X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176082809000

Well Details

Well ID: 1176082809000
Loading map...
Location: 00/09-28-117-08W6/0
Location Alias: 00/09-28-17-08 W6M
Location Alias 2: 00/09-28-117-08 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 08
Section: 28
County/Municipality: Mackenzie County
Well Name: ACL SHEKILIE 9-28-117-8
Operator Name: Paramount Resources Ltd.
License Number: 0078965
License Date: 1979-10-31
License Status: Abandoned
Spud Date: 1979-11-04
Final Drill Date: 1979-12-03
Well Total Depth: 1863.00 m
Surface Hole Latitude: 59.192061
Surface Hole Longitude: -119.282678

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-31 Obtained License
1979-11-25 Drill Stem Test Performed
1979-11-27 Drill Stem Test Performed
1979-11-28 Drill Stem Test Performed
1979-12-03 Finished Drilling
1979-12-03 Well Log Performed
1979-12-03 Well Mode changed to Drilled and Cased
1979-12-04 Liner Casing Operation Performed
1980-01-15 Perforation Treatment Performed - Jet Perforation
1980-01-16 Well Began Production
1980-01-16 Well Fluid changed to Crude Oil
1980-01-16 Well Mode changed to Flowing
1983-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-26 Well Fluid changed to Crude Oil
1983-03-26 Well Mode changed to Pumping
1995-03-01 Well Fluid changed to Crude Oil
1995-03-01 Well Mode changed to Suspended
1996-06-01 Well Fluid changed to Crude Oil
1996-06-01 Well Mode changed to Pumping
2003-08-23 Well Log Performed
2003-08-29 Perforation Treatment Performed - Cement Squeeze
2003-09-01 Perforation Treatment Performed - Jet Perforation
2003-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-04 Perforation Treatment Performed - Jet Perforation
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Suspended
2010-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-26 Well Log Performed
2010-09-30 Perforation Treatment Performed - Jet Perforation
2010-09-30 Well Log Performed
2010-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-07 Well Log Performed
2010-10-13 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-10-13 Plug Back Performed
2010-10-13 Well Fluid changed to Crude Oil
2010-10-13 Well Log Performed
2010-10-13 Well Mode changed to Abandoned Zone
2010-10-14 Well Log Performed
2010-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-15 Plug Back Performed
2010-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-16 Perforation Treatment Performed - Jet Perforation
2010-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-17 Perforation Treatment Performed - Jet Perforation
2010-10-17 Perforation Treatment Performed - Remedial Casing
2010-10-17 Well Log Performed
2010-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-18 Perforation Treatment Performed - Remedial Casing
2010-10-18 Well Log Performed
2010-10-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-15 Perforation 1686.00 1689.00 7
2010-09-30 Perforation 1657.00 1662.00 13
2010-09-30 Perforation 1666.00 1671.00 13
2010-10-01 Acid Treatment 1666.00 1671.00 0
2010-10-13 Packing Dev Cpd w/Res-Gyp Cem 1662.00 1665.00 0
2010-10-15 Packing Device Capped w/Cement 1642.00 1650.00 0
2010-10-16 Perforation 861.00 862.00 17
2010-10-16 Packing Device Capped w/Cement 1332.00 1440.00 0
2010-10-16 Packing Device Capped w/Cement 884.00 892.00 0
2010-10-17 Perforation 504.00 505.00 17
2010-10-17 Packing Device Capped w/Cement 835.30 854.00 0
1983-03-24 Acid Treatment 1686.00 1689.00 7
2010-10-17 Remedial Casing Cementing 861.00 862.00 0
2010-10-18 Remedial Casing Cementing 504.00 505.00 0
2010-10-18 Packing Device Capped w/Cement 488.50 498.00 0
2003-08-29 Cement Squeeze 1686.00 1689.00 0
2003-09-01 Perforation 1710.00 1714.00 13
2003-09-02 Acid Treatment 1710.00 1714.00 0
2003-09-04 Perforation 1695.00 1699.00 13
2003-09-04 Perforation 1701.00 1705.00 13
2003-09-04 Acid Treatment 1695.00 1705.00 0
2010-09-26 Packing Device Capped w/Cement 1677.00 1685.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 3544 0.0 0.0 0.0
1981 8205 0.0 0.0 0.0
1982 8154 0.0 0.0 0.0
1983 7131 0.0 0.0 0.0
1984 2112 0.0 0.0 0.0
1985 6877 0.0 0.0 0.0
1986 8390 0.0 0.0 0.0
1987 7352 0.0 0.0 0.0
1988 8348 0.0 0.0 0.0
1989 7631 0.0 0.0 0.0
1990 7690 0.0 0.0 0.0
1991 5306 0.0 0.0 0.0
1992 292 0.0 0.0 0.0
1993 2998 0.0 0.0 0.0
1994 8573 0.0 0.0 0.0
1995 1353 0.0 0.0 0.0
1996 444 0.0 0.0 0.0
1999 5170 0.0 0.0 0.0
2000 3583 0.0 0.0 0.0
2003 1656 0.0 0.0 0.0
2004 8516 0.0 0.0 0.0
2005 7449 0.0 0.0 0.0
2006 6648 0.0 0.0 0.0
2007 7453 0.0 0.0 0.0
2008 5442 0.0 0.0 0.0
2009 750 0.0 0.0 0.0

For data sources see[5]

References