X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176060911020

Well Details

Well ID: 1176060911020
Loading map...
Location: 02/11-09-117-06W6/0
Location Alias: 02/11-09-17-06 W6M
Location Alias 2: 02/11-09-117-06 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 06
Section: 09
County/Municipality: Mackenzie County
Well Name: ACL 102 ZAMA 11-9-117-6
Operator Name: Paramount Resources Ltd.
License Number: 0105402
License Date: 1984-01-20
License Status: Abandoned
Spud Date: 1984-01-26
Final Drill Date: 1984-02-08
Well Total Depth: 1672.00 m
Surface Hole Latitude: 59.149380
Surface Hole Longitude: -118.959691

For data sources see[1][2]

Well History

Date Event
1984-01-20 Obtained License
1984-02-08 Finished Drilling
1984-02-08 Lost Circulation Occurred
1984-02-09 Drill Stem Test Performed
1984-02-09 Well Log Performed
1984-02-10 Lost Circulation Occurred
1984-02-11 Drill Stem Test Performed
1984-02-12 Drill Stem Test Performed
1984-02-14 Production Casing Operation Performed
1984-11-23 Well Log Performed
1984-11-24 Perforation Treatment Performed - Jet Perforation
1984-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-31 Plug Back Performed
1985-02-01 Well Log Performed
1985-02-02 Perforation Treatment Performed - Jet Perforation
1985-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-12 Well Mode changed to Drilled and Cased
1995-05-01 Well Began Production
1995-05-01 Well Fluid changed to Gas
1995-05-01 Well Mode changed to Flowing
2001-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-22 Plug Back Performed
2001-05-22 Well Fluid changed to Gas
2001-05-22 Well Log Performed
2001-05-22 Well Mode changed to Abandoned Zone
2001-05-23 Well Log Performed
2001-05-25 Perforation Treatment Performed - Jet Perforation
2001-05-25 Well Log Performed
2001-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-27 Perforation Treatment Performed - Remedial Casing
2001-06-04 Perforation Treatment Performed - Jet Perforation
2001-06-04 Well Log Performed
2001-06-05 Perforation Treatment Performed - Cement Plug
2001-06-05 Perforation Treatment Performed - Remedial Casing
2010-01-19 Well Log Performed
2010-01-20 Well Log Performed
2010-01-21 Perforation Treatment Performed - Jet Perforation
2010-01-21 Well Log Performed
2010-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-23 Perforation Treatment Performed - Remedial Casing
2010-01-23 Well Log Performed
2010-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-29 Well Abandoned
2010-01-29 Well Fluid changed to Gas
2010-01-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-24 Perforation 1408.80 1412.30 13
1985-02-03 Acid Treatment 1348.00 1358.50 0
2001-05-22 Packing Device Capped w/Cement 1334.70 1342.70 0
2001-05-25 Perforation 829.00 830.00 13
2001-05-26 Acid Treatment 829.00 830.00 0
2001-05-27 Remedial Casing Cementing 829.00 830.00 0
2001-06-04 Perforation 400.40 400.70 14
2001-06-04 Perforation 400.00 401.00 14
2001-06-05 Remedial Casing Cementing 400.00 401.00 0
2001-06-05 Cement Plug 315.00 335.00 0
2010-01-21 Perforation 719.00 720.00 17
1984-11-24 Perforation 1413.60 1415.00 13
2010-01-23 Remedial Casing Cementing 719.00 720.00 0
2010-01-23 Packing Device Capped w/Cement 700.00 708.00 0
2010-01-24 Packing Device Capped w/Cement 390.00 398.00 0
2010-01-25 Packing Device Capped w/Cement 196.00 328.00 0
2010-01-26 Packing Device Capped w/Cement 167.50 176.50 0
1984-11-24 Perforation 1416.50 1419.00 13
1984-11-24 Perforation 1420.90 1421.80 13
1984-11-24 Perforation 1422.10 1423.50 13
1984-11-25 Acid Treatment 1408.80 1423.50 0
1985-01-31 Packing Device Capped w/Cement 1387.00 1397.00 0
1985-02-02 Perforation 1348.00 1351.00 13
1985-02-02 Perforation 1356.00 1358.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 60 0.0 0.0 0.0
1995 3881 0.0 0.0 0.0
1996 5221 0.0 0.0 0.0
1997 7896 0.0 0.0 0.0
1998 7758 0.0 0.0 0.0
1999 413 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-02-08 Lost Circulation 1640.00 1640.00
1984-02-10 Lost Circulation 1672.00 1672.00

For data sources see[6]

References