760.50 12
1989-11-11 Perforation 1763.80 1766.80 12
1989-11-17 Cement Squeeze 1763.80 1766.80 0
1989-11-18 Perforation 1753.00 1756.00 13
1992-12-17 Perforation 1792.60 1795.00 13
1992-12-17 Perforation 1795.00 1799.00 13
1997-08-24 Perforation 1724.00 1726.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-09-09 Lost Circulation 291.00 291.00
1989-09-26 Lost Circulation 1675.00 1675.00
1989-09-29 Lost Circulation 1770.00 1860.00

For data sources see[6]

References