If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1176052804020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/04-28-117-05W6/0 | |
Location Alias: 02/04-28-17-05 W6M | |
Location Alias 2: 02/04-28-117-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 117 | |
Meridian: 6 | |
Range: 05 | |
Section: 28 | |
County/Municipality: Mackenzie County | |
Well Name: ACL ET AL 102 ZAMA 4-28-117-5 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0101614 | |
License Date: 1983-06-07 | |
License Status: Suspension | |
Spud Date: 1983-06-30 | |
Final Drill Date: 1983-07-28 | |
Well Total Depth: 1653.70 m | |
Surface Hole Latitude: 59.182966 | |
Surface Hole Longitude: -118.793188 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-06-07 | Obtained License |
1983-06-30 | Direction Drilling Operation Performed - 98 |
1983-07-17 | Drill Stem Test Performed |
1983-07-19 | Drill Stem Test Performed |
1983-07-25 | Lost Circulation Occurred |
1983-07-28 | Finished Drilling |
1983-07-28 | Well Mode changed to Drilled and Cased |
1983-07-31 | Drill Stem Test Performed |
1983-08-02 | Liner Casing Operation Performed |
1983-08-22 | Perforation Treatment Performed - Jet Perforation |
1983-08-25 | Well Began Production |
1983-08-25 | Well Fluid changed to Crude Oil |
1983-08-25 | Well Mode changed to Pumping |
1984-02-12 | Perforation Treatment Performed - Jet Perforation |
1984-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-05 | Perforation Treatment Performed - Jet Perforation |
1999-08-05 | Well Log Performed |
2002-03-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-20 | Plug Back Performed |
2002-03-20 | Well Fluid changed to Crude Oil |
2002-03-20 | Well Log Performed |
2002-03-20 | Well Mode changed to Abandoned Zone |
2002-03-23 | Perforation Treatment Performed - Jet Perforation |
2002-03-23 | Well Log Performed |
2002-03-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-09-19 | Plug Back Performed |
2018-09-19 | Well Log Performed |
2018-09-20 | Well Log Performed |
2018-09-21 | Well Log Performed |
2018-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-09-22 | Perforation Treatment Performed - Jet Perforation |
2018-09-22 | Well Log Performed |
2018-09-23 | Perforation Treatment Performed - Cement Plug |
2018-09-23 | Perforation Treatment Performed - Cement Squeeze |
2018-09-23 | Perforation Treatment Performed - Jet Perforation |
2018-09-23 | Plug Back Performed |
2018-09-23 | Well Log Performed |
2018-09-24 | Perforation Treatment Performed - Cement Plug |
2018-09-24 | Perforation Treatment Performed - Cement Squeeze |
2018-09-24 | Plug Back Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1983-06-30 | 1151.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-08-22 | Perforation | 1534.00 | 1535.00 | 13 |
2018-09-19 | Packing Device Capped w/Cement | 1391.80 | 1399.80 | 0 |
2018-09-19 | Packing Device Capped w/Cement | 1321.80 | 1329.80 | 0 |
2018-09-22 | Perforation | 694.00 | 695.00 | 13 |
2018-09-22 | Acid Treatment | 694.00 | 695.00 | 0 |
2018-09-23 | Cement Squeeze | 694.00 | 695.00 | 0 |
2018-09-23 | Cement Plug | 679.00 | 688.40 | 0 |
2018-09-23 | Perforation | 336.00 | 337.00 | 13 |
2018-09-24 | Cement Squeeze | 336.00 | 337.00 | 0 |
2018-09-24 | Cement Plug | 321.70 | 332.80 | 0 |
1984-02-12 | Perforation | 1530.50 | 1532.50 | 13 |
1984-02-14 | Acid Treatment | 1530.50 | 1532.50 | 0 |
1999-08-05 | Perforation | 1524.00 | 1536.00 | 13 |
1999-08-05 | Acid Treatment | 1524.00 | 1536.00 | 0 |
2002-03-20 | Packing Device Capped w/Cement | 1511.00 | 1519.00 | 0 |
2002-03-23 | Perforation | 1336.00 | 1340.00 | 13 |
2002-03-23 | Perforation | 1343.50 | 1346.00 | 13 |
2002-03-24 | Acid Treatment | 1336.00 | 1346.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 1312 | 0.0 | 0.0 | 0.0 |
1984 | 5557 | 0.0 | 0.0 | 0.0 |
1985 | 6849 | 0.0 | 0.0 | 0.0 |
1986 | 5970 | 0.0 | 0.0 | 0.0 |
1987 | 7454 | 0.0 | 0.0 | 0.0 |
1988 | 8376 | 0.0 | 0.0 | 0.0 |
1989 | 8563 | 0.0 | 0.0 | 0.0 |
1990 | 8528 | 0.0 | 0.0 | 0.0 |
1991 | 8141 | 0.0 | 0.0 | 0.0 |
1992 | 8186 | 0.0 | 0.0 | 0.0 |
1993 | 7850 | 0.0 | 0.0 | 0.0 |
1994 | 8735 | 0.0 | 0.0 | 0.0 |
1995 | 7480 | 0.0 | 0.0 | 0.0 |
1996 | 4169 | 0.0 | 0.0 | 0.0 |
1997 | 504 | 0.0 | 0.0 | 0.0 |
1998 | 24 | 0.0 | 0.0 | 0.0 |
1999 | 2605 | 0.0 | 0.0 | 0.0 |
2000 | 8475 | 0.0 | 0.0 | 0.0 |
2001 | 854 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1983-07-25 | Lost Circulation | 1548.00 | 1653.70 |
2018-09-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]